S E C S The Complete Package outhfield ngineering alibration

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Fire Risk Assessments – Are You Competent?. Fire safety legislation requires that, for most premises except private dwellings, a fire risk assessment.
Copywrite SESC January 2009 Unit 26, Dinnington Business Centre Outgang Lane, Dinnington South Yorkshire S25 3QX Tel.: +44(0) Fax +44(0)1909.
Effectively applying ISO9001:2000 clauses 6 and 7.
Professional Health and Safety Consultants Helping your enterprise or your institution with safety management
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
FACILITIES MANAGEMENT Duty Holders process, FM and University James Stapleton FM Health, Safety and Risk Manager.
Construction H&S Policy & Procedures 1 Health & Safety Policy & Procedures PRODUCT OVERVIEW.
Presentation Retail Security Key Holding Mobile Patrols Access Control Systems Manned Security Receptionist CCTV Monitoring.
ISO 9001 : 2000.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
BRC Storage & Distribution Safety and Quality Management System Training Guide
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
A Guide to Fire Alarm Service and Maintenance Requirements.
4. Quality Management System (QMS)
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Welcome ISO9001:2000 Foundation Workshop.
1 CHCOHS312A Follow safety procedures for direct care work.
Ship Recycling Facility Management System IMO Guideline A.962
Basics of OHSAS Occupational Health & Safety Management System
Hazards Identification and Risk Assessment
QUALITY MANAGEMENT STATEMENT
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
MODULE ONE. AIM To understand the causes and spread of infection and be able to apply the principles of infection prevention and control.
OHSAS Occupational health and safety management system.
Health & Safety for School Governors Presented by Phil West Health and Safety Advisor RBWM.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
Successes criteria : All will be able to: You need to have a definition of legislation, policies and procedures then sate which ones do you have to follow.
GM Associates Management Consultants 40 Tullyhubbert Road, Ballygowan, Newtownards BT23 6LZ. Co. Down, N. Ireland Tel Mobile
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
Dinnington Business Centre Outgang Lane, Dinnington

Roles and responsibilities PM
Due diligence checklist
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Quality Policy Cabot Thermals Ltd strives to ensure all asbestos removal works completed are finished to the highest standard, as safely as possible, ensuring.
Jason Bolton Compliance Officer
Maintaining Safety Standards
Health and Safety Policy
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
EPA CONTRACT TEMPLATE Overview
Quality Control.
Auditor Training Module 1 – Audit Concepts and Definitions
Maintaining Safety Standards
EPA SUBCONTRACT TEMPLATE Overview September 2017
The following training presentation is for all employees and is taken upon joining the company team. Quality Management System (QMS) Training Proprietary.
UNIT V QUALITY SYSTEMS.
Temporary Works Co-ordination
Project Development and Managing your Build Agenda
GFSI Certification What Top Management Needs to Know
Contractor Control system
HAVS: Where do we need to be?
PowerPoint presentation
Contractor Control system
RECORDS AND INFORMATION
Quality Department
OHS–Occupational Health & Safety
Contractor Control system
UNDERSTANDING FOR STANDARD
Operationalizing Export Certification and Regionalization Programmes
How to conduct Effective Stage-1 Audit
Welcome to Your New Position As An Instructor
ESS Handbook for Radiation Protection
HAVS: Where do we need to be?
HR AUDIT (An Early Evaluation System) (An Early Evaluation System) S.Jayaprakash., M.Sc (IT), PGD.HRM, DLL & AL.
Presentation transcript:

S E C S The Complete Package outhfield ngineering alibration & C alibration The Complete Package S ervices Ltd. Unit 9 The Point Coach Road, Shireoaks, Worksop Nottinghamshire S81 8BW Tel.: +44(0)1909 518500

QUALITY MANAGEMENT SE&CS Limited is dedicated to providing a services that meet the specific needs of our clients while maintaining exceptional quality. Our objective is to provide client satisfaction through the delivery of service, on time, and with continued support after delivery. We satisfy all regulatory requirements and are responsive to the needs of our customers and their employees. This policy will be achieved by empowerment of our employees, supplemented by the permanent objectives of senior management to continually improve the effectiveness of our Quality Management System. This policy will be communicated to all levels of our organisation and will be included as part of a regularly scheduled management review where the objectives of our organisation and the continued suitability and relevance of the Quality Policy will be examined. Our employees are a key ingredient for the success of our quality goals and the involvement of people at all organisational levels enables the organisation to benefit from their abilities. Senior management is committed to ensuring all employees have the skills, positive environment, training and resources to achieve our quality goals and to work at meeting or exceeding SECS Ltd’s internal and external customer expectations. All personnel have the responsibility, authorisation and organisational freedom to identify and record non-conforming product or service, and to initiate action to prevent the occurrence of any non-conforming service, product, process or quality system. Our employees are responsible for understanding and following this quality policy. SE&CS Ltd’s commitment to Quality is under pinned by the Managing Directors’ retention of the overall responsibility for the Quality Management System.

