In-Delta Fish Screen Facilities

Slides:



Advertisements
Similar presentations
The Committee and Research – Where are we and where might we be going?
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Hinkley Point C: Consultation on Preferred Proposals – Presentation 1 Hinkley Point C: Proposed nuclear development Nigel Knee – Head of Nuclear Policy.
Lake Whetstone Sediment Removal by Hydraulic Dredging
Sovereign Waters Lake Management Plan Outcomes and Recommendations 9 May 2013.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Hydroelectric Relicensing in Vermont Brian Fitzgerald Vermont Agency of Natural Resources.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood.
Identify Problems, Planning Objectives and Constraints
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Distribution System Control Strategies.  Tank Management/Operations  Flushing  Rerouting Water  Others  optimizing existing booster chlorination.
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
Reducing the Threat of Fuel Release from the Red Hill Fuel Storage Facility A Unique Engineering Challenge.
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Types of Positive Barrier Screens  Rotary Drum  Fixed Vertical Plate  Vertical Traveling – belt and panel  Non-Vertical Fixed Plate  Horizontal Fixed.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
In-Delta Storage Program Engineering Investigations Control Structures Stakeholders Committee Meeting January 22, 2003 Jeremy Arrich.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
In-Delta Fish Screen Facilities Delta Wetlands Proposed Facilities and Basis for Re-Engineered Facilities.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
Potential Impacts of a Seawater Intake Structure and a Brine Disposal System for the Proposed Desalination Plant at Mile 6, Swakopmund Marine Ecological.
00/2015 Public Information Centre Addendum to the Environmental Study Report: Millbrook Dam Tuesday, October 20, 2015.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
CE 3372 Water Systems Design
Changes to the 1995 Water Quality Control Plan Program of Implementation Presented by: Steve Ford Department of Water Resources.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical Components July 26, 2012 John Carrigan MassDEP Northeast Regional Office.
Touchet Consolidation Washington Department of Fish and Wildlife.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
1 Introduction to Ecological Re-Use Concepts: ITRC Technical and Regulatory Guidance Document 2006 Brownfields Conference Boston, Massachusetts Charles.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
In-Delta Storage Program Environmental Evaluations Stakeholders Committee Meeting January 22, 2003 Leslie Pierce.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
William Burton Fred Kelley Versar, Inc Rumsey Road
Bridges Reach analysis Fundamental tool for design
EFFECTIVE EROSION AND SEDIMENTATION CONTROLS FOR IN-CHANNEL PROJECTS
Assoc. Prof. Dr. Tarkan Erdik
Niagara River Area of Concern
L-9 Sewage Pumping Environmental Engineering-II.
4th Annual Construction Law Summit
South Padre Island, 3-4 Nov/2016
In-Delta Storage Program
Issue 4b - Addressing Local Degradation -
HAZOP Guidewords Base Set
3.1Process selection and the treatment process train
Hydraulic Fracturing Best Management Practices Comments and Considerations Presented By: Michael E. Parker, P.E. Parker Environmental and Consulting, LLC.
In-Delta Storage Program
In-Delta Storage Program Engineering Investigations Control Structures Stakeholders Committee Meeting January 22, 2003 Jeremy Arrich.
Carlsbad and Huntington Beach Seawater Desalination Facilities
Presentation transcript:

In-Delta Fish Screen Facilities Delta Wetlands Proposed Facilities and Basis for Re-Engineered Facilities

Webb Tract Diversions and Discharges

Bacon Island Diversions and Discharges Now Two Main Locations Re-engineered

Diversion Plan and Elevation - 5/10/01 Booster Pumps Located on New Levee Section Fish Screen

Proposed Fish Screen - 86 cfs each max. Hinged Pipe to Remove Screen when not in Use No Cleaning System

Some Existing Siphons to be Screened, but Contribution is Unclear Habitat Islands = 200 cfs (existing water right) Webb Tract = 4500 cfs 32 New Siphons/Pumps = 2750 cfs 7 Existing Siphons = 1750 cfs (or 250 cfs each???) Bacon Island = 4500 cfs 28 Existing Siphons = 1750 cfs (or 62 cfs each??) ??? Typical Siphons are in the 10 -20 cfs max range…They are not proposed to be enlarged

DW Proposed Design Issues/Problems Intake Screen Unproven at this Scale Fish Screen Criteria Not Met Screen Structure and Support Inadequate Hinge, Screen, Piling, Bracing, Etc. Pipe/Pump Hydraulic Issues Settlement Impacts Levee Stability Impacts Erosion Cyclic Loads and Fatigue Retrofit of Existing Siphons Uncertain

Operations and Maintenance Issues Manual Cleaning is Inadequate Sedimentation and Dredging Corrosion Potential and Cathotic Protection Poor Access to Screens (cranes, boats) Difficult Underwater Inspection Settlement Monitoring and Adjustment Flow Monitoring and Data Collection Starting the Siphon Pump Maintenance

Hinge Design Loads and Fatigue

Cleaning System Failure Andreotti Fish Screen 9/98

Material Selection Considerations

Potential Environmental Issues of DW Alternative Fish Predation Larval Fish Loss Recreation/Boating Limitations Aesthetics Pump Noise Evaluation Facilities Needed Maintenance Activities Construction Impacts Water Quality at Discharge Stations

Uncertain Retrofit of Existing Facilities for Screening Old Siphon Pipe Adequacy Electrical Requirements for Automation Site Issues Structural Adequacy

Siphon Screen Example Horseshoe Bend (30 cfs)

Fish Screen Criteria Drove Alternative Facilities Design at Intake Site Screen area inadequate for manual cleaning Screen mesh is too large Screens over 40 cfs subject to hydraulic uniformity and siting criteria Not a “Distributed Intake” concept

Potential Benefits of Re-Engineered Consolidated Facility Operations Maintenance Structural Integrity Hydraulic Improvements

Example of Consolidated Facility CCWD Los Vaqueros Intake Old River Pump Station

Example of Consolidated Facility RD108 830 cfs Sac. River