Quality Control Infrastructure

Slides:



Advertisements
Similar presentations
Alexander Carrington and Liam Martell. Introduction Client: Tom Goldsworthy – G-Group Security Project: Electronic Incident Reporting System Online access.
Advertisements

Consignment Tracking System An Overview - Aron Bury - Ian Searle - Ian Storey.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
PulseHR Time and Attendance software development and coding web development, web hosting IT project management and consulting Str. Ghioceilor.
WkTOPIC(S) 1 Overview of computer system 2 Data and Information 3 Computing Device I (pre computer age to 19 th century) 4 Computing Device I (pre computer.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
Computers They're Not Magic! (for the most part)‏ Adapted from Ryan Moore.
1 By Nigel Zeinert IED Communications Over LAN/WAN.
Systems Software Operating Systems.
LabView Users Group Meeting June 20 th, 2006 Process Control Using Compact Field Point/Labview Real-time Michael Tockstein Microelectronics Technology.
BY Zoher & Mahmoud. What is WAMP?  - Acronym for Windows/Apache/MySQL/PHP, Python, (and/or) PERL  - WAMP refers to a set of free open source applications,
By Jeerarat Boonyanit. As you can see I have chosen Cpanel for my server management tool. cPanel is a Linux based web hosting control panel that provides.
TOPIC 1 – SERVER SIDE APPLICATIONS IFS 234 – SERVER SIDE APPLICATION DEVELOPMENT.
CYPRESS PNSQC (15-17 Oct. 2001) 1 Testing a Bluetooth Product With Web and Embedded Software Rick Clements cypress.com Cypress Semiconductors 9125.
Windows Server MIS 424 Professor Sandvig. Overview Role of servers Performance Requirements Server Hardware Software Windows Server IIS.
N-ABELD- NEW ARDUINO BASED ELECTRONIC LIQUOR DISPENSER Don Doty Eastern Kentucky University.
University of Bergen public domain software: SEISLOG Linux, data-acquisition system for standard PC and embedded lowcost, low-power solutions Terje Utheim.
A modern NM registration system capable of sending data to the NMDB Helen Mavromichalaki - Christos Sarlanis NKUA TEAM National & Kapodistrian University.
REAL ESTATE INVENTORY SYSTEM Training Seminar - September 12, 2011, Bucharest, Romania Guidelines on how to work with the Promise System.
Overview Embedded Linux Graphics Typical desktop Linux graphics stack SystemRAMDisk X Window System5MB16MB GNOME14MB95MB KDE11MB96MB Mozilla12MB95MB.
DAQ Cards, or Instruments The purpose of this presentation is to familiarize new Lab View users to the different computer aided test recourses available.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
Implement An Online Management System for PBX Presented by: Bui Phuong Nhung Advisor: Dr. Wei, Chao-Huang.
Personal Computer Parts Open your web browser and using an online search engine, find and enter the name of the PC Part in the title box of each slide.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Introduction to Software Development. Systems Life Cycle Analysis  Collect and examine data  Analyze current system and data flow Design  Plan your.
Dec07-02: Prototype Parking Meter Phase 8 Bret Schuring: Team Leader Pooja Ramesh: Communications Wilson Kwong, Matt Swanson, Alex Wernli.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
REAL ESTATE INVENTORY SYSTEM Training Seminar - December 1, 2011 Tirana, Albania Guidelines on how to work with the Promise System.
Rick Conrad, Efrain Lopez III, Saeed Noori. What is Experience Sampling? Survey method People’s experiences Real-time Format Paper and Pencil Handheld.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
 Computer is an electronic tool that can accept, process, and accumulate data which can produce a result or output.  Computer System is a combination.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
Windows 7 WampServer 2.1 MySQL PHP 5.3 Script Apache Server User Record or Select Media Upload to Internet Return URL Forward URL Create.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
 To start using PHP, you can:  Find a web host with PHP and MySQL support  Install a web server on your own PC, and then install PHP and MySQL.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
“COLLEGE MANAGEMENT SYSTEM” Presented by: BCA VI SEMESTER.
Luz GUEVARA - Simon CHOLLET INGRID Database Proposal for Database.
Date : 11/01/16. Inspur Products X86 Server Storage System TS-K1 SmartRack Large enterprise application Mass storage Mission Critical application General.
Slow Control System at experiment D. Egorov Slow Control System at V. Shutov, D. Egorov, R. Nagdasev 1/15.
11 DEPLOYING AN UPDATE MANAGEMENT INFRASTRUCTURE Chapter 6.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Computer Hardware Introduction What’s inside that box?
sTGC production database design
Chapter 13 Web Application Infrastructure
APIC Systems AVI, Tracking Image, & Quality Alert System 2 TNG Training Presenter: Marcus Sternberg Last updated: 2007 Jan.
Setup for automated measurements (parametrization) of ASD2 chip
P-CART.
Software Overview Sonja Vrcic
Workshop JRA1- INFN Legnaro, 19/2005
ATF/ATF2 Control System
ATLAS MDT HV – LV Detector Control System (DCS)
Cloud based Open Source Backup/Restore Tool
Magnet Safety System for NA61/Shine
Kappa Sigma Management System
Component Tracking Use computer based tracking system
The IFR Online Detector Control at the BaBar experiment at SLAC
The IFR Online Detector Control at the BaBar experiment at SLAC
Single rate plateau curve with different gas mixture
Gas chromatography Software
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

Quality Control Infrastructure Use computer controlled instruments Minimize manual data entry Keep (complete) electronic record => a brief description of our plans => you will see most of it during the tour

Conceptual Overview WWW MySQL Database Barcode Scanner High Voltage Gas System

Software Tools The database is mySQL (3.23.54a-3.72) Hosted on a Linux PC Apache web server, php scripting language For web graphics we use jplib Support for database access from Linux and Windows Components (a.k.a Server) for our hardware devices including oscilloscope, barcode scanner, gas system, HV system…

Hardware Barcode Scanner Intermec 1802 Vista cordless ~$650 Gas System MKS 647 4ch. Readout/power supply RS – 232 interface max. flow 8000 sccm 3x MKS 1179 mass flow controller ~$8,500 R/C Measurement RS – 232 interface 1 pF resolution $100

High Voltage Options I CAEN SY 546 1 voltage per 12 ch. Individual current monitor No longer in production but maybe available from LVD/Gran Sasso 96 ch. per 4u crate A1303 CAENet controller ~$1200 Needs refurbishing Slow current monitor

High Voltage Options II OSU Design 1 voltage per 25-50 ch. Individual current monitor 50 ch. per 1u crate Built in Ethernet controller Fast current monitor

High Voltage Options II OSU Design 1 voltage per 25-50 ch. Individual current monitor 50 ch. per 1u crate Built in Ethernet controller Fast current monitor

High Voltage Options III $40 $50

Signal Shape and Plateau Curve Tektronics Scope with Ethernet Interface (Demo) Automatic plateau curve measurements Computer controls HV Monitors current Reads singles rates from counter (to be designed) +

Module Assembly I We plan to assemble the modules in Smith Lab. Severe space constraints (Tour)

Module Assembly II 4 Assembly Stations Source Scan Station Super Box (Tube storage in hallway)

Tube Handling (Baseline) Bring box to door Line up table Slide tubes onto scan table Line up scan table Slide tubes onto assembly station Reverse for complete modules

Tube Handling (Carrier) Super Box with tubes Tube Carrier Fixed to wall or floor In hallway

Tube Handling (Carrier)

Tube Handling (Carrier) Scan Table “J” Carrier Questions: Is this an acceptable solution? Can we do something similar for modules?