API 17P TASK GROUP June 26, 2013
BACKGROUND NWI Initiated in 2006 API 17 P / ISO 13628-15 new recommended practice Effort is being led by API task group Draft relied heavily on specifications from a number of operators
SCOPE production and injection manifolds modular and integrated single satellite and multiwell templates subsea processing and subsea boosting stations flowline riser bases and export riser bases (FRB, ERB) pipeline end manifolds (PLEM) pipeline end terminations (PLET) T- and Y-connections subsea isolation valve (SSIV) subsea controls and distribution structures other subsea structures protection structures associated with the above.
TASK GROUP Name Company E-mail Charles White BG Norge Charles.white@bg-group.com Victor Vargas FMC victor.vargas@fmcti.com Jeff Whipple INTEC Engineering jeffrey.whipple@intec.com Eric Baltmanis ExxonMobil eric.j.baltmanis@exxonmobil.com Kim Dyson kim.dyson@intec.com Chad Hughs Chevron WHCI@chevron.com Matthew Herrold BP Matthew.Herrold@bp.com Ron Pfluger Cameron ron.pfluger@C-A-M.com Jon Stienar Knutsen Statoil/Hydro jonsk@statoilHydro.com Anders Husby DnV Anders.Husby@dnv.com
TASK GROUP Name Company E-mail Eric Hevle Nexen eric_hevle@nexen.com Marcelo Luiz Ligeiro Barbosa Petrobras marceloligeiro@petrobras.com.br Roberto Martins FMC roberto.martins@fmcti.com Maxwell Brandão de Cerqueira maxwellbc@petrobras.com.br Frederico Nicoletti Subsea 7 frederico.nicoletti@subsea7.com
CURRENT STATUS Committee Draft version has been competed and passed Completed April 2009 24 pages of comments Draft International Standard version was sent to technical writer for final formatting Draft International Standard version has been competed and accepted Completed March 2010 26 pages of comments (all have been addressed) Structural steel section added (updated) Final Draft International Standard version has been competed and submitted for Ballot
CURRENT STATUS API adopt back ballot closed November 22, 2011 Result of FDIS ballot was approved Q3 2011 ISO 13628-15 has been released API adopt back ballot closed November 22, 2011 15 affirmative votes 2 negative votes (1 operator, 1 hardware supplier) 3 technical comments API recirculation ballot opened August 29, 2012
CURRENT STATUS API recirculation ballot closed September 26, 2012 (affirmed) 14 affirmative votes 5 negative votes Document has been published with editorial comments included API 17 P 1st edition published Jan 30, 2013
NEXT STEPS Start next revision Major work in clause 7 (materials) Reconsider comments from adopt back ballot
OPEN ISSUES Need new work item for next revision