Presented by: HJ Arnett Industries, LLC

Slides:



Advertisements
Similar presentations
The D.C. Scout Battery Distribution System Ground Locator
Advertisements

We thought it was a GOOD IDEA, so we did it! We were the first to have quick make-quick break operators on bolted pressure contact switches.
Electricity Lesson II Electrical Symbols EE.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Super Beast- Three-Phase WYE Application
CricketSat Assembly.
EET Survey of Electronics
California Friendly ® Landscape Training Irrigation System Troubleshooting The Metropolitan Water District of Southern California and the Family of Southern.
Electrical Power Systems
Residential Wiring Facts
Hazard - Inadequate Wiring
Wiring the Desklamp Basics of Wiring. Types of Wire For this project we will be using two types of wire: 3 wire and standard lamp wire. – 3 wire The wire.
E2 Motors and Motor Starting
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Coal Mine Connections Lessons from Experience. Why are we talking about Coal mine connections Because we had a situation where the customer wanted a service.
Mega Beast Product Demonstration HJ Arnett Industries, LLC Portland, OR Chris Shipley, Sales Manager
Electrical Principles and Wiring Materials
White Knight Tap Locator HJ Arnett Industries, LLC Portland, OR
Electrical Principles and Wiring Materials Unit #31.
Using a Multimeter McTigue Junior High Technology Ed. Click Here
Electricity Jeopardy Circuits 1 Circuits 2 Electric Current OhmExtra Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
MAINS ELECTRICITY. Specification Electricity Mains electricity understand and identify the hazards of electricity including frayed cables, long cables,
Electricity By: Mr. Brock. Electrical Safety 1) Always disconnect the circuit to be worked on before anything else and lock the cover to the SEP when.
Voltage Tester Used for testing voltage on electrical outlets, fuse clips, and circuit breakers will test voltage from 120 to 600 volts.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 34 Installing Branch Circuits.
Electrical Principles and Wiring Materials Original Power Point Created by Casey Osksa Modified by Georgia Agricultural Education Curriculum Office June.
Shore Power System General Location. Shore Power Power comes on to the vessel in the form of 480 Volt, Three Phase, 60 Hz Alternating Current (A/C) electricity.
Electrical Safety, Subpart K
Starting Residential Wiring.  The most important element in wiring. Safety is proper grounding.  Grounding is the connection of all parts of a wiring.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
Residential Wiring Unit 3 – Installation and Planning.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
Name Your Account Type in a user name of your choice.
REDA Production Systems
SeaPerch Electrical System. Electrical System Overview Assemble the control box. Make the Cat5 connector. Wire the motors to the tether. Wire the control.
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
Electrical Safety OSHE 382, Spring 2016
Electrical Principles and Wiring Materials
Electrical Engineering for Physicists How to get from the 208 VAC 3-phase power in the building to 110- and 220-VAC Code issues All work must be done in.
Electricity Symbols.
Making Circuits Safe SNC1P1 Findlay.
Electrical Principles and Wiring Materials
SeaPerch Electrical System
Electrical Principles and Wiring Materials
Digital Multimeter.
Electrical Systems Electrical Systems
Principles & Applications Residential Wiring Concepts
The D.C. Scout Battery Distribution System Ground Locator
Using the DMM.
HVI HIPOT TEST SET Pft sERIES.
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
Agricultural Systems Technology II
Associated Hazards and Safety Practices
Personal Protective Equipment
Domestic Electricity AIM: To understand the use of domestic electricity and safety features such as fuses, circuit breakers and the earth circuit
Wiring the Light and Relay
Grounds Tester GT400 or GT600.
The Starting & Charging System
MAINS ELECTRICITY.
Wiring Circuits Lesson Plan PSTS: C6-7.
Electrical Principles and Wiring Materials
Electrical components and systems
ST800 Service Tester, 800 Amps.
SeaPerch Electrical System
Presentation transcript:

Presented by: HJ Arnett Industries, LLC Super Beast- Demo Presented by: HJ Arnett Industries, LLC Chris Shipley Portland, OR 1-800-684-9844

First Things First The following presentation is a factory simulation and results may vary for each utility Always wear proper safety equipment when operating the Super Beast Make sure all connections are secure

Getting Started Remove the lock and seal Remove the Meter Disconnect Neutral leading from meter to service location and fuse panel Inspect the meter base and connections Attach the white neutral clip

Place the Super Beast in the socket with the neutral clip attached and the voltage will show from each conductor to the neutral. The following demonstration is a simulated model. At most utilities the meters will read 120V +/- 5%.

Using the Meter Base Adaptor- For the hard to reach places For those hard to reach places, the Meter Base Adapter adds 7 feet reach for easy access. If you are using the meter base adaptor here are the proper steps. Hook up the neutral clip to the metal ground strip through the hole at the bottom of the adaptor.

Using the Meter Base Adaptor- For the hard to reach places Attach the Super Beast into the base adaptor with the green clip located at the bottom of the Super Beast. Clip the alligator clips to the -Meter Socket -Weather Head -Transformer -Junction Box

Points of Connection- Overhead

Points of Connection- Underground

Insert or Connect Unit to Meter Base When the unit is plugged in, the meters will show current line voltage, no load When the unit is connected to the Meter base, the bottom two plugs are not energized. They are simply used for support in the meter or meter base adapter.

Apply load to the left conductor With the toggle switch moved to the left you are applying 20 Amps to the left conductor. One of the following examples will occur. Safety Stop Test Switch moved to Left Position Switch has double-throw safety feature to prevent internal short-circuits.

Applying load to the left conductor This photo is of the load being applied to the left conductor with nothing wrong on the utility side of the meter can. The left meter drops 1 volt which is acceptable with a 20 Amp load applied. 120 V – 5% (maximum acceptable drop) = 114 VAC. 6 Volt drop may be OK, but look close at all connections, wire size, length of service drop. Determine your standards.

Applying load to the left conductor This photo is of a bad left conductor. The left meter decreases and the right meter stays relatively the same at 126V.

Applying load to the left conductor This picture shows a Bad left conductor with the left meter going blank and the right meter staying close to the original 111V.

Applying load to the left conductor Here we have a partially open neutral. The left meter dips significantly and the right meter increases above the usual voltage. Also, if you toggle to the right, you will see the same voltages reversed.

Apply load to the right conductor With the toggle switch moved to the right you are applying 20 Amps to the right conductor. One of the following examples will occur.

Applying load to the right conductor This photo shows no problem on the utility side of the meter. A load is being applied to the right conductor and the right meter only drops 1 volt and the left stays the same.

Applying load to the right conductor Here we have a bad right conductor. The load is applied to the right side and the right meter drops (greater than 5%), but the left stays the same.

Applying load to the right conductor This picture represents a Bad right conductor with the right meter going blank and the left meter staying at the original 121V.

Applying load to the right conductor Here we see that there is a partially open neutral due to the decrease in the right meter and an increase on the left meter. Once again if you toggle to the left, you will see the same voltages reversed.

Full Open Neutral You may move the toggle switch to either the left or right and one meter will rise to approximately 240 V and the other will go blank.

Super Beast Tutorial If you have any trouble using the Super Beast, please give us a call at 800-684-9844. Remember, the Super Beast is to be used on 120V service only If you feel that the 20 Amp load is insufficient for isolating the trouble, we do have the Mega Beast available with up to 80 Amps of applicable load.