Development Work Group 194

Slides:



Advertisements
Similar presentations
Shipperless & Unregistered Workgroup Wednesday 29 th January 2014.
Advertisements

SGN S&U Update Lisa Warnock 1 st November Agenda Data cleansing (set to dead/extinct) Shipper interaction SGN root cause measures.
Shipperless & Unregistered site working group Recommendations to Process Backlog Shipper Activity Monthly report No interest - orphaned Widened identity.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve.
1 Industry Shipperless &Unregistered Working Group Wednesday 5 th May 10.30am at xoserve.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
1 Industry Shipperless &Unregistered Working Group Thursday 7 th January 10.30am at xoserve.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
COR2789 – Measures to Address Unregistered and Shipperless Sites Implementation of MOD424, MOD410a & G
Best 20 jobs jobs sites.
1 Modification 0152V Implementation Matters 25 October 2007.
Understanding and Complying with Audits
Supply Point Register 21st November 2011
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Revised registration for unregistered sites
Chris Warner Network Code Manager
Agenda Action Review Update on IX and iGT access Testing strategy
PAF Risk Register and PARR mapping
Project Nexus Workgroup MPRN Lifecycle 11th August 2014
Modification th July 2008.
Large Supply Point Reconciliation which spans Pre & Post Go Live
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Theft on Shipper-less Sites
Weekly Progress Update 15 June 2018
Project Nexus Workgroup
Summary of a MAP portfolio
Modification 0429 scenarios v2.0
Industry Shipperless & Unregistered Working Group
Industry Shipperless & Unregistered Working Group
Shipperless and Unregistered Workgroup
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Connections & Registration
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Connected System Exit Points - Update
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Development modification group 194
Development modification group 194
Joint Theft Reporting Review (from meeting 1st March 2019)
Unregistered Sites Reports
M Number Creation process
Development modification group 194
Development modification group 194
Modification 421 – Updates and Benefits Case
AQ BTU Form – Process & Timeline 29th September 2009
Shipperless/Unregistered Sites
Unregistered and Shipperless Process
xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper
Actions Updates Action 0282/006 – Exclude from AQ process
Modification 440 Project Nexus iGT Single Service Provision
Development modification group 194
Annual Quantity (AQ) 45.
Development Work Group 194
DSC Change Committee Update
Customer Issue Management Dashboard CoMC - July 2019
XRN Enabling large scale utilisation of Class 3 – MOD0700
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

Development Work Group 194 Orphaned Sites Analysis 30 June 2008

Lifecycle of a meter point Meter point requested and created E.g. Job cancelled, duplicate etc Evidence of meter installed at site No evidence of meter ever installed at site Not yet confirmed (i.e. unregistered) Scenario A – Confirmed by siteworks Shipper Scenario B – Confirmed by another Shipper Meter point end dated after xoserve investigations and discussions with Shipper. No gas consumed. Gas quantity unknown – included in RbD – nothing in Verification – will eventually become Scenario A or B Pre-confirmation gas is left in RbD LATE CONFIRMED GAS ESTIMATE IN VERIFICATION All historic gas is billed to Shipper and removed from RbD “Orphaned sites”

Orphaned Sites – Energy Analysis Late confirmed sites where M Number requesting Shipper does not confirm Colloquially called “Orphaned Sites” Confirming Shipper can avoid pre-confirmation energy (existing industry agreement) Pre-confirmation energy remains in RbD Pre-confirmation energy is a reconciling item in RbD Verification Following slides show numbers and associated energy of “Orphaned Sites” for the last 29 months (Jan 06 to May 08)

Orphaned Sites – Time between meter fix and confirmation

Orphaned Sites – Estimated Energy between meter fix and confirmation - mWh

Orphaned Sites – Estimated Energy between meter fix and confirmation - %