Production Cryo HL-LHC BPMs

Slides:



Advertisements
Similar presentations
SPS New Wire Scanner Mechanics Review
Advertisements

SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Aluminum bellows for experiments
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Fabrication of LHC cavities at CERN N. Valverde Alonso, G. Favre,T. Tardy, F. Pillon, R. Claret, S. Mastoura, E. Rigutto,J. Geisser
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
LCWS11 WG4 Fully featured accelerating structure engineering design
ALIGNMENT OF THE NEW TRIPLETS
PROTECTION SHELLS TE-VSC.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
LIU Wire Scanner Project
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
on behalf of the CLIC active pre-alignment team
Roadmap for triplet cryostats
Ultra-vacuum components and systems
TAXS and TAXN ABSORBERS - OVERVIEW
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
11 T Dipole Integration & Plans M. Karppinen
LIU Wire Scanner Milestones June 2017
Status of material tests
Installation of an Instrument on a CERN machine
LEP cryostat Procurement strategy and plans
Cryostat procurement, status and plan, QA/QC
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Cryo-assembly design D. Ramos, V. Parma, C. Mucher, H. Prin, M. Souchet, J. Hrivnak, M. Moretti, L. Mora, F. Savary, L. Gentini Review of the 11T Dipoles.
Complementary ISTC Projects #3888, 3889p
FCC R&D WP5 Cavity Fabrication Status May 2017 M
LARP Phase II Secondary Collimator RC1
Preliminary Y-chamber specifications – First draft
Components for the Machine-Interface Regions
Cryostat design Mechanical design: Thermal screens: Specifications:
Cedric Garion, TE-VSC-DLM, WP12
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
HL-LHC Collimators: Components for absorbers 3rd HiLumi Industry Day - May 2017 Warrington - United Kingdom Oliver Aberle – CERN (EN-STI) On behalf of.
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Design of beam lines inside 11T dipoles and TCLD collimators cryostats
Parts exchange for HL-LHC AUP Q1&Q3
Superconducting RF Crab Cavities
Thomas Otto, TE Department, CERN
ELENA Magnet Installation Planning
Update on beam screen issues
Update on beam screen with shielding and other vacuum issues
LARP Phase II Secondary Collimator RC-1
Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Crab – RFD prototype: Fabrication Status Update
BGC Collaboration Meeting –
Project management Ray Veness.
List of IPAC19 papers with reference to HL-LHC
HL-LHC Engineering Change Request # REDUCTION OF Q1 BEAM SCREEN COOLING TUBE DIAMETER FROM Ø16 MM TO Ø10 MM N. Kos TE-VSC TCC #77,
WP13 outsourcing: Hollow Electron Lens
Outsourcing for the BGC
CERN-FAIR Steering Committee
Presentation transcript:

Production Cryo HL-LHC BPMs G. Schneider, R. Veness, M. Krupa, M. Wendt WP 13 meeting 27/05/2019

HL-LHC BPMs Q1 to D2 BPMQSTZA BPMQSTZB BPMQSWZA/B BPMQBWZA/B TOTAL Series 4 20 8 36 Spares 2 Prototypes Courtesy M. Krupa WP13 meeting

Installation example BPMQSZTB G. Schneider BE-BI

Example of BPM, here BPMQSTZB G. Schneider BE-BI

HL-LHC BPM Addendum CERN delivers material Many skills required: Precision machining Gold plating Copper plating without organic additives (100 microns) Electron beam welding Laser welding Brazing to tungsten Precision tube bending Precision metrology UHV Cleaning 27/05/2019

BPM body status Drawings in advanced states BPM body produced Manufacturing studies ongoing CF DN16 manufacturing options Increase screw from M4 (is M5 now) to M6 Copper plating CERN has 100% in-house knowledge 27/05/2019

BPM installation shared responsibility WP12/WP13/WP15 Memorandum EDMS 2105453 close to be finalized Responsibility share between BE-BI, EN-SMM TE-VSC and TE-MSC for the assembly of HL-LHC Inner Triplet and D2 Cryogenic Beam Position Monitors 27/05/2019