Advanced Implantation Detector Array (AIDA)

Slides:



Advertisements
Similar presentations
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Advertisements

Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics & Astronomy The University of Edinburgh presented by Tom Davinson.
Technical Solutions for High Vacuum Compatible FEE for the EXL Recoil Detector Vacuum operating pressure? bakeout temperature? what’s in the vacuum system,
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration Tom Davinson.
AIDA Update presented by Ian Lazarus on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson School of Physics & Astronomy.
Advanced Implantation Detector Array (AIDA): Update & Issues presented by Tom Davinson on behalf of the DESPEC-DSSD/AIDA collaboration Tom Davinson School.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
ASICs for HiSpec and DeSpec Ian Lazarus NPG. Hispec and Despec.
AIDA Update presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson School of Physics & Astronomy.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.

Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
Decay Spectroscopy at FAIR with AIDA presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson.
Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented.
M. Labiche - INTAG workshop GSI May Se - D prototype for the focal plane of the PRISMA spectrometer (Task4) Digitisers for SAGE & LISA (task1)
Tom Tom Davinson School of Physics DESPEC DSSD Working Group Status & Open Issues.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Status report on MURAY telescope R&D
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
DESPEC A Algora IFIC (Valencia) for the Ge array working group.
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
Status of the Solenoid Status of procurement Plans for transport Storage and tests on arrival at CERN Installation in the ISOLDE Hall Location Footprint.
High-precision timing discussion 1 David Berge University of Amsterdam & Nikhef GRAPPA Gravitation AstroParticle Physics Amsterdam Research Priority Area.
Status of the Advanced Implantation Detector Array (AIDA) BRIKEN Collaboration Workshop Valencia, July 2015 Alfredo Estrade on behalf of the AIDA collaboration.
AIDA: introduction Advanced Implantation Detector Array (AIDA) UK collaboration: University of Edinburgh, University of Liverpool, STFC Daresbury Laboratory.
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Search for Proton Radioactivity in the Trans-lead and Sub-tin Regions Zhong Liu University of Edinburgh On behalf of the AIDA Collaboration (Edinburgh,
GEM Integrated PCB readout and cooling
Deep-sea neutrino telescopes
MICE RF System Power Supplies, Control and Monitoring Status report
Update of MVD services and requests
* Experimental technique
The interaction region for FIRST (status report)
Baby MIND Status on T9 E. Noah 6th July 2017.
SIGMA: a detector for γ-ray spectroscopy & imaging Dr Laura AGATA/GRETINA Collaboration Meeting
Search for Proton Radioactivity in the Trans-lead and Sub-tin Regions
AIDA: introduction Advanced Implantation Detector Array (AIDA)
DAQ Racks, Bins and Modules Internal Design Review
FEE Electronics progress
AIDA Commisioning Test
Implantation detector as active stopper Rakesh Kumar, P. Doornenbal, I
Advanced Implantation Detector Array (AIDA)
Advanced Implantation Detector Array (AIDA)
Advanced Implantation Detector Array (AIDA)
Presentation transcript:

Advanced Implantation Detector Array (AIDA) HISPEC/DESPEC meeting 25 February 2019 presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson School of Physics & Astronomy The University of Edinburgh

Done 1x MSL type BB18(DS)-1000 installed 1x Plastic scintillator installed DSSSD+Plastic Scintillator operate together OK with -ray sources AIDA FEE64 firmware updated now supports 1GHz, 64 bit White Rabbit timestamp

To Do Plastic scintillator – mechanical issues identified extant design OK for upstream detector increase transverse dimensions for downstream detector Plastic scintillator – AIDA DSSSD interactions for high energy ions? effect of high energy signals? no scintillator wrapping – light? crosstalk? Reduce AIDA snout length by 5cm to accommodate length of plastic scintillator cables White Rabbit compatible AIDA ( ‘Mark 2’ ) merger Occasional timewarps and other format issues observed Under investigation by Vic Pucknell, STFC DL Forward AIDA data to MBS Obtain AIDA+FATIMA data with pulser and sources

Acknowledgements AIDA collaboration http://www2.ph.ed.ac.uk/~td/AIDA/welcome.html Edinburgh Corrigan Appleton, Peter Black, Carlo Bruno, Oscar Hall UKRI STFC Daresbury Laboratory Ian Burrows, Mike Cordwell, Alan Grant GSI Juergen Gerl, Magda Gorska, Nic Hubbard, Nik Kurz, Henning Schaffner, Arici Tugba

AIDA Support Stand – the plan 8cm x 8cm & 8cm x 24cm DSSSDs Overhead services routing ac mains power 2x Gbit Ethernet cooling water White Rabbit etc Temperature controlled cooling water +20 ºC https://www2.ph.ed.ac.uk/~td/AIDA/Information/information.html

S4: AIDA + FATIMA

AIDA DSSSD: MSL type BB18(DS)-1000 Detail – 1 (of 4) connectors, strips, bond wires, bias ring, multi-guard ring, field plate etc

AIDA DSSSD: cabling Kapton PCB + 3M 1245 wrapped Samtec ribbon cables

AIDA: snout and FEE64s

AIDA: 19” rack hardware For 4x 8cm x 8cm DSSSDs (1024 channels) USB-controlled ac mains relay FEE64 PSUs Gbit network switch MACB WR timestamp distribution Pulser Detector bias