AASHTOWare RADBUG Meeting July 30-31, 2019 South Lake Tahoe, CA

Slides:



Advertisements
Similar presentations
3D Analysis with AASHTOWare Bridge Design and Rating
Advertisements

MACREX Indexing Software. Getting Started: Basic Basics.
Bridge Engineering (6) Superstructure – Concrete Bridges
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Design and Rating for Curved Steel I- and box-girder Bridge Structures
HOW WELL DO YOU KNOW THE BASICS OF USING YOUR COMPUTER?
Virtis/Opis Technical Update Virtis Opis Bridgeware User Group 2011 Conference Helena, Montana 1.
© 2009 Bentley Systems, Incorporated Steve Willoughby, Bentley Systems Bridge Product Specialist LEAP Bridge: Product Update and Direction.
Todd Thompson, PE – SD DOT AASHTOWare Bridge Task Force, Chair Presented to the RADBUG Traverse City, MI August 12, 2014.
11 INSTALLING WINDOWS XP Chapter 2. Chapter 2: Installing Windows XP2 INSTALLING WINDOWS XP  Prepare a computer for the installation of Microsoft Windows.
Chapter 14 Chapter 14: Server Monitoring and Optimization.
MCDST : Supporting Users and Troubleshooting a Microsoft Windows XP Operating System Chapter 10: Collect and Analyze Performance Data.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 12: Managing and Implementing Backups and Disaster Recovery.
XP New Perspectives on Microsoft Office Excel 2003, Second Edition- Tutorial 11 1 Microsoft Office Excel 2003 Tutorial 11 – Importing Data Into Excel.
Hands-On Microsoft Windows Server 2003 Chapter 2 Installing Windows Server 2003, Standard Edition.
Tutorial 11: Connecting to External Data
®® Microsoft Windows 7 for Power Users Tutorial 10 Backing Up and Restoring Files.
Manitoba Infrastructure and Transportation RADBUG - August 2014 Water Management and Structures.
® IBM Software Group © 2006 IBM Corporation The Eclipse Data Perspective and Database Explorer This section describes how to use the Eclipse Data Perspective,
Pasewark & Pasewark 1 Access Lesson 6 Integrating Access Microsoft Office 2007: Introductory.
Buying a Laptop. 3 Main Components The 3 main components to consider when buying a laptop or computer are Processor – The Bigger the Ghz the faster the.
Basic Concepts of Computer Networks
1 Introducing Windows Backup There are different methods for starting Windows 2000 Backup. Requirements for running Windows 2000 Backup All users can back.
2013 Design Rating User Group Presentation Virginia Beach, Virginia August 8, 2013.
Introduction to HP LoadRunner Getting Familiar with LoadRunner >>>>>>>>>>>>>>>>>>>>>>
Hands-On Microsoft Windows Server 2008
Project 3 File, Document, Folder Management, Windows XP Explorer Windows XP Service Pack 2 Edition Comprehensive Concepts and Techniques.
Tutorial 11 Installing, Updating, and Configuring Software
University of Maryland Compiler-Assisted Binary Parsing Tugrul Ince PD Week – 27 March 2012.
AASHTOWare Bridge Rating – Curved Girder Module
Chapter 2 – Software Part A. Definition Computer is made up of two components Hardware Physical components Software Instructions for the computer Two.
1 Differences Between BRASS and AASHTO Standard Spec Engines Virtis Opis BRIDGEWare Users Group Meeting 2011 Helena, Montana.
1 AASHTOWare Bridge Technical Update AASHTOWare Bridge Rating/Design User Group Training Meeting Traverse City – August 2014.
BRIDGE DESIGN & RATING REPORTS TECHNICAL ADVISORY GROUP (RTAG) Amjad Waheed, PE 2014 RADBUG Presentation Traverse City, Michigan August 13, 2014.
Design and Rating for Curved Steel I- and box-girder Bridge Structures
A Load Rating of a 3 Span Continuous Deck-to- Through Truss Bridge in Br|R AASHTOWare BrDR 2013 User Group Meeting A Load Rating of a 3 Span Continuous.
1 Virtis/Opis Technical Update Virtis Opis BRIDGEWare Users Group Meeting 2010 Nashville, Tennessee.
Vista and halFILE. Vista Minimum Specs An 800 MHz processor 512 MB of RAM A 20 GB hard drive with 15 GB of free space.
Dr Ana M. Ruiz-Teran Transverse schemes for bridge decks. Part 3: Box girders.
How are they called?.
Optimizing Windows Vista Performance Lesson 10. Skills Matrix Technology SkillObjective DomainObjective # Introducing ReadyBoostTroubleshoot performance.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
DIT314 ~ Client Operating System & Administration
Introduction to InVEST ArcGIS Tool
Welcome to Indiana University Clusters
UNDERSTANDING YOUR COMPUTER
HOW WELL DO YOU KNOW THE BASICS OF USING YOUR COMPUTER?
Control Unit Lecture 6.
Advanced QlikView Performance Tuning Techniques
Blatnik Bridge Management Study
How To Install Panda Antivirus For Mac?
Bridge modelling with CSI software.
INSTRUCTIONS TO COMPLETE 2017 POOL RE MEMBER DATA RETURN
Computer Basics Section 2.1 YOU WILL LEARN TO… Identify hardware
Quicken Support Help Instant Fix Quicken Installation Problems.
Nastran 101 February 28, 2008.
Velotron User Guide.
OPS235: Week 1 Installing Linux ( Lab1: Investigations 1-4)
Grillage Method of Superstructure Analysis
Access Tutorial 8 Sharing, Integrating, and Analyzing Data
Tutorial 2 SSMA Cee in Compression: 600S Fy = 50ksi Objective
OPS235: Week 1 Installing Linux ( Lab1: Investigations 1-4)
Tutorial 2 SSMA Cee in Compression: 600S Fy = 50ksi Objective
Gurpreet Singh CSE/IT.
LO3 – Understand Business IT Systems
Tutorial 8 Sharing, Integrating, and Analyzing Data
Using Veera with R and Shiny to Build Complex Visualizations
Excel Tips & Tricks July 18, 2019.
AASHTOWare Bridge Design & Rating (BrDR) 3D FEM Analysis Capabilities
Batch Analysis of BrR Models
Presentation transcript:

