8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Wednesday 21 March 2012.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Monday fill with 1092 bunches (6 h stable beams)
Saturday 30th June - Sunday: Rocky !
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Barbara Holzer, Jorg Wenninger
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Mike Lamont, Jorg Wenninger
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Chromaticity can make a difference…
Tuesday Loss maps in the night:
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Tuesday 9th November 10:02 Fill beams dumped
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Summary week 18 Intensity ramp up & production
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Sat morning Until 12:40: Loss maps at injection
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Friday morning 08:00 Stable beams with 840b.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
LHC Morning Meeting - G. Arduini
Monday 10th December - morning
Wednesday morning / afternoon
Saturday Luminosity production 1380 bunches
Saturday 26 November 2011.
Presentation transcript:

Tuesday 1.5.2012

Monday Morning and Afternoon 06:03 Power glitch – 400 kV Site wide glitch. All sectors tripped, SPS, PS, and all experiment magnets except CMS tripped off. Cryogenics partially affected (S12, S34, S45, S81). Cold compressor Pt2 stopped (QURCA-P2), quickly restarted. Access for a QPS reset (RQ9.L1), for a ventilator fault in UX45, and for resetting the TCL.5R5.B1 (UJ56). 10:00 Cryo Pt2 is back. Some circuits with problems left over. 10:15 Lost again cold compressor in Pt2 during switch on of compensator in Pt2. 13:30 Cryo recover in record time. Start pre-cycling. 15:00 injection kicker (MKI8) synchronization. 16:30 – 18:00 Waiting for 50 ns beam from PS - RF problem. 19:00 Filling 84+4b.

Cryo recovery

Summary re-synchronisation MKI8 from Etienne Carlier Kick delay increased by 40ns (new value 83190ns) Kicks resynchronised with 10ns delay between magnets (beam tof) Synchronisation with AGK checked for bucket 1 & 31181 Kick length adjusted to 8.040us for the 4 magnets IQC thresholds for kick lengths adjusted (same thresholds for the 4 kicks) IQC thresholds for kick delay unchanged (same working point as before the TS) Still need checking with 144 bunches

Monday Evening and Night 20:16 Stable beams fill 2576, 84+4b – length scale calibration CMS and ATLAS. Incorporated lumi scan settings for IR1 + IR5 as they have now reproduced for 3 fills. To give a more reasonable initial luminosity to LHCb: trim in +- 50 um in the separation/leveling plane. To be fined tuned in the next fills. 22:15 CMS length scale cal. finished. CMS separated for very low pile-up TOTEM running. Lumi of ~ 0.5e+30. 0:47 ATLAS length scale calibration finished. TOTEM and ATLAS pixels need ~1hr more of stable beams in these conditions 2:31 beams dumped by operator

LHCb with negative polarity (Joerg): The LHCb lumi passes through a very small spike while the V xing angle bump is ramping up. The values are very small (the peak lumi on BRAN is > 40), and they are smaller than in the previous fill due to an additional separation (see plot) that was added in the period of ramp up, when the NET H xing angle is very small. From the V offset and the crossing angle, this looks like main-sat collisions at ~1.5m (or ~5 ns) from the IP. In this fill the separation was set to 0.04 mm / beam. For the next fill we set it to 0.06 mm / beam.

Wednesday Morning - 480 bunches 3:26 re-injecting 4:16 BPMSA.B4R6.B2 triggered the dump but not clear why. Nothing obvious in the PM. Only B2 dumped. 5:01 Again B2 dump by BPM IP6, when injecting batch onto slot where pilot is. Suspect that the interlock is triggered by the bunch count mismatch as seen by the BPMS when the injection cleaning removes the pilot IR6-BPM bunch count was different between system A and B during the 4th injection (injection cleaning removes probe?). The 4th injection starts at bucket 8941, exactly where the probe sits, and the dump occurred while the SPS was at FB (moment of injection cleaning). 5:46 Successfully injected the 4th injection on both beams with injection cleaning disabled. Problems with SPS scraping 8:05 stable beams

Loss maps at flat top (Gianluca Valentino) Loss Maps are OK: Betatron and off-momentum (+500 Hz) from Sunday Contrary to the factor 20 decrease in losses observed for the TCTVA.4R2.B2 which previously had the wrong setting in collisions, there is no observable decrease for the TCTVA.4R1.B2 which previously had a wrong setting at flat top. However, the losses are quite low: factor 1E6 below the TCP.

Issues Parking settings for TCSG.5L3.B1 need to be corrected by an expert Position Interlock BPMs in point 6 triggering on pilots Planning Recheck phasing of the cavity sum B1 (maybe access UX45) - 1h Physics with 840 bunches plus a non-colliding 12b train (after polarity change LHCb) Physics with 1380 bunches Loss maps at collision (vertical beam 1). FMCM check RD34 IP7 (set to OFF).

END

LHCb tilted crossing Translating of the procedure into functions: 0 – 40 sec: Reduce vertical separation -650 um-> -100 um 40 – 60 sec: create vertical crossing angle 0 -> + 90 urad 100 sec – 220 sec: create horizontal separation 0 -> + 42 um to get the beams in the leveling plane (diagonal) collapse horizontal crossing angle -> 0 urad All positions calculated relative to the measured (30.3.) position of the head-on collisions. All signs apply for beam 1 and have the opposite sign for beam 2. All settings for positive LHCb polarity.