Company Organagram ALEX PHIN MANAGING DIRECTOR PRINCIPLE DUTY HOLDER, DESIGN AND INSTALLATION ENGINEERING MANAGER ANDREW CONNELLY ACCOUNTANT AUDITORS, SURVEYORS & CDMC ADVISORS DOUGLAS PHIN CONTRACTS & COMMERCIAL DIRECTOR QS, QUALITY MANAGER CAROL KERRY-ACCOUNTS & ADMINISTRATION HEALTH & SAFETY ADVISORS EMPLOYMENT LAW ADVISORS ELECTRICAL CONTRACT MANAGEMENT NICHOLAS GORDON MACHANICAL MANAGER GREGG MILNER ELECTRICAL MANAGER CALIBRATION ENGINEERS CALIBRATION ENGINEERS CALIBRATION ENGINEERS FIRE ALARM ENGINEERS ELECTRICAL TEST ENGINEERS PAT TEST ENGINEERS ELECTRICAL SITE CONTRACTORS EMERGENCY LIGHTING ENGINEERS

CORE SERVICES Tool & Equipment Calibration * Electrical Installation Periodic Testing ** Portable Equipment Testing Microwave Emissions Testing Fire Alarm Testing Emergency Lighting Testing Sound Level Testing Hand/Arm Vibration Testing * Calibration, SE&CS Ltd go onto site in mobile workshops order to expedite surveys and testing for it’s clients. The problem being where tools are in daily use their accuracy can drift and have been altered over a number of years. Accuracy is checked against UKAS verified and calibrated equipment and existing equipment is compared and issued a certificate indicating deviation and variation from the standard device. Small adjustments and repairs are made on site and records amended. ** Electrical Installation Testing , SE&CS Ltd go onto site in order to expedite the tests and surveys for it’s clients. The installations are tested and results recorded in accordance with BS 7671 18th edition and the condition of the installation is surveyed and noted in the engineers report for damage and miss-use. # For the purposes of costing and quoting a general site wide survey is undertaken by SE&CS Ltd to determine the extent asurvey prior to quotation so that the clients is appraised of the expected cost at the outset.

ADDITIONAL SERVICES Surveying, Condition, Structure & Measured * Surveying, Electrical Condition & Distribution ** Surveying, Fire Risk & Strategy (RRO Compliance) Design, Electrical Distribution *** Design, General & Emergency Lighting Design, Fire Prevention Design, Disabled Access & Signage SE&CS Ltd are able to undertake a wide variety of surveys and tests as required by current legislation with regards to buildings, safety and access. Our consultants are highly trained, professional and qualified. ** SE&CS Ltd are able to undertake a wide variety of design and. Our engineers are highly trained, professional and qualified. *** Electrical installation, SE&CS Ltd were asked to go to site in order to expedite a problem for major client, the basic problem being that the electrical distribution had been altered over a number of years and existing drawings had not been amended by Electrical Contractors, SE&CS supplied the engineering & testing labour to the client on a day work basis. The site was completed surveyed and tested with CAD drawings, test certificates and distribution schedules were produced together with a condition report and photographic record of existing installation on a CD-ROM.

QUALITY SERVICES

QUALITY SERVICES

QUALITY SERVICES COMPLETE PROCESS COMMIT AGREE ASSESS: The extent of the task CONSULT: With the client on the task COMPLETE AGREE: On the extent and the cost COMMIT: To the time, date and resource PROCESS COMMIT AGREE CONSULT PROCESS: To undertake Procedures & Tests ASSESS COMPLETE: Procedures, Services, Surveys and Documentation

CUSTOMER LIST

Credits Thank you for watching the World of SECS Limited The concepts, logo’s and brands in this presentation have been commissioned by SECS Limited and remain the exclusive property of SPUTNIK Consulting / Jeremy Spake. They may not be copied or used without prior written permission. This presentation may not be stored in any form of retrieval system. Designed by: Media Team @ SPUTNIK Consulting & Design Produced on behalf of: SESC Limited SECS Limited is registered in England with limited liability No 4355463