R.TIEULENT - ALICE Offline Week

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Slide 117 th DCS Workshop – October, 10Francesca Poggio ZDC DCS Status Report Francesca Poggio Università degli Studi di Torino INFN, sezione di Torino.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
1 Databases in ALICE L.Betev LCG Database Deployment and Persistency Workshop Geneva, October 17, 2005.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
V0 present status of the V0 project at CERN A. Sandoval, R. Alfaro.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Calorimeter Status Electronics Installation and Commissioning
SPD DCS Overview & FED Server
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
TPC Commissioning: DAQ, ECS aspects
ATLAS MDT HV – LV Detector Control System (DCS)
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Controlling a large CPU farm using industrial tools
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
The LHCb Run Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
TPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

R.TIEULENT - ALICE Offline Week Status of the V0 - DCS 09/10/2007 R.TIEULENT - ALICE Offline Week

On-Offline connection diagram (Use case6) Publish Agent FEE DAQ DA DAQ FES DAQ Logbook DB Alien FC T0 Custodial Storage Conf. DB DCS DCS Shuttle 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week V0 [FSM?] 02/10/07 Database(s) PVSS II Control room (ACR) PVSS II PVSS II OPC client DIM client User interface Ethernet CR3 CR3 CR3 PVSS II PVSS II PVSS II OPC client DIMclient OPC client CAEN OPCserver E Wiener OPCserver E PCI-CAN C Counting room ½ CR4-Z04 LV (+- 6V) 1 SY1527 Shared with T0 HV 25.04.2005: Cosmetic changes, updates after cable meeting (Jean-Yves Grossiord) CAEN SY crate shared between T0 & V0 LV with CAEN Easy (64 channels) Confirmed: no calibration system anymore 01.11.2004: Cosmetic changes changed to 64 HV channels (Andre) <- is this correct?? 22.04.2004: Update for TDR Light source for calibration is no linger there?? 19.03.2004: Update for DCS workshop (Raphael Tieulent) 64 16 1 Cavern UX-O20 DCS board VME (wiener) Detector (shoe box) PMT Inside magnet Detector High Voltage 09/10/2007 Low Voltage R.TIEULENT - ALICE Offline Week FEE Crate Control

R.TIEULENT - ALICE Offline Week Front End Electronics CCIU, pilot board - collects the CIU data - provides the final triggers - interface with the DAQ - interface with DCS CIU, one board per ring charge integration time digitalization trigger pre-processing DCS board SIU Mezzanine 09/10/2007 R.TIEULENT - ALICE Offline Week

Installation and Commissioning Status What has been done: V0C Detector installed and tested (using custom FEE) 2-6 April 2007 LV and HV accessible from DCS at point 2 Test in lab with DCS, DAQ, TRG June 2007 test made with only 1 CIU board (corresponding to 1 ring of V0) Remaining Key Dates: End of test and calibration of electronics boards in lab: End of October Test in lab with DCS, DAQ, TRG with final FEE: End of November Installation of DCS at point 2: Beginning-December Installation and configuration of FEE at P2: Mid-December Installation of V0A: January 2008 09/10/2007 R.TIEULENT - ALICE Offline Week

Development of the control 09/10/2007 R.TIEULENT - ALICE Offline Week

Front-End-Electronics in DCS Control and monitor channels Only 1 DCS Board  No Control layer with a FED Client/Server Load configuration data from database PVSS II (FEE - Client) Config. DB Supervisory Layer Fee Server Field Layer DCS board CCIU CIU1 CIU1 CIU1 CIU1 CIU1 CIU1 CIU1 CIU8 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week FEE Control panels 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week V0-DCS State Diagram OFF GO_STANDBY GO_OFF CONFIGURE (run_mode) STANDBY GO_STANDBY CONFIGURE (run_mode) GO_BEAM_TUN GO_READY DOWNLOADING STBY_CONFIGURED GO_STBY_CONF CONFIGURE GO_READY MOVING_STBY_CONF MOVING_BEAM_TUN BEAM_TUNING DOWNLOADING MOVING_BEAM_TUN MOVING_READY DOWNLOADING GO_STBY_CONF GO_BEAM_TUN CONFIGURE (run_mode) READY 09/10/2007 R.TIEULENT - ALICE Offline Week

On-Offline connection diagram (Use case6) Publish Agent FEE DAQ DA DAQ FES DAQ Logbook DB Alien FC T0 Custodial Storage Conf. DB DCS Shuttle 09/10/2007 R.TIEULENT - ALICE Offline Week

V0 - DCS Preprocessor Add AliVZERODataDCS class to process DCS Data Extract the Means and Widths during a physics run of the 64 HV Channels Corresponding DCS Aliases: V00/HV/V0[A-C]/SECTOR[0-7]/RING[0-3] DCS alias N of channels Data type Unit Value % fluctuation Update Frequency (s) V00/HV/V0[A-C] /SECTOR[0-7] /RING[0-3] 64 float V 1800 1 10 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week Gain adjustment V0 detector should run with a common gain on all channels DA will calculate from data gain, sigmas and pedestals All PMTs have been calibrated V0Preprocessor will calculate the new voltages which should be apply via DCS panels 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week Conclusions DCS Control of the V0 is well advanced It is used daily in lab for the test of the FEE boards DCS Preprocessor developed, tested and committed 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week Backup 09/10/2007 R.TIEULENT - ALICE Offline Week

V0 Node Synchronization table V00_DET V0 MODULE (V0A/V0C) FEE VME Crate OFF STANDBY ON DOWNLOADING CALIBRATING STBY_CONFIGURED READY MOVING_READY MOVING_BEAM_TUN MOVING_BEAM_TUNING MOVING_STBY_CONF BEAM_TUNING TRIPPED NO_CONTROL SYS_FAULT 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week VME Control panel CanBus 09/10/2007 R.TIEULENT - ALICE Offline Week

