North Carolina Department of Insurance Office of State Fire Marshal

Slides:



Advertisements
Similar presentations
Grounding Electrodes.
Advertisements

The Electrical GuruTM Paul W. Abernathy,CME
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Bonding Requirements For Gas Piping Systems Bob Torbin October 2007
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
Telecom Cabling Grounding and bonding.
Open Records from the OAG Perspective Amanda Crawford Division Chief Open Records Division.
Volunteer Fire Department Fund NC General Statutes
EET Survey of Electronics
Requirements and Responsibilities
FORM 1001A – NOTIFICATION OF WELL SPUD. This presentation will assist you in the completion of the Form 1001A. The notification of well spud. Date of.
FAMILY EDUCATIONAL RIGHTS AND PRIVACY ACT Electronic Signatures This work is the intellectual property of the author. Permission is granted for this material.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
The Art of Grounding. Importance of Grounding Earlier, we said that the load center was the heart and soul of the electrical system. Following that trend,
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
WELCOME Getting Smart About Home Modifications A Webinar Series Sponsored by the Wisconsin Department of Health Services W ebinar #5 Permits, Zoning and.
Ontario Building Code Revision effective Jan 1, 2015
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development.
Two Minute Drill Number 23- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Virginia Department of Fire Programs Training Course Request Form Tutorial.
Concrete encased electrode Main 20’ NEC “Equipment Grounding Conductors, grounding electrode conductors and bonding jumpers shall be connected.
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
Electrical Safety Authority
Building Permit Contractor Round Table 8731 Citizens Drive New Port Richey, Florida Wednesday – July 10, :00 pm to 4:00 pm.
Inspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses Educational Overview.
Grounding the Electrical System Reference: AAVIM “Electrical Wiring” Created May 2007.
N.E.C. Installation Techniques and Common Violations
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
GEOTHERMAL WELLS What is Geothermal Heating and Cooling? Conventional heating and cooling systems use air to transfer heat into and out of buildings. Geothermal.
Georgia Tech Safety and Health Consultation Program
DHCR and TPU Update David B. Cabrera, Esq. Borah, Goldstein, Altschuler, Nahins & Goidel, P.C. 377 Broadway New York, New York Tel: (212)
Grounding the Electrical System
Washoe County Board of Adjustment
Cross Connection Survey Training
Understanding the Uniform Guidance Effective Dates
Backflow Prevention and Cross Connection Control Update
Smitty’s Two Minute Drills
Grounding the Electrical System
Standards and Certification Training
Rules for Existing Municipal Solid Waste Landfills
ARC SEMINAR ON PLANNING & BUILT ENVIRONMENT 5TH MAY 2018
Electrical Receptacle Testing
TxDOT Utility Related Issues
Division of Energy, Mineral, and Land Resources
FORM 1001A – NOTIFICATION OF WELL SPUD
General tripartite board composition and selection information
Welcome to.
EET 323 – Electrical System Design Lecture 9: Grounding
Butte County Board of Supervisors November 8, 2016
What is OAL? The Office of Administrative Law (OAL) ensures that agency regulations are clear, necessary, legally valid, and available to the public. OAL.
Module 1 Requirements and Responsibilities
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
State Electrical Division North Carolina Department of Insurance
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
Washoe County Board of Adjustment June 6, 2019
Presentation transcript:

North Carolina Department of Insurance Office of State Fire Marshal Risk Management State Electrical Division 2017 State Electrical Code 250.53 - Grounding Electrodes For Single Family Dwellings

Notice: The following illustrations are approved by the State Electrical Division of the North Carolina Department of Insurance, Office of State Fire Marshal. These illustrations are intended to demonstrate but not supersede the official written interpretations found at the following web address: http://www.ncdoi.com/OSFM/State_Electrical_Division//Default.aspx?field1=State_Electrical_Code_and_Interpretations Joseph Starling Chief State Electrical Engineer & Inspector Illustrated by: Danny Thomas State Electrical Inspector

Only one? Or two? Date: June 12, 2018 2017 Electrical Code Acme Meter 1 2 3 4 5 Subject: Grounding Electrodes for Single Family Dwellings Section 210.53(A)(2) and (D)(2) Question 1: If only ground rods are used as an electrode system for a single family dwelling, are two required? Only one? Or two?

250.53(A)(3) requires rods to be located a minimum of 6 feet apart Date: June 12, 2018 2017 Electrical Code Subject: Grounding Electrodes for Single Family Dwellings Acme Meter 1 2 3 4 5 Section 210.53(A)(2) and (D)(2) 250.53(A)(3) requires rods to be located a minimum of 6 feet apart (If the GEC is not continuous then 2 clamps may be required) If more than 25 ohms then rod is required to be supplemented 25 ohms or less only one rod required 250.53(A)(2) Exception However, the installer is required to assure this system meets this requirement and submit proof that is acceptable to the local electrical inspector Minimum 6 feet apart

Subject: Grounding Electrodes for Single Family Dwellings Date: June 12, 2018 2017 Electrical Code Metal Water Pipe Subject: Grounding Electrodes for Single Family Dwellings Section 210.53(A)(2) and (D)(2) Question 2: If a metal underground water pipe is used as part of an electrode system and is supplemented with a ground rod, is another grounding electrode required to supplement the ground rod?

Date: June 12, 2018 2017 Electrical Code Subject: Grounding Electrodes for Single Family Dwellings Section 210.53(A)(2) and (D)(2) Answer 2: No. The requirement of section 250.53(D)(2) requires one supplement electrode of a type chosen from sections 250.52(A)(2) – (A)(8), in which a rod is listed in section 250.52(A)(5). Both the water pipe and the rod must comply with the installation requirements of section 250.53(A). Because the water pipe and the rod make two electrodes, each supplement the other, thus 250.53(A)(2) is satisfied.

Connection must be made within first 5 feet 250.68(C)(1) METAL WATER PIPE Connection must be made within first 5 feet 250.68(C)(1) (Unless permitted otherwise by exception) Only one rod required as supplement for metal water pipe 250.53(D)(2) METAL WATER PIPE ELECTRODE Permitted if 10 feet or more in direct contact with the earth 250.52(A)(1)