Vacuum System Design for the Target Monolith System

Slides:



Advertisements
Similar presentations
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
Advertisements

Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
AW Rayment & TW Clyne Department of Materials Science & Metallurgy University of Cambridge, UK Design and Commissioning of a Chamber for Controlled Atmosphere.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Patrick Thornton, SNS/FPE June 9, 2008
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
Temperature Control Loop
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Center for Materials for Information Technology an NSF Materials Science and Engineering Center Vacuum Systems Lecture 6 G.J. Mankey
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
PIMS IN INSTITUTE FOR NUCLEAR STUDIES Brazing Andrzej Soltan Institute for Nuclear Studies.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Vacuum Fundamentals High-Vacuum Technology Course Week 7 Paul Nash HE Subject Leader (Engineering)
Vacuum issues concerning the Proton Source and LEBT Salvo Marletta, Luigi Celona, Lorenzo Neri, Franco Chines, David Mascali.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
ESS-Bilbao: MEBT vacuum standarization
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
ESS Vacuum Standardization
Cooling Water and Heat Recovery system Thomas Hjern Harald Bäck Design Leader Process systems Conventional Facilities Accelerator Review November 3-4,
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Final Design Cryogenic and mechanical configurations
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Sub-system integration for the VBOX
Proximity Cryogenics P&IDs meeting
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
Leak Detection Tutorial Work
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Block 4 and Cluster D - Safety
XFEL Collimation and Beam Switchyard Vacuum Issues
BASIC VACUUM PRACTICE.
ESS elliptical cryomodule
Jaroslaw Fydrych SHC Lead Engineer
Cryomodule Assembly Plan
ISRC and LEBT Vacuum System Design
RSFs & categorisation 20 May, 2019.
APTM and GRID interface requirement PBIP and PBW
Operation of Target Safety System (TSS)
Boiler Safety Valve Regulations
Target Safety System Interfaces
Vacuum Control System for Monolith Vacuum
SNS PPU Cryomodule Instrumentation
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Vacuum System Design for the Target Monolith System Peter Ladd Vacuum Systems Engineer and ESS Vacuum Team European Spallation Source ERIC 2019/04/29

Topics Addressed Operational Capabilities of the Monolith Vacuum Systems Monolith Vacuum Systems Interface Documents Operational and Design Pressure for the Monolith Vacuum Systems Primary Monolith Vacuum Systems and Functions Vacuum Piping Outline Vacuum Pump Performance Impact of Pump Inlet Conductance Pump down for Various Pump Combinations Removal of Water Vapour P&ID Vacuum Pumping Systems Layout of Vacuum Systems Major Mechanical Equipment List Major Instrumentation List

Operational Capabilities of the Monolith Vacuum Systems The monolith vacuum systems are designed to maintain the vacuum environment in the monolith vessel required for operations. These systems are designed to permit continuous operation following a single equipment failure within these system but excludes failures of non-functional components i.e. piping, wiring etc. The operational reliability of interfacing equipment is outside the scope of the vacuum system and is not addressed. Access to the monolith vacuum systems during operations is prohibited including all areas within the “Triangular Room” (Pump Room) and the “Connection Ring Gallery”. Operational access to all systems is provided through the vacuum control system, located in the “Utility Room”. Redundant systems (and components) are provided where considered necessary to allow continued operations following a single equipment failure with full or limited capability.

Monolith Vacuum Systems Interface Documents The current interface documents will need t o be reviewed and updated to reflect the finding and determinations made at the Monolith Vacuum Systems CDR. The CDR design of the Monolith Vacuum Systems is significantly different to that proposed at the PDR and these changes will need to be reflected in the Interface Documents, although no significant impact on other systems is anticipated.

Operational and Design Pressure for the Monolith Vacuum Systems “Requirements and Guidelines” specified in the “ESS Monolith Vessel Vacuum Rules, ESS-0057844” are based on the assumption that the nominal operating pressure of the monolith vessel will be limited to 1 bar differential and the maximum upset pressure will be limited 1.5 bar absolute differential pressure in accordance with the Swedish ordinance for non-pressure vessel components. Operating Pressure Standard off-the-shelve vacuum equipment is designed for use at <1 bar differential pressure and will not meet the Swedish ordinance AFS 2005:2 at higher differential pressures. If a higher monolith pressure were selected, standard off-the-shelf vacuum equipment would not be available and equipment would need to be qualified as “pressure equipment” i.e. designed and qualified to meet a pressure >1 bar differential. Vacuum System Design and Operating Pressures: The system design and equipment identified for use in this CDR will comply with the “ESS Monolith Vessel Vacuum Rules, ESS-0057844” i.e. design operating pressure < 1 bar differential and the maximum upset pressure will be limited 1.5 bar absolute differential pressure .

