Three Bridges Estates HOA Meeting

Slides:



Advertisements
Similar presentations
Medford Aquatic Center Plan for Energy Efficiency and Solar resources.
Advertisements

IAPD – The Maryland Experience. Involve FNS from the start – Guidance – Knowledge – Updates Communicate Often Approvals.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Crop as Damaged by Pond previously Crop as Damaged by Pond previously.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
UN Capital Master Plan Renovation Strategy IV Version 9 August 2006 schedule (condensed)
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Marie Zubatá 3. A.  Centrifugal pumps are a type pumps used to convey liquids or gases by the means of a rotating impeller, which increases the pressure.
Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher.
“Better Employment Competencies through Individualized e-training” – JobAssist Project Ref. No: PL1-LEO QUALITY MANAGEMENT PLAN.
HFVOA Sidewalk Project Status Update July Scope of the Project  Sidewalks cracking and lifting due to trees roots  Cornell Rd, North Side between.
Water Source.  SC has no requirements to be an irrigation contractor  Other states do NC to be certified NC to be certified.
Every Drop Counts: Conserve WATER. Townes at Old Stone Crossing Water Leak DID WE Find Source? YES.
Force. Performance. Passion. © 2014 Holcim (Canada) Inc. Flamboro Wells Project CAP Update June 23, Strength.
Eco-Winter Installation. – Step 1 – Mount Eco-bypass to water heater.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 July 13, 2011 Some morning photos Tank Valve Box.
Franklin Trace HOA Meeting June 5 th, FTHOA Board of Directors Carlton Bale Rebecca Coats Barry Griffin Sharon Neal Ryan Roberson Terri Roberson.
Final Exam Info Warrior Wednesday Schedule Monday 12/15 – Regular Day Tuesday 12/16– Exam Schedule 1 st Period8:30 – 9:15 2 nd Period9:20 – 10:05.
North Bridge Homeowners Association Meeting Thursday, November 6, 2014.
2016 Saw Grass Subdivision HOA General Meeting January 11 th, 2016.
SeaPerch Electrical System. Electrical System Overview Assemble the control box. Make the Cat5 connector. Wire the motors to the tether. Wire the control.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
Eastham Water System Board of Selectmen Meeting April 25, 2016.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Common Area Committee Trailmark HOA
Village of east aurora sycamore street water improvements
SeaPerch Electrical System
by Fritz Szoncsó CERN HSE
Bend lawn care is more important than Redmond lawn care
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
Industry Governance Group 20th August 2009
In order to design a sprinkler or drip irrigation system for the lawn, we must first know how much flow is available in gallons per minute from the water.
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Navigating the Resident Quarterly Development Plan
CATCH ME AT MY BEST WHO MADE YOUR DAY SPECIAL?
Performance Process STEP PROCESS GUIDELINE DATES ACTION
Pine cove pit time lapse drone photos
SPDG GPRA/Program Measure Review
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
CATCH ME AT MY BEST WHO MADE YOUR DAY SPECIAL?
Let’s say we have a town of 10,000 people electing a mayor using the Plurality with Elimination Voting Method. There are 4 candidates, candidate A, candidate.
HHS Freshman Academy Update
Planning and Development Services Department
Grade one First term Second term Learning unit Learning unit
Compliance monitoring
Performance Evaluation 2015 Performance Evaluation Cycle
Shell Sort and Merge Sort
RIS3 of North-West Development Region (RO)
Please sign in & make yourself comfortable
Kenilworth – Amberleigh Homeowners Special Assessment Meeting
Schedule after Shutdown
Subdivision Applications
Grant County Departmental Space Needs Assessment
Harbour Island Force Main Replacement
CATCH ME AT MY BEST WHO MADE YOUR DAY SPECIAL?
CATCH ME AT MY BEST WHO MADE YOUR DAY SPECIAL?
Graphic Design Semester 1 Final Exam
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
Trillo Apparel Company Revised Delivery Plan
2020 DWRF Project Plan Kalamazoo, Cooper and Parchment
Please sign in & make yourself comfortable
Annual Meeting | February 19th 2019
SeaPerch Electrical System
Personal Finance Test is Friday
Deadlines for Innovation Projects 2017 Business Planning
Presentation transcript:

Three Bridges Estates HOA Meeting 07 Apr 2013

4.Well: 4-7-13 Proposed Landscape timelines Previous Proposed timelines Electricity should be up and ready by Apr 12th Drilling targeted between Apr 12th and 26th Final Plumbing and final Electricity targeted until Apr 30th > Water available Irrigation: Quote and Decision targeted until May 10th Irrigation: Installation/Repair targeted until end of May Assessment Due August 1st Adjusted time lines Electrical Service Meter- installed July 10th Coordination issue resolved Electrical well motor control not working July 18th New motor control box ordered July 19th New motor control and rework of electrical wiring to be done July 22nd and July 23rd Well has been drilled – as of July 10th Well motor not working. (see motor issues above) July 18th evaluation from American Irrigation reports new submersible pump would need to be installed on South side of pond. Submersible 3 HP pump, wiring, and plumbing could go as high as $12,000 worst case. Direction is to attached irrigation directly to well pump with switch to fill pond. July 18th Old irrigation system would have to be researched/reworked, and remains very much an unknown condition, as well as design. Costs are undetermined as this point for irrigation. Landscape: To be scheduled after ALL HOA and Special Assessment dues are collected.