CSCI 6307 Foundation of Systems – Exercise (5) Xiang Lian The University of Texas – Pan American Edinburg, TX 78539 lianx@utpa.edu
Exercise Assume that the available vector, C, of resources R0 ~ R3 is <6, 3, 7, 5>. Is there any safe sequence which will lead this group of processes to finish? If so, please find one. If not, please indicate why the system is in a deadlock state. R0 R1 R2 R3 P0 1 2 P1 P2 3 P3 R0 R1 R2 R3 P0 1 2 P1 P2 P3 Table 1: Maximum Claim Table Table 2: Current Allocation Table