Primary Monolith Vacuum Systems and Functions The Monolith Vacuum Systems will perform the following primary functions: Roughing system, used to evacuated the monolith volume and provide cross over to high vacuum operation, High vacuum operation, has 3 primary functions: Provide sufficiently low vacuum (<10E-3 mbar) for operation of cryo-condensing coils for pumping water vapour, Provide sufficiently low vacuum (<10E-3 mbar) for leak testing both during installation, start up and operational maintenance periods as needed. Evacuation and maintaining the monolith vessel at high vacuum vacuum during operations,

Vacuum Piping Outline

Vacuum Pump Performance

Impact of Pump Inlet Conductance

Pump down for Various Pump Combinations - 1 Design parameters Monolith Design Parameters: Free volume: 76.3 m3 Surface area: 2,362 m2 Nominal Temperature: 80°C Vacuum Design Parameters: Outgassing rate: 1*10-8 mbar*L/s/cm2 Constant leak rate into vessel: 0.05 mbar*L/s Notes on Vacuum Design Parameters: The outgassing rated used is the anticipated rate at the 10 hour point i.e. vessel has been under vacuum for 10 hours before pump down undertaken. The pump down calculations use a fixed outgassing rate. Leak Testing with the proposed vacuum system: Detection time constant, 45 seconds to 95%, leak detector backing TMP's, monolith pressure < 1E-3 mbar Clean up time,10 minutes, based on 6 decade reduction in helium partial pressure, monolith pressure < 1E-3 mbar

Pump down for Various Pump Combinations - 2

Removal of Water Vapour, 1 Impact of Pressure and Temperature on phase state on water removal Water Phase Diagram Curtesy: At expected operating temperature, sublimation rate is: ~ 40 mbar L/cm2 s Pumping speed of the mechanical pumps at 6.05 mbar (ice point) is 22 mbar L/s and the cryo-condensing coil at 10-3 mbar is 7 mbar L/s

Removal of Water Vapour, 2 Prospective on In-Leakage

Removal of Water Vapour, 3 Mechanical Pumping

Removal of Water Vapour, 4 Cryo-condensing Coil , Coil sizing

P&ID Vacuum Pumping Systems

P&ID Roughing System

P&ID High Vacuum System

P&ID Cryo-condensing Pumping System (Water Pumping)

P& ID PBW and PBW Vessel

Layout of Vacuum Systems, 6-1 Line sizing The line diameters for the various systems has been optimized over the operational pressure range using conductance equations incorporating laminar, transitional and molecular flow regimes for the lines lengths of the various systems.

Layout of Vacuum Systems, 1 Vacuum System Connection Points, connection ring and PBW vessel All systems are connected to the monolith connection ring or proton beam vessel (PBV). Port allocations is as follow: Port Reference Port Size Function X03 DN200CF Rough line Monolith vacuum gauging Calibrated leak X06 DN350CF Cryo-pod installation X55 DN40CF X58 High vacuum pump (TMP) connection X88 Connection Ring Port Allocations Port Reference Port Size Function X48 DN100CF Connection for evacuation and pressurization of the BPW inflatable seals X52 DN40CF PBV evacuation and venting connection PBW Vessel Port Allocations

Layout of Vacuum Systems, 2 Connection Ring Layout, port allocation for the vacuum systems is 1027

Layout of Vacuum Systems, 3-1 Vacuum Equipment installed in Connection Ring (CR) Gallery Roughing system installation: Roughing line with instrumentation and leak calibration connections Roughing line routed from CR, port X03, to shield wall penetration Monolith vacuum gauging Calibrated leak for MSLD calibration Rough line is also used for venting the monolith Cryo-pod installation (2): Cryo-pod mounted to CR via high vacuum isolation gate valve, ports X06 and X88 Each Cryo-pod incorporates the following equipment: Cryo-chiller cooling lines, supply and return, routed from cryo-pod to shield wall penetration Evacuation valve, with cryo-pod evacuation line, routed from cryo-pod to shield wall penetration Vent valve, open to CR gallery Water drain line valve and drain line , routed from cryo-pod to shield wall penetration

Layout of Vacuum Systems, 3-2 Vacuum Equipment installed in Connection Ring (CR) Gallery High vacuum system installation High vacuum system mounted to CR at port X 58 via a connection tee to provide 2 connection ports for 2 independent high vacuum systems, Each high vacuum system installation incorporates the following equipment: High vacuum gate valve mounted to the tee, Turbomolecular pump (TMP) nominally rated at 1200 l/s, Pfeiffer Hipace 1200 or equivalent, Vent valve mounted to the backing line of the TMP, Backing line routed from the TMP to the shield wall penetration Cooling water, supply and return Vacuum Instrumentation Port Vacuum instrumentation mounted to CR at port X 88 Vacuum gauging for monitoring monolith vessel pressure, Residual gas analyzer RGA for monitoring of monolith vacuum environment

Layout of Vacuum Systems, 3-3 Vacuum Equipment installed in Connection Ring (CR) Gallery PBW vessel vacuum system installation PBW Vessel evacuation system, connected to Proton Beam Vessel (PBV) at X42 Evacuation line routed from X42 to the shield wall penetration PBW pillow seal evacuation and inflation system PBW pillow seal evacuation and inflation system, connected to to Proton Beam Vessel (PBV) at X48 4 lines routed from closing flange of PBV servicing front and rear grooves and pillows, individual Turbo pumping stations (groove pumping) and pressurization line (pillow inflation) serving each set of lines. Turbo pumping stations nominally rated at 67 l/s, Pfeiffer HiCube 80 Eco or equivalent,

