2019 Fueling Stations Upgrade Bloomington, Orono (& CHS) – Best Price

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Certification of Compliance By Evita Lagard
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Petroleum Equipment Institute
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
Contractor Safety Training] Contractor Safety Training What's New – What's Hot.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
ESTIMATING By Laith Jacob.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Process Engineer’s Role in Project Management Dr Abdullah Malik.
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
2016 Contractor Safety Training What's New – What's Hot.
Presented by: CCSD Procurement Services Department How to do Business with the Cobb County School District 1.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Leads Institute of Technology & Engineering
Infrastructure Revitalization Project
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
Director’s Progress Review Closeout Meeting
Foundation – jay Desai.
+ WHY KNOWIFY MAKES SENSE FOR GAF FACTORY-CERTIFIED CONTRACTORS
Overview of MSBA Building Process and Project Timeline
Pre-Bid/Proposal Meeting
Overview of MSBA Building Process and Project Timeline
Sun City Lift Station Odor Control Improvements
5th Street Bridge Replacement Project Contract No
New Install Proposed rule changes
Operations Update 15 November 2012
PRE-PROPOSAL MEETING, January 16, 2018 Contract No.:
9/18/2018 Bids CONTRACTING Khamis…..
Designers’ Manual Appendix Contents
Pinole-Hercules Water Pollution Control Plant Upgrade Project
System Lock Out/Tag Out and Line Breaking GSS24
Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective – 1/11/2017.
SAP ECC Upgrade Sunday Monday Tuesday Wednesday Thursday Friday
MANDATORY PRE-BID MEETING
Director’s Progress Review Closeout Meeting
Meeting of the LCLS Facilities Advisory Committee
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
NEW COMPLIANCE REGULATIONS
You must log in using both you address and your Full name before proceeding
Workplace Exam Rule CFR 56/ Informational Webcast
Far Experimental Hall Hutches Civil Construction
Installation Binder / IRR – an example
TOWN OF PALM BEACH ELECTRONIC SOLICITATION SYSTEM
Project Aerial Site Plan
Construction Considerations
Fueling the Future of the Fairbanks North Star Borough
TOWN OF PALM BEACH ELECTRONIC SOLICITATION SYSTEM
Learn about bidding the Facility Services Targeted Small Business Enterprise Tier 2 Program Welcome Confirm who is doing the speaking for each slide……
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Lafayette Airport Commission New Terminal Program Update
Presentation transcript:

2019 Fueling Stations Upgrade Bloomington, Orono (& CHS) – Best Price Later in 2019, a separate Best Value bid request will be published for Summer 2020 work on remaining sites Equipment procurement and install + contamination reclamation included

Sign-in sheet for pre-bid on Monday, August 19th at 10:30am Note for GC: • Last day for questions: Tuesday, August 20th • Issuance of Addendum (if needed) UNTIL: Thursday, August 22nd At least 4 days of “no activity” on Project’s HC Business site • GC Bid due date: 2pm, Tuesday, August 27th. PO issue date TBD UG Tanks at Bloomington – installed under a separate bid – due 8/16; deliv 9/25 ! DEF Tanks Bloomington + Orono – installed under a separate bid; due 8/19; deliv 10/15 Construction Compliance Manager: Tina Sanz, Tina.Sanz@hennepin.us • Small Business Participation (SBE) goal is 17% - The goal will be listed in Section 00 22 13 – Supplementary Instructions to Bidders and more information is in the AIA A701 document, Article 14. • Workforce Entry Program (WEP) goal is 54 hours – These are apprentice hours and information is listed in Section 00 22 13 – Supplementary Instructions to Bidders. • Affirmative Action goals: 32% minority and 20% women – This information is in both the A701 and A201 – the corrected 20% women goal is in Section 00 73 00 – Supplementary Condtions. All Questions regarding (SBE, WEP, AA) goals should be directed to Tina Sanz @ tina.sanz@hennepin.us.

Project Summary: At Bloomington FS – Procure canopy, Submersible Pump, Valves along with all the material needed for satisfactory refurbishment of fueling station (fuel tanks and DEF tanks are being procured directly by County due to lead time and tight schedule); and needed fill material; Remove old dispenser, fuel tanks, cables and conduits, dispose-off old fuel tanks; and contaminated soil; prepare site for new tanks, electrical, control wiring and canopy, remediate soil as needed and add needed back fill – all, per County’s Engineer KFI Eng. (this includes services of Terracon – Environmental Eng. and of Pierce Pini & Assoc., Civil Eng.) directions; coordinate with fuel tank installer for timely installation of new UG Fuel tanks (1 Gas and 1 Diesel), install submersible pumps, valves, sensors; and piping, complete needed wiring and satisfactorily test UG tanks, finish remainder soil work and pour canopy foundation, concrete slab and island; rebuild affected blacktop road, finish remainder wiring, reinstall fuel dispensers and card reader; satisfactorily test to confirm their function, coordinate with DEF tank installer for timely installation of tanks, complete remainder wiring and satisfactorily test Card reader and Veeder Root function on DEF tanks; install Canopy with integrated lights and camera; ensure all equipment warrantees are satisfactorily transferred to the County, provide needed progress updates and construction documents per the Engineer, for full set of As Built Drawings and Manuals; provide adequate equipment, materials procurement schedule and crew availability to ensure Project Completion (handover to CMED Operations) by October 15 with assumptions of Fall weather events. Note maintenance facility will be in service; plan on bringing a portable toilet, coordinate with County two weeks in advance of mobilization to set up temporary building access for the crew; store equipment and material in designated areas and secure all items as the facility is unmanned. At Orono FS – Similar to that at Bloomington except UG Fuel tanks will stay in place and no soil remediation or excavation is needed. This is a short project and needs to be completed by end of October At CHS (Optional work, to be requested by the County, after reviewing quotes and budget)– Similar to above, except a 4000 Gasoline Tank is to be excavated and disposed-off, along with affected soil (if any contamination is discovered); backfill with clean dirt and cap with concrete pad with one edge forming drainage ditch. This is a secure site so workers will need to undergo background clearance checks (2 weeks needed for it) and be under site supervision while on site. This is the shortest project (estimated construction time is 3 days) and if approved, is to be completed by mid-November. Engineering drawings and procurement scope of other contractors will be available to interested bidders responding to posted advertisement. Due to known leak detections at the site and very short project window, General Contractor must be able to document 5 or more years of underground tanks and Fuel Islands turnkey construction as well as 2 or more, soil remediation projects in the State of MN, must have current PCA license for fuel tanks installation (include license #s), 2 years of DEF tanks installation in MN like cold weather (include references).

70/22.4, @ ~ 8’, DRO 61.6, GRO 10.7, wet @ 20’ and somewhat wet @ 6’ Bloomington Soil Boring Results Leak # 185140 70/22.4, @ ~ 8’, DRO 61.6, GRO 10.7, wet @ 20’ and somewhat wet @ 6’ Negligible Negligible PID: 234 @ ~15’+, lower @ 20’ DRO 15.5 & GRO 5.5; wet @ 20’ and somewhat wet @ ~5’

Osseo Soil Boring Results PID Negligible; dry PID Negligible; dry PID Negligible; dry PID: Negligible; somewhat moist at top

CHS Soil Boring Results PID Negligible; dry DRO ~46 ppm