V0 Front-End-Electronics in DCS Progress Status FEE server on DCS Board: Driver for communication with CCIU: developed, tested and fully functional FEE server: developed, tested, stable and fully functional DIM server for CTP (to set CTP option code : developed, tested, stable and fully functional PVSS: State machines defines and fully implemented FEE Client (DIM) stable and fully functional Front panels : completed VME Crate: Control, FSM and panels completed using the work of Lionel Wallet. Remaining work: Interface with the Configuration DB. 09/10/2007 R.TIEULENT - ALICE Offline Week

Résumé of HV/LV Sub-system CAEN Crate: Crate installed in CR4 controlled by DCS Need to develop the operation of the crate by 2 operators (T0/V0) PVSS: All panels developed FSM: FSM completed including the SW interlock between LV and HV. 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week The V0 detector connector PM scintillator WLS fibres optical fibres Two scintillator hodoscopes at low angles trigger for the central detectors background filter for Muon 2 x 32 channels (V0A et V0C) 8 sectors of 4 channels per hodoscope 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week The V0-FSM Tree V00_DET V0 A V0 C V00_INF R V00_FE E QUAD2 VME Crate CAEN Crate QUAD1 DCS board CIUs QUAD0 QUAD0 [0 – 3] VME Crate CAEN Crate CIU1 CIU2 CIU3 CIU4 CIU5 HV SEC1 SEC0 CIU6 LV NEG LV POS CIU7 CIU7 V0DCSBoard [0 – 7] [0 – 1] V0CIUBoard Ring 3 Ring 2 Ring 1 HV Ring 0 [0 – 3] Control Unit Logical Unit Device Unit HV Channel LV- Channel LV+ Channel Device 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week Voltage Quadrant FSM HV_SECTOR 1 LV Channel i=[0,3] LV Channel i=[0,1] HV_SECTOR 0 QUADRANT 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week HV/LV Sub-system Use the principle of Caen Channel Stock Settings developed by Antonio Franco for the HMPID. Will move to new FW component as soon as it becomes available. QUAD0 HV SEC1 SEC0 LV NEG LV POS [0 – 1] Ring 3 Ring 2 Ring 1 HV Ring 0 [0 – 3] HV Channel LV- Channel LV+ Channel 09/10/2007 R.TIEULENT - ALICE Offline Week

Voltage Quadrant Interlock HV_SECTOR 1 LV Channel i=[0,3] LV Channel i=[0,1] HV_SECTOR 0 POWER_MODULE If (Any LvChannel != ON) and (Any Hv Sector !=OFF) Then SWITCH_OFF HVSectors 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week Working principle Control of the DCS board components : TTCRx registers (example : TTC channel B data output for the CCIU board) Control of the FEE boards (CCIU and CIU) components HPTDCs Modes Pedestals … Collection and publication of monitoring data DCS board FEE 09/10/2007 R.TIEULENT - ALICE Offline Week

Control panels proposal Main panel with : Configure (from configuration file or database configuration parameters?) Reset Child panel with status of the different components of the system controlled by the DCS board HPTDC on DCS board CCIU registers CIU registers Sub-child panels with individual access to registers and functions of the previous components 09/10/2007 R.TIEULENT - ALICE Offline Week

Summary of calibration procedure Gains and pedestals computed by Online Monitoring using dedicated data (minimum bias and +/- 10 around the event of interest mini-events respectively) stored in the FEE and sent to the DAQ with the events of interest. Note that this procedure is achieved by the FEE independently of the Central Trigger Processor. These values will be written in the Calibration Data Base for later use by offliners and updated at each run change. Validity period will be run interval unless a hardware failure occurs. 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week Use case 6 Data flow DAQ FEE SHUTTLE DA F.R. Publish agent C.C. DAQ FES T0 custodial storage DAQ Logbook DB AliEn FC F.R. Config’tion DB SHUTTLE DCS F.R. : Filimon Roukoutakis C.C. C.C. : Christophe Combaret 09/10/2007 R.TIEULENT - ALICE Offline Week

Calibration excel file 09/10/2007 R.TIEULENT - ALICE Offline Week

Online output data for DAQ and monitoring An event as seen by the V0 Front End Electronics will be: Charges (64). Arrival times (64) and time response widths (64). Beam-Beam (BB) and Beam-Gas (BG) flags (64). States of the 5 triggers sent to the CTP (MinBias, BB, BG, Central,SemiCentral). For each event triggered by a L2 signal coming from the CTP (called Event-Of-Interest), the following information will be sent to the DAQ: 1. The event of interest itself with all the parameters listed above, for physics analysis 2. The events between EoI-10 to EoI+10 (charges and BB/BG flags), for monitoring pedestals, pile-up… 3. The 10 last V0 Minimum Bias events (charges and BB/BG flags), for monitoring gains 09/10/2007 R.TIEULENT - ALICE Offline Week

Calibration procedure Calibration parameters are computed online in the DAQ LDC from sampling dedicated data Results are made available as ROOT files in the DAQ FES DCS accesses the Root file in the DAQ FES, compares the parameter values to reference values stored in the DCS Configuration DB and updates the FEE values if needed. 09/10/2007 R.TIEULENT - ALICE Offline Week

R.TIEULENT - ALICE Offline Week Calibration Calibration CDB file has been created and CDB reading implemented. Calibration parameters stored into CDB are : 128 gains, 128 pedestal means, 128 pedestal sigmas (2 QDC per channel) 64 time gains and 64 time offsets i.e. 512 floats, 4 kB All these parameters are accessible through class AliVZEROCalibData 09/10/2007 R.TIEULENT - ALICE Offline Week