Layout of Vacuum Systems, 4 Shield wall penetration Space allocate for vacuum system penetration of the shield wall is limited to a hole of 250mm diameter. The following table shows the allocation of space in the penetration:

Layout of Vacuum Systems, 5-1 Vacuum Equipment installed in Triangular Room (Pump Room) Roughing system installation: 160mm roughing line routed from shield wall penetration to roughing pumps, supported by pipe hangers. Two vertical drops, reducing to DN100, for roughing pump connection, Vertical drop incorporates DN100 formed bellows and isolation gate valve, DN100 series 14 or equivalent. Two (2) NeoDry 300E vacuum pumps, with DN100 inlet connection, positioned in series, directly below roughing line, incorporating gas ballast and exhaust ports, Exhaust port DN25 routed to off gas system and drain Cryo-pod installation: 63mm evacuation line routed from shield wall penetration to evacuation pumps, supported by pipe hangers. Two vertical drops, reducing to DN40, for evacuation pump connection, Vertical drop incorporates DN40 formed bellows and isolation gate valve, DN40 series 14 or equivalent. Two (2) NeoDry 7E vacuum pumps, with DN40 inlet connection, positioned in series, directly below evacuation line, incorporating gas ballast and exhaust ports,

Layout of Vacuum Systems, 5-2 Vacuum Equipment installed in Triangular Room (Pump Room) Cryo-pod installation, cont’d: Cryo-chiller cooling lines, supply (2) and return (2), routed from shield wall penetration to cryo-chillers, Cryo-chillers (2), location in pump room TBD, Cryo-pod evacuation line, routed from shield wall penetration to off gas system, Water drain line, routed from shield wall penetration to water pump exhausting to drain, High vacuum system installation 100mm backing line routed from shield wall penetration to roughing pumps, supported by pipe hangers. Two vertical drops, reducing to DN40, for backing pump connection, Vertical drop incorporates DN40 formed bellows and isolation gate valve, DN40 series 14 or equivalent, Two (2) NeoDry 60E vacuum pumps, with DN40 inlet connection, positioned in series, directly below backing line, incorporating gas ballast and exhaust ports, Exhaust port DN25 routed to off gas system and drain Vertical drops also incorporates DN40 control valve, VAT series 615 or equivalent for MSLD connection. Exhaust port for MSLD, DN25 routed to off gas system

Layout of Vacuum Systems, 5-3 Vacuum Equipment installed in Triangular Room (Pump Room) PBW Vessel vacuum system installation 63mm pumping line routed from shield wall penetration to mechanical pumps, supported by pipe hangers. Two vertical drops, for pump connection, Vertical drop incorporates DN40 formed bellows and isolation gate valve, DN40 series 14 or equivalent. Two (2) NeoDry 7E vacuum pumps, with DN40 inlet connection, positioned in series, directly below pumping line, incorporating gas ballast and exhaust ports, Exhaust port DN25 routed to off gas system and drain PBW pillow seal inflation system installation 2 Air pressurization lines (pillow inflation) complete with pressure regulators and filters

Major Mechanical Equipment List 6-1 Roughing System installation: 1 VAT, DN100 series 48 roughing valve, 2 Kashiyama Neodry 300E pumps, 2 VAT, DN100 series 14 isolation gate valve, 1 VAT, DN25 Series 264 or equivalent vent valve Cryo-pod installation: 2 VAT, DN350 series 48 isolation gate valve, 2 cryo-pods with cryo-condensing coils, custom designed for ESS installation, 2 evacuation valves, VAT, DN63 Series 264 or equivalent, 2 vent valves, VAT, DN16 Series 264 or equivalent, 2 Telemark 1800 cryo-chiller or equivalent, 2 sets, supply and return, vacuum jacketed cooling lines 1 self priming diaphragm water pump

Major Mechanical Equipment List 6-2 High vacuum system installation 2 High vacuum gate valves, VAT, DN350 series 48 or equivalent 2 Turbomolecular pumps (TMP), Pfeiffer Hipace 1200 or equivalent, 2 Vent valves mounted to the backing line of the TMP, VAT, DN16 series 264 or equivalent 2, Backing valve VAT, DN40 series 264 or equivalent, 2 Kashiyama Neodry 7E pumps, 2 VAT, DN40 series 14 isolation gate valves, PBW vessel vacuum system installation 2 VAT, DN63 series 48 roughing valve, 2 VAT, DN100 series 14 isolation gate valve, PBW pillow seal evacuation and inflation system Turbo pumping stations nominally rated at 67 l/s, Pfeiffer HiCube 80 Eco or equivalent,

Major Instrumentation List Pirani Gauge, as required Cold Cathode Gauge, as required Calibrated leak, 1 Residual gas analyzer, 1 Mass spectrometer leak detector (MSLD), 1

Thank you for your attention! New Frontiers to be conquered and advancements to be made in neutron sciences with the long pulse and power offered by the European Spallation Source Thank you for your attention! AVS 63rd International Symposium 8th November 2016