FIT detector as Luminometer for RUN3

Slides:



Advertisements
Similar presentations
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Advertisements

CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
Trigger study with CASTOR – Forward and Diffractive Meeting, Antwerpen –October 26, 2007 – Silvia Ocheşanu 1 Silvia Ochesanu Thomas Maes, Hans Van Havermaet.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Run 2 Upgrade of the ATLAS Minimum Bias Trigger Scintillators Rachel Hyneman, College of William & Mary Advisor: Antonio Sidoti, Instituto Nazionale di.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
ALICE Trigger and Event Selection QA 1Kevin McDermott By: Kevin McDermott August 9, Michigan REU Student Program – Final Presentations.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
Jornadas LIP 2008 – Pedro Ramalhete. 17 m hadron absorber vertex region 8 MWPCs 4 trigger hodoscopes toroidal magnet dipole magnet hadron absorber targets.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Pions for SoLID May 7 th 2013 SoLID EC meeting A. Camsonne.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
CERN November 22, 20041W.H.Trzaska HIP Jyväskylä T0 answers Meeting with LHCC referees CERN, November 22, 2004.
V0, jyg, ALICE week, March Preparing for the V0 TDR (Lyon-Mexico project)  The V0 detector in 3 chapters  1 - Tests and simulations of detection.
ALICE Fast Interaction Trigger detector for the future
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
Oct 6, 2008Amaresh Datta (UMass) 1 Double-Longitudinal Spin Asymmetry in Non-identified Charged Hadron Production at pp Collision at √s = 62.4 GeV at Amaresh.
FIT (Fast Interaction Trigger) detector development for ALICE experiment at LHC (CREN) Institute for Nuclear Research (INR RAS) National Research Nuclear.
Charmonium Production in 920 GeV Proton-Nucleus Interactions Presented by Wolfgang Gradl for the HERA-B
First measurements in Pb—Pb collisions at  s NN =2.76 TeV with ALICE at the LHC M. Nicassio (University and INFN Bari) for the ALICE Collaboration Rencontres.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
Tomasz Malkiewicz T0 trigger and luminosity monitoring luminosity monitoring ALICE meeting at JYFL.
Jet reconstruction with Deterministic Annealing Davide Perrino Dipartimento di Fisica – INFN di Bari Terzo Convegno Nazionale sulla Fisica di Alice – 13/11/2007.
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
DIS 2011, Newport News, April 2011Joakim Nystrand, University of Bergen 1 Small-x and forward measurements in ALICE Joakim Nystrand University of.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
 13 Readout Electronics A First Look 28-Jan-2004.
Digital Acquisition: State of the Art and future prospects
Time-zero evaluation using TOF, T0 and vertex detectors
The Fast Interaction Trigger detector for the ALICE Upgrade
"North American" Electronics
The Totem trigger architecture The LONEG firmware archtecture
MoNA detector physics How to detect neutrons. Thomas Baumann NSCL.
First data from TOTEM experiment at LHC
Alternative FEE electronics for FIT.
ALICE – First paper.
BNL electronics: first tests
of secondary light ion beams
FIT Front End Electronics & Readout
Summary: Workshop on CMS Beam Conditions, Radiation Monitoring and Luminosity Systems Oliver Stein, May 2013, CERN.
A First Look J. Pilcher 12-Mar-2004
The Silicon Track Trigger (STT) at DØ
FPGA-based Time to Digital Converter and Data Acquisition system for High Energy Tagger of KLOE-2 experiment L. Iafolla1,4, A. Balla1, M. Beretta1, P.
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
The digital read-out for the CSC system of the TOTEM experiment at LHC
Example of DAQ Trigger issues for the SoLID experiment
Quarkonium production in ALICE
Trigger  Detectors at 420m can be included in the HLT
Commissioning of the ALICE-PHOS trigger
The digital read-out for the CSC system of the TOTEM experiment at LHC
11th Pisa meeting on advanced detectors
The LHCb Front-end Electronics System Status and Future Development
The Trigger Control System of the CMS Level-1 Trigger
Electron PID & trigger using EMCal
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Overview of ALICE luminosity-determination methodology in Run 2
Beam instrumentation and background monitoring
Presentation transcript:

FIT detector as Luminometer for RUN3 Tatiana Karavicheva Institute for Nuclear Research RAS, Moscow ALICE-LHC Interface for RUN3 meeting 28/06/2019

ALICE luminometers in RUN2 • V0 (pp, p-Pb, Pb-Pb) - two scintillator arrays on opposite side (A and C) of the IP - coincidence of A and C side for pp and p-Pb collisions - amplitude trigger for Pb-Pb collisions • T0 (pp, p-Pb) - two Cherenkov detector arrays on opposite sides of the IP - coincidence of A and C side with hardware cut on the signal arrival time difference Neutron Zero Degree Calorimeters ZN (p-Pb, Pb-Pb) - two spaghetti calorimeters on opposite sides of the IP, at ±114 m - single-arm (remnant side for p-Pb) or OR-trigger • ALICE Diffractive detector AD (pp) - two scintillators on opposite sides of the IP, The stability and consistency of two main luminometers is evaluated via the ratio of T0- to V0-based luminosities ALICE luminometers in RUN2 ALICE-LHC Interface for RUN3 meeting 28/06/2019 T.Karavicheva

