LHC An LHC OP guide… under construction J. Wenninger

Slides:



Advertisements
Similar presentations
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
Advertisements

DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Microscope Control Configuration This section of the QED manual will describe how to configure you Configure and Control your automated microscope. Mac.
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
LHC LHC Wire Scanner Application Manual oOverview: 1 M. Kuhn - 12/03/2015.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
LHC orbit system, performance and stability LHC Beam commissioning workshop, Evian, 19./20. Jan 2010 Kajetan Fuchsberger Thanks for Help and discussion:
June 2006LHCCWG / J. Wenninger1 Orbit response measurements and analysis J. Wenninger AB-OP Principle Software status Example from SPS ring and lines Potential.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
First Ideas – New Wire Scanner GUI - LHC V. Kain, G. Crockford, M. Kuhn Emittance Working Group 6/26/
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
LHC RT feedback(s) CO Viewpoint Kris Kostro, AB/CO/FC.
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
A Primer on Beam Steering
Fabio Follin Delphine Jacquet For the LHC operation team
LCLS Commissioning & Operations High Level Software
Weiming Guo Accelerator Physics Group / ASD Advanced Photon Source
A monitoring system for the beam-based feedbacks in the LHC
2007 IEEE Nuclear Science Symposium (NSS)
J. Wenninger AB-OP-SPS for the non-dormant AB feedback team,
Orbit Response Matrix Analysis
LHC Commissioning with Beam
Steering algorithm experience at CTF3
Beam Steering Tools ‘Slow’ Steering Orbit feedback Status & plans
MD2036: UFO dynamics studies and UFO fast detection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC wire scanners status
Summary of week 7 Hardware Commissioning:
Operational Issues L. Ponce.
LCLS Commissioning & Operations High Level Software
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Real-time orbit the LHC
Thursday morning – optics correction
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
TT20 MDs for the NA61/SHINE fragmented beam experiment
Week 35 – Technical Stop and Restart
Thursday :00: Physics fill from the night shift
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
LHC Closed Orbit For Beam 2
Saturday 7th May Sat – Sun night
Orbit Feedback / Chamonix 03 / J. Wenninger
Machine Tolerances in Cleaning Insertions
Aims for the week Recover from technical stop and precycle at 10A/s
Orbit response measurements and analysis
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
OCELOT orbit correction and optimizer
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Quadrupole error localization using Response Fits
Orbit Bumps in PEP-II to Maximize Luminosity
TI8 analysis / J. Wenninger
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Friday 28 October 2011.
Wednesday 23/2 Thanks CRYO!!!.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Feedbacks & Stabilization Getting them going
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Steering @ LHC An LHC OP guide… under construction J. Wenninger 10/17/2019 YASP@LHC

Acquisition Modes - Trajectory First turn acquisition as activated by selecting the ‘Fturn’ option. There are 2 acquisition modes: FIFO (Fist In First Out) is a self triggered mode that is used for threading of for trajectory measurement with an empty ring. It relies on injection of a single bunch. CAPTURE is a triggered mode where the bunches/buckets must be configured via the sequencer or the multi-turn application. This mode only works once all BPMs have been timed in (bunch number). 10/17/2019 YASP@LHC

Acquisition Modes – Closed Orbit Closed orbit acquisition as activated by selecting the ‘Orbit’ option. There are 3 acquisition modes: 1Hz: one orbit (averaged over 224 turns/20 ms) is returned at 1 Hz. Average-1Second: all orbits acquired during one second are averaged. Data is returned at 1 Hz. Average-10Second: all orbits acquired during 10 seconds are averaged. Data is returned at 0.1 Hz. 10/17/2019 YASP@LHC

Corrector Settings The settings of the correctors (CODs) used for steering may be obtained from 2 sources: The LSA DB (settings associated to the selected actual BP). The kicks are only correct if the Orbit FB is OFF, no real time corrections are present in the FGC and when the machine is static (i.e. not in ramp and squeeze). The Orbit Feedback Controller (OFC). The kicks are reconstructed in real time from the MEASURED currents of the CODs. When the Orbit FB is active, only option 2/ will give the correct state of the correctors. No item checked: no settings are acquired (all kicks are 0). ‘Read CODs’ checked (default): settings from LSA DB (1.) Both items checked: settings from OFC (2.) 10/17/2019 YASP@LHC

Threading (1) The first operation after a shutdown is to establish a closed orbit. Because of the size of the LHC and the alignment tolerances, the beam will not circulate immediately, but be lost along the circumference. Threading consists in establishing the first turn step by step by correcting the trajectory with a few orbit corrector in each step. 10/17/2019 YASP@LHC

Threading (2) Threading is best done with the MICADO algorithm, using between 1 and 3 correctors at the time (per plane). In some cases MICADO may return an error with a ‘suspicious’ corrector: in that case one can reduced the number of correctors or disable the corrector manually. Select the beam you are threading to reduce the numerical complexity Matrix Reconditioning will attempt to filter out correctors that may the source of numerical singularities. 10/17/2019 YASP@LHC

From FT to CO (1) Once the first turn(s) has(ve) been established, it may be necessary to perform further correction to obtain a closed orbit. This is best done by averaging the first N good turns (N >= 3, ‘estimate’ for the closed orbit) and then applying a MICADO correction on the resulting average as if it was a closed orbit. >> ‘Machine Specials’ menu, option ‘Multiple Injection Turns’ 10/17/2019 YASP@LHC

From FT to CO (2) Select the N first good turns (N >= 3) and click on ‘Average’. This will build an averaged data set from the selected turns. Then go to the ‘Steering’ menu, select ‘General Steering’, MICADO. Apply MICADO with some correctors (10-20), send in steps (~20-30%) and observe if the new acquisitions improve the situation. Watch the tune !! 10/17/2019 YASP@LHC

Status Control The ‘Status Control’ menu gives access to a variety of tools to enable-disable monitors and correctors. For the LHC special options are available to deselect the BPMs or the CODs of one plane. One option allows to deselect all common (region) correctors that affect both beams at the same time. 10/17/2019 YASP@LHC

Reload of Settings (1) To reload ‘old’ (or just different) corrector settings to the HW. Select a dataset and load it into the display. The reload function will only act on the dataset+settings that are in the display. I recommend to stop any acquisition during this operation. Example: for the 2010 startup one could reuse settings from Nov. 2009 before the MCBX correctors were used. From the ‘File’ menu, select ‘Data Set Catalog’. Choose the entry from 28-Nov-2009 at 17:56, click on ‘Load Entry’. 10/17/2019 YASP@LHC

Reload of Settings (2) From the ‘TRIM’ menu, select ‘Settings Reload’. Select the plane, and click on ‘Prepare settings’. The present LSA DB settings will be retrieved and compared to the data that is in the display. The difference will be calculated and presented as a correction…. 10/17/2019 YASP@LHC

Reload of Settings (3) The corrector settings will be presented as a correction : before (what is in the DB), difference (settings to reload – DB), after (settings to reload). You can now trim like any other correction. You can even send it step by step if you want to be sure… 10/17/2019 YASP@LHC

Aperture limits (1) In the dataviewer there is now a new view (1 per beam) where the BPM data is plotted together with the aperture and the beam envelope. 10/17/2019 YASP@LHC

Aperture limits (2) Zoom into the region of interest to see something... Parameters for the envelope: g, the normalized emittance (mm) and the no. of sigmas that are plotted. 10/17/2019 YASP@LHC

Aperture limits (3) To set the emittance and no. sigmas for the plot, select ‘Emittance Setup’ in the ‘Optics and Model’ menu. 10/17/2019 YASP@LHC