SPS 2, 3, 4 and 6 during W26-28 2019 D.MCFARLANE EN-ACE-OSS 26/06/2019.

Slides:



Advertisements
Similar presentations
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
Advertisements

Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
V.Montabonnet - Safety during Hardware Commissioning 18 October Contents  Electrical circuits in the LHC context  Electrical Hazards  Preventions.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Update on the PSB Cooling and Ventilation Systems
SPS-FIRE The SPS Fire Safety Project Planning Status
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
Proposition de routing des cables :
LIU – EVM status and next steps
SPS LS1 Planning meeting (N019) 04/09/13
Update on the Critical Path of the PS Booster Schedule for the EYETS
SPS Winter stop Planning meeting (N06) 05/01/2011
YETS & LS2 Works EN-El on LHC / Power distribution
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
BA6 – crab cavity activities in EYETS
EYETS LHC 2016/2017 Works EN/EL/CF
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
LHC-EYETS 2016/17 Coordination meeting #18
K. Foraz on behalf of OSS members
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
SHORT LHC-TS Coordination meeting #1
LIU–PLI report LIU SPS meeting.
EN 4946 – Refurbishment of Electrical Substations
De-cabling strategy during YETS
n_TOF “Draft” plans for YETS and LS2
SPS YETS 2015/2016 Planning meeting (No.14) 03/02/16
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
NA CONSOLIDATION & SAFETY SYSTEMS
SPS activities during LS2 TE-EPC (Power Converter Group)
Short LHC-TS week 38 Confirmed by LMC on 16th August
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
K. Foraz on behalf of OSS members
BE-ICS work for SPS Safety Systems
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Que faire lorsque je suis confronté à un problème lors de la connexion à Norton Server?
Business opportunities related to CERN electrical network
Je suis d’accord = I agree Je ne suis pas d’accord = I don’t agree avec = with J’imagine = I imagine.
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 09/01/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
North Area Safety Review 2019
Site diaporamas carminé
SPS Planning meeting for LS2 #25 Vacuum sectors status
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)
SPS Planning meeting for LS2 #26 Vacuum sectors status
Presentation transcript:

SPS 2, 3, 4 and 6 during W26-28 2019 D.MCFARLANE EN-ACE-OSS 26/06/2019

SPS 2: Works Ongoing W25/26 BA2: Surface MACAO power converters replacement Dismantling of old converters Ncod Transformer consolidation for MBE.2103M (x3 replace by 1) RMT112/A2 Underground: Install Safety Lights & Cable Trays Maintenance préventive des éclairages minimums Shaft/TA Dry riser testing Supprimer pompe eau usee tunnel TT20 Modification of magnet supports?? Arc 2+ aC coating 17/04/2019 J.MEIGNAN

Remarks from the aC coating team A few issues maybe to mention this afternoon : We are using bikes in ARC 3+ / ARC 2-. Bikes are identified (TE-VSC-SCC) , other people are using it. Please don’t use them. We avoided to use locks but it seems to be necessary…… Some-body used our laptop that we are using to control our coating equipment, process was ongoing. Luckily no interruption of process.  Please don’t touch our equipment / laptops !!! This morning there was a short interruption [sec] in powering in ARC 2+ (lights / 220 V / 380 V). Our coating equipment stopped (QF23010). We were there and could intervene. If this was not the case, this could have created problems. Origin: Unforeseen interruption?  Testing? 17/04/2019 J.MEIGNAN

SPS 2: Works Scheduled W27/28 BA2: Surface Réalisation de peinture au sol au niveau des porte deS sas MAD et PAD New CIS on SPS Main converters (BA2) MACAO power converters replacement (False floor re-inforcement plus installation) Transformer consolidation for MBE.2103M (x3 replace by 1) RMT112/A2 Consignation tableau réseau électrique ondulé 230V BA2 Tirage de cables reseau Ethernet FS_(WP3)_Sprinkler supply Underground: Install Safety Lights & Cable Trays Pose cables Coax pour BPM Shaft/TA FS_(WP4) Installation Sprinkler (TA) Supprimer pompe eau usee tunnel LSS2 VVSE_21799 investigation/repair Beamline Activities (Phase 1) Remove amplifiers from LSS2 Removal of 5 ZS Septa Removal of 5 ZS Septa (TRANSPORT) TT20 FS_(WP2) Air Sampling Networks & Exhaust Lines Installation (TT20) Arc 2+ aC coating 17/04/2019 J.MEIGNAN

SPS 3: Works Ongoing W25/26 BA3: surface De-cabling campaign HV works Transformer maintenance Upgrade of the “Faraday cage” RF powering consolidation Shaft/TA: De-cabling campaign: (morning shift) Coax lines (Afternoon shift) Arc 3-: aC coating LSS3: De-cabling campaign (morning shift) CV piping works (LSS3+) (Afternoon shift) Coaxial lines LSS3+ (Afternoon shift) 17/04/2019 J.MEIGNAN

