Summary – what we discussed and learned (accelerator)

Slides:



Advertisements
Similar presentations
WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Introduction Status of SC simulations at CERN
S. White, LBS 17 May Van Der Meer Scans: Preliminary Observations.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Beam Commissioning WG, 10 August Luminosity Scans in the LHC S. White.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Beam-beam deflection during Van der Meer scans
Luminosity measurement at LHC (The machine point of view) Enrico Bravin AB/BDI Large part of the material presented here has been produced by the LBNL.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
14/1/2011 LHC Lumi days - J. Wenninger 1 IP positions and angles, knowledge and correction Acknowledgments: W. White, E. Calvo J. Wenninger BE-OP-LHC.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
Luminosity Scans at the LHC
Y.Papaphilippou Thanks to
Operating IP8 at high luminosity in the HL-LHC era
LHC Wire Scanner Calibration
Beam Energy & Intensity: One bunch during full cycle
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
J. Alexander + Cornell accelerator group Cornell University
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Steering algorithm experience at CTF3
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Beam-beam effects in eRHIC and MeRHIC
Emmanuel Tsesmelis TS/LEA 26 January 2007
Wire, flat beams and beam-beam MDs in 2017
Emittance growth AT PS injection
Optimization of Triplet Field Quality in Collision
LIU, ABP-CWG, PBC, miscellaneous
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Follow-up of HL-LHC Annual meeting
LHC Emittance Measurements and Preservation
Space Charge Study Group
Summary of Week 11: 14 – 21 March
Alice solenoid – orbit distortion
Lost at 12:05 to power converter (RTQX2.R1) problem
Luminosity measurement at LHC (The machine point of view)
LHC Beam Operations Past, Present and Future
HL-LHC operations with LHCb at high luminosity
Feed forward orbit corrections for the CLIC RTML
News on TMCI in the SPS: Injecting high intensity bunches
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Simulating transition crossing in the PS with HeadTail
Studies on orbit corrections
Proposal for a CESR Damping Ring Test Facility
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Another Immortal Fill….
LHC beam orbit and collision position determination & control – performance and issues, prospects for Run 3 Orbit in collision - Luminosity WS - J. Wenninger.
Overview of ALICE luminosity-determination methodology in Run 2
Impact of orbit perturbations on luminosity calibrations
Measurement of the beam (transverse) emittances
LHC An LHC OP guide… under construction J. Wenninger
ATLAS full run-2 luminosity combination
Emittance Studies at Extraction of the PS Booster: Emittance Calculation S. Albright, F. Antoniou, F. Asvesta, H. Bartosik, G.P. Di Giovanni, M. Fraser,
Monday 152 bunch operation summary
LHC LumiDays 2019 June CERN Anne Dabrowski Ilias Efthymiopoulos Witold Kozanecki W E L C O M June 4,
Presentation transcript:

Summary – what we discussed and learned (accelerator) G. Sterbini (starting from a personal perspective to trigger discussions) 5th June 2019 https://indico.cern.ch/event/813285/

Starting considerations Improving the present performance of the VdM scans is very challenging and call for (even closer) collaboration between experiments and machine in a series of subjects. Depending of the experiments, among the contributions to the systematic errors possibly related to the machine we have scan-to-scan variation, x-y non-factorization, orbit stability, beam current-calibration, beam-beam effect, … In this context, the present understanding of the luminosity and emittance evolution can be improved by a closer collaboration with the experiment. e.g., uncertain breakdown from R. Hawkings (ATLAS) 5th June 2019 https://indico.cern.ch/event/813285/

VdM Bunch from Injectors H. Bartosik General consensus on improved quality of the beam form the Injector Chain after 2012, but this did not solved the non-factorization. For Run3, the strategy in the PSB may change due to the improved LINAC4 emittances, but clear commitment in producing the VdM beam during Run3 first year. 5th June 2019 https://indico.cern.ch/event/813285/

https://indico.cern.ch/event/813285/ Optics for the VdM scan H. Garcia Morales Difficulties to measure the optics for VdM scan (b*=19/24 m, Q1 k-mod). In principle an optics with b*=17 m can be easier to measure. Can a b*=17 m optics be considered for VdM Run3? 5th June 2019 https://indico.cern.ch/event/813285/

Protocol for the VdM scans Beam displacement sequence controlled by experiment-provided files: pre-programmed scan are less error prone approach! Clear non-factorization observed from the experiments... LHCb is performing a 2D scan aiming to relax the hypothesis of the x-y factorization. Can a similar approach be considered in the other experiment? M. Holstettler 5th June 2019 https://indico.cern.ch/event/813285/

https://indico.cern.ch/event/813285/ VdM BB simulations The linear approach used until now should be improved  from single particle parameters to distributions. To find optimal agreement between the COMBI/Balagura results. Find a parametrization to apply this correction in the VdM scan (complex BB schedule…) T. Pieloni 5th June 2019 https://indico.cern.ch/event/813285/

https://indico.cern.ch/event/813285/ Effect along the train Valerie Lang Patterns with trains emerged: are they related to BB? 5th June 2019 https://indico.cern.ch/event/813285/

Instrument calibration and precision M. Palm Important to track and document the performance of the beam instrumentation (legacy data). Synergy with LHCb for measuring the ghost bunches. DOROS performance good for the (limited) intensity drop observed during the VdM scan. 5th June 2019 https://indico.cern.ch/event/813285/

Instrument calibration and precision M. Gasior Important to track and document the performance of the beam instrumentation. Synergy with LHCb for measuring the ghost bunches (limit in the BSRL). DOROS performance very good for the (small) intensity drop observed during the VdM scan. 5th June 2019 https://indico.cern.ch/event/813285/

VdM scan and crossing angle Currently unused, Q1 BPMs could be made available during VdM scans to quantify any drifts from zero crossing angle. Same BPM, same cables, same electronics are used to acquire both beams which eliminates many systematics. from R. Jones 5th June 2019 https://indico.cern.ch/event/813285/

Orbit stability and Corrector Hysteresis Orbit feedback is off during the VdM. Orbit drift has to be taken into account during the scan: more automatic approach to monitor the orbit drift? ATLAS observed hysteresis effect  systematic characterization during Run 3? can leap-frog scan help? 5th June 2019 https://indico.cern.ch/event/813285/

Emittance measurement O. Karacheban [Despite the efforts with WS and BSRT] “Emittance from luminosity not self consistent”. Significant (and appreciated) efforts from CMS in the emittance scans. Transverse and longitudinal emittance is a very important input for the luminosity model. I. Efthymiopoulos  5th June 2019 https://indico.cern.ch/event/813285/

Bunch-by-bunch luminosity I. Efthymiopoulos  First results of the bunch-by-bunch fluctuation presented. It seems the effect is enhanced in 2018 with the BCMS beams, therefore the interest to further understand it as may affect the machine/experiment performance in Run 3 or HL-LHC. 5th June 2019 https://indico.cern.ch/event/813285/