KFA10 status 20/05/2019 Currently:

Slides:



Advertisements
Similar presentations
SERIES RESISTOR CIRCUIT. THE EQUIVALENT SERIES RESISTANCE IS : Req = R 1 + R 2 + R 3 THE CURRENT OF THE CIRCUIT IS : I = U / (R 1 + R 2 + R 3 ) THE EQUIVALENT.
Advertisements

T1 status and plans INFN Genova November 2014 Collaboration Meeting.
MKDV switch faults November V. Mertens L. Ducimetière with H. Bartosik, G. Bellotto, C. Boucly, P. Burkel, E. Carlier, D. Comte, S. Huon,
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
AC circuit breaker with series connected switches George G Karady.
TS2-SPS & TS1-LHC. TS2-SPS (On Monday 15th of June for 24hrs) SPS – HW: Replacement of HV Switch PFN 7 MKP (Impact 65420) SW: « Smooth » upgrade in accordance.
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
Circuits Series and Parallel. Series Circuits Example: A 6.00 Ω resistor and a 3.00 Ω resistor are connected in series with a 12.0 V battery. Determine.
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
LIBD on LBDSmeeting Viliam Senaj 04/02/2014. MKB test MKB vacuum level satisfactory for beginning of HV test: – B1: between 3.1x10 -7 and 5.7x10 -7 (new.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Electric Circuit. SERIES CIRCUIT +- RARA RBRB In this Circuit, electric current has one path to flow (1) The current is same everywhere in the circuit.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Kicker generator and controls installation in ECA5? Etienne CARLIER
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Replacement of Obsolete/Old Hardware L. Ducimetière SPS Consolidation Review Luc Sermeus, Mike Barnes, Viliam Senaj, Thomas Kramer, Luis Feliciano, Vasco.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
Injection/Extraction Kicker CR Aleksey Kasaev BINP-FAIR-GSI workshop
2 BT.KFAs kicker rise time measurements (December 2015) L. Sermeus TE/ABT/FPS LIU-PSB meeting, 19 th January 2016.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
S A Griffiths CM42 June 2015 Electrical & Control.
Switching-Mode Regulators
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
Outcome of BI.DIS Fast Interlocks Peer Review
DRY RUNS 2015 Status and program of the Dry Runs in 2015
LKr status R. Fantechi.
Fast retrigger path What threshold level we need for the fast trigger path?
HV-Cables Current standard product is RG-220/U like cables from Draka. Limited to max. 40kV Not compatible for CPS SF6 gas filled PFL.
Pulsed Magnetic Measurements. Technical description.
EC Activities Status for the LIU
n_TOF “Draft” plans for YETS and LS2
prepared by R.A.Barlow 30/056/2016
Capacitive pick-up on MKP: why, when, who, resources, others
352MHz Klystron Control for the 3MeV Linac test stand
Check you understanding:
Modulators - Inductive adder. Technical description.
TE-MSC activities in SPS during YETS
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
ACS news Circulator TCU: control tests in progress All cavity racks
ELECTRICITY & MAGNETISM Kirchhoff’s Laws (P )
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Undulator Vacuum System
Status of Readout Boards
First Test of Piezo-Supplies
Undulator Vacuum System
ISRC and LEBT Vacuum System Design
Source Transformation
Resistors in Parallel Resistors connected at a single node pair
Resistors in Series Resistors connected at a single node
Status of the retriggering boxes and measurements
KFA10 status 03/06/2019 Currently:
Presentation transcript:

KFA10 status 20/05/2019 Currently: Install ion pumps (VSC) – done, pumping Install vacuum gauge (VSC) – done, need TPG (Luis wil check) Install SF6 circuit - ongoing Install entry boxes (KSC) – done Connect HV cables - this week

MKDV PFN and Switches status 20/05/2019 – VS, PvT, EC, LD Present test conditions: Magnet conditioning long pulse 38 kV Actions from sbdsPTM vs. nPTM review Produce two new sbdsPTM pre-series units  launched Optimise nPTM triggering circuit impedance  Diodes ordered, cable being prepared Define equivalent operation voltage for same SEB rate  done (Viliam) Reduce IPOC measurement noise at the beginning of the pulse  partially done (EC) Plan PFN front-cell optimisation  not ready Perform comparative eScan for both type of PTMs (06/2019)  not ready