Facilitate differentiation of Purpose

Slides:



Advertisements
Similar presentations
Introduction. What is ISO14001? A documented system of all impacts a company are having on the environment. A detailed strategy to reduce these impacts.
Advertisements

May 18, 2005 Oakdale Irrigation District Water Resources Plan.
International Telecommunication Union D3 Methodology Objectives for this meeting from Chairman of WG-A Yoh Somemura (NTT, Japan) Vice Chairman of FG on.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Proposed Changes to DEQ Heating Oil Guidance. Background Present guidance developed in 2006/early 2007 became effective in March heating oil.
ISO General Awareness Training
ENVIRONMENTAL MANAGEMENT PLAN
G D 1 LIGObservatory Environment David Shoemaker 3 July 2001.
Environmental Management Plan. Background Environmental Impact Assessment has made commitments to: –Meet defined standards –Implement defined mitigation.
Reference, Retention and Reserve Samples
Adrian Abbott & Jody Asquith Benchmarking Energy Consumption in Coal Mining.
Noise Assessment Brett Williams. Scope The measurement of the existing ambient noise (day and night time). A noise study of the future impact during construction.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
NYSDOT GreenLITES “ G reen L eadership I n T ransportation E nvironmental S ustainability” Modified from original by Mark Arner, PE, C&S Engr.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Basic Principles of GMP
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
1 Research Infrastructures in FP7 EUDET Annual Meeting 19 October 2006, Munich Dr. Gerburg Larsen European Commission, RTD-B.3 - Research Infrastructures.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Requirements Traceability: Planning, Tracking and Managing Requirements Presenter: Paula R. Maychruk, BV/TEd., CAPM, CBAP.
Presentation to the Portfolio Committee on Water and Environmental Affairs National Environmental Management Laws Amendment Bill.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Course AE2104 Environmental Measuring and Monitoring.
[ISO Water footprint – potential standard]
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
SEA in the Czech Republic Prague, 24 September 2008.
Nuclear Research and consultancy Group European Radiation Survey Site Execution Manual Leo van Velzen ENVIRONET Kick-off meeting Vienna 23 – 26 November.
MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION July 21, 2005.
Status of the Intergovernmental agreement on the Dniester River Basin Round table “Towards Integrated Management of the Transboundary Dniester River Basin:
Additional site characterization questions 2) which determinants make the food system vulnerable (to disruption)? 3) which determinants are most sensitive.
Water Director Meeting 30th November 2006, Inari / SF WFD and Hydromorphology Technical report on “Good practice in managing the ecological impacts of.
Regulation of Geothermal Resources in Colorado
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Developing innovative and green solutions for the agriculture, food processing industry and water treatments. FEEDING THE PLANET: BETTER PRODUCTION, WASTE.
E-Waste TCS Environmental Sustainability, Health & Safety
Fort Stanwix National Monument Energy Audit Contract
Project Management module
Scope and Compliance Survey
Towards Modern Environmental Impact Assessment (EIA) in Uzbekistan
State of Implementation of CEA in Germany
10 Stages Of the Engineering Design Process
Combined physical and monetary presentations
Synthesis of the intercalibration process Working group 2.5.
ECTS Implementation Discussion in small groups on the question:
Activities of the UNECE-UNODC Task Force on Victimization Surveys
ISCED 2011 joint operational manual: Update
WG 2.5 Intercalibration.
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
Developing guidance with Member State-regulators to implement bioavailability-based environmentally quality standards for metals. Graham Merrington WG.
CIS-Workshop on River Basin Management Plans 8 and 9 May 2006 Bonn
EU Water Framework Directive
A function is a group of statements that exist within a program for the purpose of performing a specific task. We can use functions to divide and conquer.
Commission report on Art. 8 WFD Monitoring programmes
Draft Guidelines for application of the Unique Identifier (UI)
Results of a Research Project by Ecologic and the University of Kassel
on a protocol for Intercalibration of Surface Water
Temporary Works Co-ordinators
WFD and Hydromorphology
Editing Board Meeting Status Expert Groups (Transmission, Axle)
Development of determination and verification manual (DVM)
Typology and Intercalibration Typology System
Environmental Priorities Environmental Impact Assessment
How is an M & E framework derived from the logframe?
Presentation transcript:

Facilitate differentiation of Purpose Table of content CEN/TC451/WG1: Vertical wells - Part 1: Design Version 18th of July 2018 INTRO Scope Normative reference Terms and definitions Project objectives Site conditions Hydrogeological characterisation Environmental contraints Potential environmental impact Estimation of Yield Pump Selection Dimension of the Well Materials Additional Well Equipment Drilling Development Well Testing Programme Management of Residues Mitigating Measures Evaluation of the design Project design document ANNEX A: Requirements for specific purpose ANNEX B: Field investigation methods Etc. OBJECTIVES SITE Facilitate differentiation of Purpose life-span, quantity, human consumption Site conditions Ambient water, surrounding land use No duplication EU wide applicable Obligatory evaluation of design and information against the objectives Once structure OK, we can use textblocks already agreed on, from the current draft WELL CONSTRUCTION PROCESS EVALUTION AGAINST OBJECTIVES BASED ON OBJECTIVES BASED ON EVALUTION OF INFORMATION & OBJECTIVES