Shaver Creek Permitting

Slides:



Advertisements
Similar presentations
NEW JERSEY DAM SAFETY RULES AND REGULATIONS. What is a dam? "Dam" means any artificial dike, levee or other barrier, together with appurtenant works,
Advertisements

U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
2008 Bridge Planning Seminar Design Data Drawing Layout.
Characteristics of High Gradient Streams
Culvert Inventory and Assessment Protocol 2015 Field Season.
Culvert Inventory and Assessment Protocol 2012 Field Season.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Lower Yellowstone River Diversion Dam Project – Phase II - Physical Modeling of the Rock Ramp BRT, COE, MTAO Update Meeting November 4, 2010.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
Rock Riffle Design Course
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-RAS.
NAACC Stream Crossing Survey. Field Form Page 1 Crossing Data & Structure 1 Data ~ 80% of surveys.
“We Bring Engineering to Life” 3-D Stream Restoration Design, Monitoring and Beyond David Bidelspach, PE - Stantec Consulting Greg Jennings, PE – NCSU.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
Urban Stream Restoration Case Studies: Challenges and Opportunities Alabama Water Resources Conference September 6-7, 2012 Greg Jennings, Darrell Westmoreland,
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Bureau of Watershed Management Regulatory Proposal Chapter 105 Dam Safety and Waterway Management February 21, 2007.
DESIGNING BENDWAY WEIRS
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Design Guidance for Low-water Crossing in Gravel Rivers Xing Fang Lamar University.
Basic Hydrology & Hydraulics: DES 601 Module 1 Introduction.
Basic Hydraulics: Culverts – I
Basic Hydraulics: Channels Analysis and design – I
This training was prepared by the U.S. Department of Agriculture (USDA) team of Otto Gonzalez-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Bitter Creek Stream Restoration Preliminary Engineering Report Neighborhood Meeting.
105 Updates and Top Challenges For SEPA RC&D Engineer’s Workshop Montgomery County Community College May 24, 2016.
Sustainable Vineyard Practices Replanting Strategies & Economics December 13, 2012 Conditional Waiver of Waste Discharge Requirements Vineyards in Napa.
Natural Riparian Resources Vegetation Landscape/Soil Water.
Models of the Earth Section 3 Section 3: Types of Maps Preview Key Ideas Topographic Maps Topographic Maps and Contour Lines Index Contour, Contour Interval,
Sinclair Wash Stream Restoration Feasibility Study
Bridges Reach analysis Fundamental tool for design
EFFECTIVE EROSION AND SEDIMENTATION CONTROLS FOR IN-CHANNEL PROJECTS
Assoc. Prof. Dr. Tarkan Erdik
Interaction between Riprap Layout and Contraction Scour from Vertical-Wall Bridge Abutments Supported by Shallow Foundations presented by Huang, C., Xie,
Mining and Reclamation Advisory Board
Environmentally sensitive areas
a design technique for achieving fish passage
Winter application worksheet
Brian murphy and Emily valenzuela
Road-Stream Interface:
Detention Pond and Channel Stabilization for Bartholomew Park
Using the JPA2 System JPA2 WebEX Presented by:
The shapes of stream channels
FEMA and Stream Restoration
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Iowa’s River Restoration Toolbox Level 1 / Base Training
Estler Lake Dam Rehabilitation
Environmentally sensitive areas
Module # 16 Restoring Functions to Streams Through Design
Journal #3 Describe your observations in yesterday’s lab
Flooding Surrounding the Addicks Reservoir during Hurricane Harvey
Longitudinal Profile Survey for Successful Culvert Replacement
Scour Analysis on the west fork of the Duchesne River
Stream Crossing Replacement Policy
Baffles – Structures - Spans
In-Stream Structures & Grade Control
Presentation transcript:

Shaver Creek Permitting

Details Existing ~6’ squash pipe Bankfull ~14 ft Watershed area ~840 acres ~5% stream slope, ~3% pipe slope Permit required?? Requires GP-11 Downstream scour pool Upstream sediment wedge

Initial Survey (May 2018) Detailed engineering survey ~400’ downstream and 400’ upstream Wetlands delineation completed

Structure Selection Where will you do the work?? How to reconnect the stream bed? Cover height? Slope? Sour depth? Bottom? No bottom? Span ~15’ Buried 3 ft

Span ~15’ Buried 3 ft

Upstream Work

Log Cross Vane

Other Documentation

Then… Submitted November 13, 2018 First DEP response February 25, 2019

DEP Response

Incomplete Elements (13) Provide color photographs and a map depicting the proposed activity areas. Provide a cross section of the proposed culvert depicting the existing and proposed conditions, stream bed, normal water surface, and culverts. Provide plans and details for the proposed culvert depicting the size, opening, footers, bottom. Revise the arch culvert design to include construction of a normal and low flow channel through the structure which does not over­widen the stream channel. Provide a wetland determination and delineation report with data sheets.

Incomplete Elements Other elements??? Provide a project description which identifies and describes the purpose of the proposed channel changes upstream and downstream, how these changes affect the overall stream channel stability and slope, and why this is appropriate and stable for the stream channel. Identify and provide specific details on the material placed in the downstream channel elevation increase to raise the stream bed. Provide measures to ensure that the stream bed downstream of the culvert does not scour and erode. Other elements???

Then… Revisions Submitted March 4, 2019 DEP Approval March 20, 2019

Permit approval

Permit Waivers Watersheds <100 acres No wetlands involved Still must follow all GP provisions and do E&S ~60 acre watershed

Want a Waiver Letter? Filled out GP registration and signature page PNDI – environmental review Existing Conditions survey Wetlands delineation Watershed delineation and area Photos – upstream and downstream

Questions?