Omāroro Residents Design Consult Feedback

Slides:



Advertisements
Similar presentations
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Advertisements

How are we doing?. Performance update We set ourselves some ambitious targets to achieve in 2009/10. Some of these targets include those for: –Repairs.
U.S. 33 Northern Connector Alternative
US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
Student report cards Presentation for Parents of Secondary School Students 2007.
© 2006 STEP Consortium 1 st STEP Conference Fluids Session.
Performance Management Reporting: Quarter 4 Guide to Q4’s reporting Overall performance for Q4 Key Service Priorities Other performance indicators Next.
Mrs Hargreave visited the school and helped us to create a mural showing the history of Westruther.
Implementing an Automated ACCUPLACER Score Upload System for the i3 Platform A Cooperative Effort by Testing Staff, Other Student Services Areas, and IT.
More Seats for More Students Suggested Boundary Options for New Elementary School at Williamsburg February 2013.
Kingsclear Consolidated School Parent / Community Meeting November 29, 2010.
Heathhall School Parent Council
1 Automotive industry Reducing Noise Emissions from Motor Vehicles: New EU Commission legislative proposal World Forum on Vehicle Regulations (WP.29) 156.
Township of Adjala-Tosorontio Recreation Master Plan (March 2006) P LAYGROUNDS Playgrounds offer space for local residents (usually children) to exercise.
Collaton St Mary Masterplan: Additional Consultation on Access Arrange ments Introduction This consultation is about options for access into the Collaton.
1 NIR Training BOF APNIC 18, Nadi, Fiji 1 st Sept, 2004 (Wed) Venue: Orchid room Time: 18:00 – 19:00.
Common Origination and Disbursement (COD) Open Forum Session 19.
Update for Businesses Thursday 28 January 2016 Eloise Appleby Assistant Director (Economy & Communities) Winnall Planning Framework.
March 8, 2016 Presentation of Item CCW – Solid Waste Management Infrastructure Projects – Final Siting Report.
SMITH SCOTT MULLAN ASSOCIATES 1 KING’S PARK PRIMARY SCHOOL FEASIBILITY STUDY STAKEHOLDER ENGAGEMENT 03 February 2016.
Ryan Dunn Memorial Park Alliance Road Safety & Traffic Management Pukeahu National War Memorial Park & Arras Tunnel Roads & Transport.
Downtown Feasibility Study Catalyst Roundtable Summary Themes Town Board Work Session March 22, 2016.
Poverty and education: what is the impact of poverty on children’s education? Poverty and ethnicity.
Digital Marketing Services in India Simplify The Process Of Getting Noticed Online.
Wily .com.
Town Road Improvement Project Communication Plan
Blue Ocean Planning Final Report March, 2017.
Director| Program & Technical Services
Parental Involvement Policy
MERcury Intense Experiment Experiment Layout
FCYO LEARNING AND EXCHANGE FUND
Waunakee Public Library
Communications updates for branch officials training event
Newton Playground Committee
Cement Tanker Blower Noise Reduction
Aim of Economic Development
Low Level Road Project – Traffic Management Meeting August 2012
Interior Design Designing Functional Interiors & Floor Plans
Civic Center Sports Field Study Session & Quarterly Update
PROJECT PLANNING MEETING
TRARALGON - MEMBER CONSULTATION FORUM
2018 Census content development Disability
Parent and Family Engagement Policy
Supplementary Services Project Management Services.
Loyola’s Performance Management Process For Employees
Accelerating Cervical Cancer Elimination
For eating her dinner using a fork independently. Well done Mia!
Release 3 Plan Options Analysis
UKL Future Release 3 XRN4534 – Amendment to RGMA validation rules for asset install date Deployment Options – 9th January 2019 Update.
YEAR Curriculum.
Healthwatch Monitoring MARCH 2016
HHS // IHS HEALTH INFORMATIONTECHNOLOGY MODERNIZATION PROJECT.
“ENHANCING OUR SCHOOL ENVIRONMENT” COMMUNITY SURVEY – AUGUST 2018
3D Design Consultation Service Delivery- How to Interact with CC3D
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
WHY A NEIGHBOURHOOD PLAN?
Manilla Low Level Crossing Project
Advice & guidance.
IFTA FULL TRACK PRELIMINARY BALLOT PROPOSAL
Powercor & Industry Forum Audit Results & Trends
Street Manager Communications approach
Omāroro Reservoir LEMP Overview
Christine Gardner, Allan Jones, David Chapman, Helen Jefferis
Dallas Area Rapid Transit (DART) Cotton Belt Regional Rail Project
Periodic Accounting Review Periodic Revenue Reconciliation
Periodic Workflow Review
Achievement Award Joseph
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

Omāroro Residents Design Consult Feedback

Preliminary Design Consult Preliminary design consult session 14th March Presented on walking tracks, approach from Rolleston to services tunnel and services tunnel entrance Feedback form provided requesting preferences on options for services tunnel wall treatment(s) and general feedback 19 individual responses received, either on the night or via email in the weeks following

Feedback Summary Wall treatments Access road surface Strong preference for planting option (9/19 as first, 1/19 as second) Good support for mural option (7/19 as second preference) Good support for climbing wall (7/19 as first or second preference) However a number of specific comments against the climbing wall also Renders produced in conjunction with WCC show planting option as viewed from top of Rolleston St with/without a pattern treatment on the wall Access road surface Evenly split between grasscrete surface and solid concrete WCC has requested we proceed with a permeable surface

Specific Feedback Response Playground – WCC advise a playground does not align with the Wellington Play Space Policy 2017 School consultation – The CRG is intended to be the only forum for further consultation on design and management plans. School engagement will occur during construction (site visits, school visits by the contractor) Rubbish truck turning at end of Rolleston St – Significant effort went into considering if this was feasible. Unfortunately the proximity of the playing field and gradients/levels mean this is not achievable Hargreaves to Papawai Terr. walkway – Deemed feasible. Keen to know if the community would like us to progress with design and costing