What have we learned from RUN2? interaction time with T0 & V0 0TVX trigger – clean, no after-pulses, not sensitive to collisions with gas but was affected by pile-up of two events hitting T0A and T0C separately due to the limited T0 acceptance 0TVX – the main luminometer for 2012-2018 pp data taking ALICE-LHC Interface for RUN3 meeting 28/06/2019 T.Karavicheva

Fast Interaction Trigger for RUN 3 replaces 3 detectors in ALICE: T0,V0 and FMD FIT =FT0 and FV0 for ALICE after LS2 ALICE-LHC Interface for RUN3 meeting 28/06/2019 T.Karavicheva

FIT detector FV0 FT0 Large acceptance Excellent timing Increase the active area for FV0 and FT0 Increase the number of channels Old V0A (2.8 < η < 5.1) Old T0A -3.28 < η < -2.97 Old T0A (4.61 < η < 4.92) T.Karavicheva ALICE-LHC Interface for RUN3 meeting 28/06/2019

News from MB 18/04/2019 FIT/V0/FDD integrated into one FIT project ( to use the same type of electronics). W.H.Trzaska

Architecture of FIT electronics Fully integrated system based on an amplifier, a CFD, on-board TDC/ADCs and FPGA processors; digital trigger processing and GBT based read-out. FIT -> trigger decision based on digitized data (after TDCs & ADCs) Relevant to FDD: No problem foreseen in the procession of timing information, but ADC integration is terminated after 20 ns (but it could resume after 5 ns). ALICE-LHC Interface for RUN3 meeting 28/06/2019 T.Karavicheva

FIT electronics architecture FIT electronics structure (FT0) TCM cards for FV0 and FDD will be the same as for FT0,but custom FPGA firmware is needed for each detectors (trigger decisions ) Limitation: -5 triggers at the same time per detector - trigger outputs only for Beаm-Beam window for FT0

FIT trigger requirements from Physics Coordination (13 Dec 2016)(1) TRIGGER WITH CHARGE-AMPLITUDE RANGE: FT0 and FV0A should have a trigger with programmable lower and upper charge-amplitude limits (as we have now in V0).->being commissioned as luminometer TRIGGER ON FIRED CELLS IN GIVEN TIME WINDOW: It should also be possible to have, at trigger levels L0 and LM, the information of how many CELLS (both for FV0A and FT0) saw a hit, in a given BC, in the time windows corresponding to beam-beam (BB-flag) and beam-gas (BG flags) interactions. The current V0 allows one to use a trigger signal of the type (n < BB < N && m < BG < M), where n, N, m, M are integer numbers and can be set via DCS. Limitation : -With new electronics not possible to have BG time windows for FT0 triggers; - BG time windows FV0 and FDD are under discussion -Not possible to change BB windows (+-2,5 nc) ALICE-LHC Interface for RUN3 meeting 28/06/2019 T.Karavicheva

FIT trigger requirements (2) MASKING CELLS FROM THE TRIGGER: It should be possible to mask out one or more channels from the trigger logic. • TRIGGER WITH CHARGE-AMPLITUDE RANGE FROM INDIVIDUAL FV0A RINGS: It would be very useful if the FV0A+ had the possibility to trigger using the signal (or absence of signal) from individual rings; this would open new possibilities, like triggering pp events with high multiplicity in different eta intervals (using the 5 rings). • OTHER USEFUL IMPROVEMENTS: As possible further improvement it would be worth to look into the possibility of storing, in case of multiple hits, the times of all hits for a given cell (for FV0A and FT0). In the present V0, only the leading time is stored. Another interesting possibility would be to decrease the integration time to below 25 ns, again in order to catch multiple hits (as of now, in case of pile-up the measured charge is given by the sum of all hits). All of this is of course subject to what will be the actual detector time resolution. ALICE-LHC Interface for RUN3 meeting 28/06/2019 T.Karavicheva

FT0 & T0 efficiency as a function of number of contributors in ITS vertex Pythia8, 14TeV; FIT, ITS Run 289830, LHC18l, 13TeV 25ns_2556b_2544_2215_2332_144bpi_20injV3 Rate 138Hz FT0AC||FT0A||FT0C = 91.8% FT0AC 77.1% FT0A 10% FT0C 4.7% T0AC||T0A||T0C = 86% (after Physics selection) T0AC 49% T0A 17 % T0C 20% The T0 vertex trigger (0TVX) rate was affected by pile-up of two events hitting T0A and T0C separately due to the limited T0 acceptance

FIT luminometer in RUN3 •FV0A (pp, p-Pb, Pb-Pb) One scintillator array on side A of the IP (sensitive to the beam-gas) ? Amplitude trigger Amplitude ring triggers • FT0 (pp, p-Pb) - two Cherenkov detector arrays on opposite sides of the IP - coincidence of A and C side with hardware cut on the signal arrival time difference (like OTVX ) - amplitude triggers • ALICE Diffractive detector FDD (pp) - two scintillators on opposite sides of the IP, coincidence of A and C side FT0& FV0A (pp,p-Pb,Pb-Pb) Logical conditions (OR / AND) between detectors can be done by CTP ALICE-LHC Interface for RUN3 meeting 28/06/2019 T.Karavicheva

Conclusions FIT will be ready to deliver the following triggers at LM level as luminometer: Online Vertex determination (like OTVX) charge amplitude in range (FV0 and/or FT0) charge amplitude from individual FV0 rings (new, to be discussed in detail). Only 5 triggers at the same time per detector FDD triggers to be discussed later ALICE-LHC Interface for RUN3 meeting 28/06/2019 T.Karavicheva

Thank you for your attention!