AASHTOWare RADBUG Meeting July 30-31, 2019 South Lake Tahoe, CA AASHTOWare Bridge Design & Rating (BrDR) 3D FEM Analysis Troubleshooting AASHTOWare RADBUG Meeting July 30-31, 2019 South Lake Tahoe, CA

BrDR 3D FEM Analysis Troubleshooting Hardware recommendations Factors that influence analysis speed Tips for successful analysis Troubleshooting Non-zero moments at end supports Different number of nodes per girder

Hardware Recommendations Machine: Intel Core i7 processor or equivalent Memory: 32 GB or more Hard Disk: Solid State Drive

Factors that Influence 3D Analysis Speed Number of degrees of freedom Number of live load vehicles Live loading increments Analysis output selections

Number of Degrees of Freedom Number of shell elements in the deck between girders or in the web between flanges Target aspect ratio for shell elements Found on Superstructure Definition: Analysis tab

Live Loading Increments Vehicle increment for longitudinal loading Vehicle increment in lane and lane increment for transverse loading Found on Superstructure Definition: Analysis tab

Analysis Output Selections Choose a local folder as the Analysis Output Folder. Writing analysis output to a network folder will degrade the performance of the analysis.

Analysis Output Selections Select only the necessary analysis output for the analysis. Disk operations are expensive from the analysis performance perspective.

Tips for Successful Analysis Fine tune the model while running the DL only

Tips for Successful Analysis Review the DL model with Model Viewer

Tips for Successful Analysis Check the moments to see if they look ‘normal’ Run coarser meshes initially and only then fine tune the model

Tips for Successful Analysis Do initial live load analysis for a single vehicle only Do first spec check of 1 girder only Launch 3D analysis from the member alternative Only “Existing” alternatives have influence surfaces loaded and are spec checked

Tips for Successful Analysis Do not select diaphragms for spec checking until satisfied with girders

Troubleshoot Non-Zero Moments at End Supports Evaluate “Pinned” support conditions

Troubleshoot Different Number of Nodes

Troubleshoot Different Number of Nodes “3DGirderNodes.txt” Comma delimited file contains node locations and reason why node was generated Developed for debugging, now shared with users 6.8.3: File generated when unable to generate mesh 6.8.4/7.0.0: File always generated

Troubleshoot Different Number of Nodes Reasons why node was generated Diaphragm, support, tenth point, cross section change point “bitmask 0” : node was added to either get the same number of nodes in a span or added based on the number of shell elements selected on the Structure Definition: Analysis tab

Troubleshoot Different Number of Nodes

Troubleshoot Different Number of Nodes

Troubleshoot Different Number of Nodes Step 1: Use Paste/Use Text Import Wizard to copy each girder’s data into its own column in Excel

Troubleshoot Different Number of Nodes Step 2: Examine total number of nodes per girder looking for differences

Troubleshoot Different Number of Nodes Step 3: For girders with difference, examine number of nodes per spans

Troubleshoot Different Number of Nodes Diaphragm at 70.536605’ (support 2) + 259.018115’ = 329.55472’ Pier 4 is at 329.650012’

Troubleshoot Different Number of Nodes Change the number of diaphragm spacing from 15 to 14 Add a new row at 0’ from Support 5(Pier 4) with 0’ spacing Move Span 5 data down a row

Troubleshoot Different Number of Nodes

Thank You