SPS 3: Works Scheduled W27/28 BA3: surface Cable Campaign (BA3, BAF3, BB3) Oil Transformer maintenance (BB3) BA3 - Upgrade ventilation 'Faraday Cage' SMQ Power Converters Consolidation (Filter changings) HV Electrical Works Consolidation of the electrical infrastructure in SPS3. SPS 200 MHz amplifiers maintenance / consolidation Low Level RF Upgrade (Decommissioning & De-cabling / Faraday-cage upgrade (CV, Lighting, Rach, Floor,..)) RF powering consolidation Installation des piquages pour le refroidissement des racks TTi Shaft/TA: Pulling of fibre optic ducts: (morning shift) Arc 3-: aC coating LSS3: CV piping works (LSS3+) (Afternoon shift) Coaxial lines LSS3+ (Afternoon shift) 17/04/2019 J.MEIGNAN

Message from EN-EL Salut David,   Hier a eu lieu la VIC pour nos travaux surface au BA3. Comme il a été convenu avec la coordination, que durant les semaines S27 à 30 nous travaillerons qu’en surface (BA3-BB3-BAE3-BAF3) afin de permettre aux autres activités de se poursuivre en souterrain. Cependant il nous a déjà été demandé de ne pas travailler dans les zones mentionnées ci-dessous. Je sais que le BA3 est sensible en terme de cohabitation, on va tacher de compiler, mais il faudrait s’assurer que tout ceci soit cadrer car si pendant ces 4 semaines je ne peux pas tirer la majorité des câbles inter-surface je serai moi aussi contraint de décaler mon planning. Bonne journée Guillaume 17/04/2019 J.MEIGNAN

SPS 4: Works Ongoing W25/26 All areas: Cabling campaign Maintenance préventive des éclairages minimums BA4: Surface EIS upgrade on 2 converters (400V) Tirage de cables reseau Ethernet (2019) LSS4: Maintenance sur boite froide Hélium TS45 BB4/ECA4: Transformer consolidation for RBI.410010 (x1 replace by 1) RMT310/B4. (TAG41) Access control commissioning of the zone 1st & 2nd stage (access to TI8 possible via TT40.) 1st Stage: 20th & 21st June 2nd Stage 27th & 28th June TT40/TI8 Mise a la terre de 20 racks CIWRA situes sous la ligne faisceau du TI8 et TT40 TI8 Smoothing (Vertical/horizontal) 17/04/2019 J.MEIGNAN

SPS 4: Works Scheduled W27/28 All areas: Cabling campaign BA4: Surface EIS upgrade on 3 converters (18KV) EIS upgrade on 2 converters (400V) Converter modification for EIS upgrade LS2 Underground: All areas FS_(WP2) SSI interfaces implementation / instrumentation/connexion Shaft/TA Fire damper main ventilation (level -1) LSS4: Maintenance sur boite froide Hélium TS45 ECX4: FS_(WP2) Air Sampling Networks & Exhaust Lines Installation (ECX4) BB4/ECA4: Transformer consolidation for RBI.410010 (x1 replace by 1) RMT310/B4. TT40/TI8 Mise a la terre de 20 racks CIWRA situes sous la ligne faisceau du TI8 et TT40 TI8 Smoothing (Vertical/horizontal) 17/04/2019 J.MEIGNAN

SPS 6: Works Ongoing W25/26 BA6: Cast Resin Transformer maintenance Transformer refurbishment RMT117/A6 Surface works FS sprinklers Short cable campaign for Access system All underground areas: Maintenance préventive des éclairages minimums FS WP2 fire detection installation Shaft/TA: FS WP4 Dismantle old Sprinkler system FS WP4 Sprinkler installation Lift/Monte-charge maintenance (17/06/19) LSS6: FS WP1 Fire Doors (TBC) Arc 6+: Dry riser Installation 17/04/2019 J.MEIGNAN

SPS 6: Works Scheduled W27/28 BA6: Surface MACAO power converters replacement (False floor re-inforcement plus installation) Cast Resin Transformer maintenance Transformer refurbishment RMT117/A6 Replacement of capacitors (Output filter damaged) on Converter RQID.610300 Electrical powering for SPS Fire Safety Work Package 2 : fire detection and protection systems BA6 travaux tuyauterie Eau Glacée pour BM6 All underground areas: FS_(WP2) Tests Shaft/TA: FS WP4 Sprinkler installation LSS6: Install Fire door in LSS6+ 17/04/2019 J.MEIGNAN

SPS 7: Works Scheduled W27/28 BA7: Surface (BA7) Access Point & Site Rack Installation Cabling campaign BA7 for PPS Underground: All areas Vérification réglementaire des installations électriques modification connectique SPS PPS 17/04/2019 J.MEIGNAN

Any questions?