Follow-up on tilt of triplet magnets

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Beam Based Survey and Alignment of Ring Magnets David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
ALIGNMENT OF Q2 LOW BETA QUADRUPOLES D. Missiaen, On behalf of the EN-MEF-SU/MTI team 1.
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
Magnetic Behavior of LHC Correctors: Issues for Machine Operation W. Venturini Delsolaro AT-MTM; Inputs from A. Lombardi, M. Giovannozzi, S. Fartoukh,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
New ALICE Beam Pipe: Injection Protection C. Bracco on Behalf of ABT/BTP Acknowledgment: M. Giovannozzi.
MG - MTE Workshop 24/09/20101 Measurements’ analysis S. Gilardoni, M. Giovannozzi, M. Newman Introduction Techniques, tools Results (selected) Outlook.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LCLS-II Magnet Error Sensitivities. Sensitivities of dipole magnets, from injector output (95 MeV) to SXR undulator input (4 GeV), where each plotted.
Massimo GiovannozziChamonix XV, January Electrical circuits required for the minimum workable LHC during commissioning and first two years.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
PyHEADTAIL-PyECLOUD Simulations for LHC and HL- LHC Aaron Axford 27/05/20151.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
Beam Plans for Accelerator Physics Systems eLTC Summary February Session 5: Beam Plans for Accelerator Physics Systems 1 Main goals for this session:
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Linear optics - I Low beta* at injection –Reduction of injection could potentially reduce time to collisions and allow for a more relaxed ramp&squeeze,
High Luminosity LHC Robustness & tolerances Catia Milardi HL LHC Task 2.2, September 19 th 2012.
Expected field quality in LHC magnets E. Todesco AT-MAS With contributions of S. Fartoukh, M. Giovannozzi, A. Lombardi, F. Schmidt (beam dynamics) N. Catalan-Lasheras,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ALIGNMENT OF THE NEW TRIPLETS
Alignment and beam-based correction
Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams.
Beam Energy & Intensity: One bunch during full cycle
MD Planning Fri – Sat (26. – 27.8.)
Alignment of VSC components along LSS 1&5
Transverse Damping Requirements
1st LHC MD Period Started
Review of the present non-conformities in view of HL-LHC
Multi-Turn Extraction studies and PTC
Field quality update and recent tracking results
LHC Experimental Vacuum Systems Status October ‘07
Status and needs of dynamic aperture calculations
Spectrometer Operation in IP2 & 8
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Field quality to achieve the required lifetime goals (single beam)
UPDATE ON DYNAMIC APERTURE SIMULATIONS
Alice solenoid – orbit distortion
Frank Zimmermann Mike’s 14:00 meeting,
Week 35 – Technical Stop and Restart
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
IR2 aperture measurements: results, actions and proposal
Planning at 5 o’clock meeting Friday
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Global aperture measurements at 450 GeV with 170 mrad crossing angle
Collimation margins and *
IR Upgrade Possibilities for PEP-II
Magnetic axis tolerances for the SSS magnets
Optics Measurements in the PSB
MD Planning Fri – Sat (1. – 2.7.)
Plan for 1 m b* J. Uythoven & J. Wenninger
Triplet corrector layout and strength specifications
Beam dynamics requirements on MQT
LHC beam orbit and collision position determination & control – performance and issues, prospects for Run 3 Orbit in collision - Luminosity WS - J. Wenninger.
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
L. Gentini, M. Giovannozzi, M. Gonzalez, M. Krupa, H. Mainaud Durand,
Presentation transcript:

Follow-up on tilt of triplet magnets M. Giovannozzi, R. Tomás Acknowledgements: A. Herty, H. Mainaud Durand, D. Missiaen 14/09/2010 LHC Beam Commissioning - MG

LHC Beam Commissioning - MG Recap of situation Alignment data (tilt angle) of triplet quadrupoles made available in August (ABP-SU): Large tilt observed in IR5/8 (up to 0.6 mrad). Rogelio made the analysis of the impact: 40% of the coupling observed in IR5 can be explained by the measured tilt. 10% of the coupling observed in IR8 can be explained by the measured tilt. A new measurement campaign took place to confirm the results announced in August. 14/09/2010 LHC Beam Commissioning - MG

LHC Beam Commissioning - MG 14/09/2010 LHC Beam Commissioning - MG

LHC Beam Commissioning - MG 14/09/2010 LHC Beam Commissioning - MG

Summary of tilt measurements IR8 IR1R IR2 IR5 IR1L 14/09/2010 LHC Beam Commissioning - MG

LHC Beam Commissioning - MG Conclusions Large tilt errors confirmed in recent SU measurement campaign. IR5 and IR8 feature the largest tilts. Setting the re-alignment threshold to 0.2 mrad gives the following 7 quadrupoles to re-align: Q3L5, Q2L5, Q3R5 Q2L8, Q1L8, Q1R8, Q2R8 Re-alignment can be performed remotely This might need to re-check IR bumps and other settings (e.g., injection for IR8). 14/09/2010 LHC Beam Commissioning - MG