7th Innovation Award Judging Criteria.

Slides:



Advertisements
Similar presentations
The Latest Developments in Ukraines Intellectual Property Laws and Data Protection.
Advertisements

EMS Checklist (ISO model)
Entrepreneurship Contest 2011 Sponsored by. SpaandanB is a NRB-run non-profit organization based in USA that implements and supports projects primarily.
Research and Innovation Research and Innovation Brussels, 12 November 2013 Types of Action Focus on Innovation Actions and the SME Instrument.
Internal Control–Integrated Framework
Government Rules of Sourcing An overview for suppliers June 2013.
Mount up with wings of Eagles Adoption and Commercialization of Technology Innovations Dr. Steve Jarrett Dolphin & Eagle Consulting, Inc. Charleston, SC.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Patent or Perish? Presented By: John F. Letchford Archer & Greiner, P.C. October 19, 2006.
Principal Patent Analyst
Horizon 2020 Energy Efficiency Information Day 12 December 2014 Essentials on how to submit a good proposal EASME Project Advisors: Francesca Harris,
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
LEADER -The acronym ‘LEADER' derives from the French words "Liaison Entre Actions de Développement de l'Économique Rurale“ which means, ‘Links between.
Enterprise Development Fund Carolyn Howe Centre for Enterprise & Innovation.
Sustainability. Sustainability Defined Sustainability commonly refers to the characteristic of a process or state which can be maintained at a certain.
National Science Foundation: Transforming Undergraduate Education in Science, Technology, Engineering, and Mathematics (TUES)
MIIE activities are supported by a grant from the C.S. Mott Foundation. 1 Michigan Initiative for Innovation and Entrepreneurship (MIIE) Pilot Program.
Australia’s Innovation Action Plan – Self-Assessment Report June 2010 Barry Jones Industry and Small Business Policy Division.
Business Concept Summary Assignment Details Prepare a one-page Power Point slide of your idea that could be the basis of a business plan. Use bullet points.
National Institute of Standards and Technology U.S. Department of Commerce TheTechnology Innovation Program (TIP) Standard Presentation of TIP Marc G.
Product/Service Name: Team Leader: Faculty / Research Alliance: Mobile Tel:
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Designing and implementing of the NQF Tempus Project N° TEMPUS-2008-SE-SMHES ( )
Funding and support in FP6 for SMEs Kalev Kaarna ESTIRC.
Reporting Entity & Consolidation Principles IFRS 10 & 11 ACCA F7 2015Mark Fielding-Pritchard1.
Transmitted by the representative of JAPAN Toward Realization of the “Mutual Recognition of International Whole Vehicle Type Approval (IWVTA)” under the.
Strategic Entrepreneurship
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Managing Research and Development. Overview Two Processes in Corporate Innovation Corporate Research –Why, what, history Functions of Corporate Research.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
Bidders Conference PI-SNAP-Ukraine-01 Kyiv, Ukraine _________________________________ February 12, 2015 Matthew Krause Partnership Development Lead Feed.
NSERC Research Partnerships: An Overview University of Calgary November 16, 2015.
IDEA SUBMISSION India Innovation Lab for Green Finance.
Small Business Innovation Research Program (SBIR) Presented by Sharina Broughton.
1 SBIR/STTR Overview Wang Yongqiang. 2 Federal SBIR/STTR Program ‣ A +$2Billion funding program set-aside for small businesses seeking to early stage.
Certification and Adoption Workgroup HIT Policy Committee April 28, 2014 Discussion on Incremental Rulemakings.
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Advanced European.
Outline Voucher for Industry Association (VIA) Overview Cybersecurity VIA Program Details o Program Objectives o Project Eligibility o Funding Contributions.
Rules overview (1 hour presentation) User instructions This ppt deck is designed to provide a basic presentation for internal use in your organisation.
Cultivating Innovative SMEs into Business Giant: the SME Supporting Program in Shanghai Shanghai Torch Hi-tech Industry Development Center July 2008.
KTP Assessment Criteria May Assessment system changes New system in place for May 2016 KTP close Aligns with other Innovate UK assessment systems.
The Ninth POMS-HK International Conference
Update from the Faster Payments Task Force
<Partner Name> MMM DD, 2017
SUPPORTS and SERVICES Recep BİÇER President
FDA’s IDE Decisions and Communications
OICA input on software updates to UN TF CS/OTA
Technology Transfer 101 An Overview of the Process
Sustainable Development reporting: 8-11 October 2013, Athens Greece
Week 6 Innovation Process
The Ninth POMS-HK International Conference
European Innovation Council Pilot (EIC)
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
MACIEJ SZYMANSKI Policy Officer
ORA’18 – Business Plan Contest
Registration No. Contact Details of Applicant Startup Pitch Deck
26th Meeting of the Wiesbaden Group on Business Registers
“Deep Dive” (your company name)
EMS Checklist (ISO model)
Strategic Environmental Assessment (SEA)
QoLT project review plan
[INSERT TITLE THAT WILL REPRESENT PROJECT OR INITIATIVE]
The name of your project Month and Year
ISO
Code: Presentation Topic (Calibri 36 pt.)
Open Innovation Letter
Conclusions from the Review of REACH
Code: Presentation Topic (Calibri 36 pt.)
Code: Presentation Topic (Calibri 36 pt.)
Draft UN Regulation on Cyber Security
Presentation transcript:

7th Innovation Award Judging Criteria

IA Judging Criteria for Idea/Plan Weight Rating Scale for IDEA/PLAN Projects 1 2 3 4 5 1. Originality 45% COMMERCIALIZED R&D Idea to extend from tools, process and services being used in PTTEP Idea to apply tools, process and services available in market into PTTEP business Idea to modify commercialized tools, process and services from E&P industry for PTTEP business Idea to modify/ develop new tools, process and services already in R&D stage available in market for PTTEP business Idea to create new R&D tools, process and services not existing in industries 2. Practicality 25% Addresses a need or problem but not relevant to PTTEP’s business. Addresses a need or problem but it’s not tested yet. Addresses a need or problem and provides a possible solution. The innovation has been tested and shown to be somewhat effective. Addresses a need or problem and provides a solid solution. The innovation has been tested but not prototyped yet (Lab Scale). Addresses a need or problem and provides a solid solution that could make a significant impact. The innovation has been prototyped or tested and shown effective. 5% Not in line with current rules, regulations and SSHE. Require amendment/ deviation from existing rules, regulations and SSHE (both PTTEP and external regulatory body) Can be applied to existing rules, regulations and SSHE but require approval from external regulatory body Can be applied to existing rules, regulations and SSHE but require to inform external regulatory body Can be easily applied to existing rules, regulations and SSHE (internal & external) 3. PTTEP Potential Benefit 10% (Benefit/ Cost Ratio) Benefit > cost = 2 times Benefit > cost = 4 times Benefit > cost = 6 times Benefit > cost = 8 times Benefit > cost = 10 times , Proved Sustain 10% Applied within own department/ division Applied across PTTEP Applied within PTT Group or PTTEP’s Joint Venture Limitedly applied outside PTT Group Applied worldwide 4. IP Disclosure Endorsement Petty patent applied Petty patent granted Patent applied Patent granted FINANCIAL (project life cycle should not exceed 5 years.) 45% NON-FINANCIAL (Opportunity for implementation) 30% การเอาของเดิมที่มีอยู่มาใช้ไม่นับเป็น adaption Adopt จากสิ่งที่มีอยู่ในสผ. VS adopt จากสิ่งที่มีอยู่ใน E&P สอดคล้องกับกฎระเบียบบริษัท และcomply กับ SSHE Rules Practical ทางด้านเทคนิค ใช้ได้ในธุรกิจและช่วยพัฒนาด้าน capability ไหม 20% 5%

IA Judging Criteria for Development Weight Rating Scale for DEVELOPMENT Projects 1 2 3 4 5 1. Originality 35% COMMERCIALIZED R&D Extend from tools, process and services being used in PTTEP Apply tools, process and services available in market into PTTEP business Modify commercialized tools, process and services from E&P industry for PTTEP business Extend/ develop new tools, process and services already in R&D stage available in market for PTTEP business Create new R&D tools, process and services not existing in industries 2. Practicality 20% Pilot has been implemented but still requires mitigation / improvement. Pilot has been successfully completed. The deployment has been approved in business plan. Potential to commercialized. The plan to Commercialize is under development. Plan to Commercialize has been approved. 5% Not in line with current rules, regulations and SSHE. Require amendment/ deviation from existing rules, regulations and SSHE (both PTTEP and external regulatory body) Can be applied to existing rules, regulations and SSHE but require approval from external regulatory body Can be applied to existing rules, regulations and SSHE but require to inform external regulatory body Can be easily applied to existing rules, regulations and SSHE (internal & external) 3. PTTEP Potential Benefit 15% (Benefit/ Cost Ratio) Benefit > cost = 2 times Benefit > cost = 4 times Benefit > cost = 6 times Benefit > cost = 8 times Benefit > cost = 10 times , Proved Sustain 15% Cost Saving or Income <0.5 million USD/yr 0.5-3.5 million USD/yr >3.5-6.5 million USD/yr >6.5-9.5 million USD/yr >9.5 million USD/yr 30% Applied within own department/ division Applied across PTTEP Applied within PTT Group or PTTEP’s Joint Venture Limitedly applied outside PTT Group Applied worldwide 4. IP Disclosure Endorsement Petty patent applied Petty patent granted Patent applied Patent granted 5. Publication Abstract submitted Accepted in internal publication (within PTT Group) Accepted/ published in external conference Published in Journal (low impact factor: ≤1) Published in Journal (high impact factor: >1) FINANCIAL (project life cycle should not exceed 5 years.) * For projects with high benefit value 35% NON-FINANCIAL *For projects with low benefit value 25% การเอาของเดิมที่มีอยู่มาใช้ไม่นับเป็น adaption Adopt จากสิ่งที่มีอยู่ในสผ. VS adopt จากสิ่งที่มีอยู่ใน E&P สอดคล้องกับกฎระเบียบบริษัท และcomply กับ SSHE Rules Practical ทางด้านเทคนิค ใช้ได้ในธุรกิจและช่วยพัฒนาด้าน capability ไหม 30% 5% 5%

Judging Criteria Description Originality It has to be a new concept or a variation from existing tool or process which is unique for E&P industry. It can be developed independently or in cooperation or with others. Practicality Readiness to integrate to proposed innovative idea into existing system with concern on cost-effectiveness if implemented shall be considered. Risk/uncertainty from its implementation to ongoing operations will also taker into consideration. PTTEP Potential Benefit It shall make a fundamental change in processes or major adjustment with impact on either multiple operational areas or just on specific area. Ultimately, it will lead to change the new way of working The benefits form the implementation of the proposed innovative idea should be measurable to reflect cost saving or revenue increases and opportunity for implementation in PTTEP or worldwide. IP Rights Chance for IP registration is important. High favor would go to and innovation already registered for IP Publication Internal and/or external conferences/ journals where your paper has been submitted/Published.