SPS Planning meeting for LS2 #25 Vacuum sectors status

Slides:



Advertisements
Similar presentations
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Advertisements

LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
SPS DAY Aperture History 01/19/2016 Stéphane Cettour Cavé.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Insertion of 2 MBB with new coated vacuum chambers during technical stop week 35 J. Bauche for the SPSU study group, 24 June 2010.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Electrial Safety LS2 days November 2016 AP
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
Magnet activities in SPS during EYETS
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
SPS-FIRE The SPS Fire Safety Project Planning Status
YETS & LS2 Works EN-EL / Power distribution
SPS LS1 Planning meeting (N019) 04/09/13
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
YETS & LS2 Works EN-El on LHC / Power distribution
TE-MSC activities in SPS during LS2
BA6 – crab cavity activities in EYETS
K. Foraz on behalf of OSS members
SPS - EYETS 2016/17 Vacuum systems planning
LIU–PLI report LIU SPS meeting.
EN 4946 – Refurbishment of Electrical Substations
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
Status with crucial LSS5 kicker transmission line cables
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
BLM planning 03/03/2014.
Typical NC in Warm Modules Following X-ray campaign
LS1 status 17/03/2014.
Industrialization & The Gilded Age
LHC installation status
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 09/01/2019.
SPS Planning meeting for LS2 #19 Vacuum sectors & Magnet campaign situation Antonio Grande EN-ACE 06-Mar-2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS Planning meeting for LS2 #18 Vacuum sectors situation
SPS Planning meeting for LS2 #16 Vacuum sectors situation
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
Being a Moderator.
LS3 Study & Readiness Meetings
LIU-SPS review for BI (no BWS)
MQXF-11T Integrated Schedule
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)
SPS Planning meeting for LS2 #26 Vacuum sectors status
Warm-Up Look over your vocabulary terms on your flipbook and your properties in your notebook. Be sure to keep these out on your desk for the activity.
Presentation transcript:

SPS Planning meeting for LS2 #25 Vacuum sectors status Antonio Grande EN-ACE 12-June-2019

Documents Schematic view file:///G:/Departments/EN/Groups/ACE/OSS/Estrella/Schematic%20view/SPS_Schematic_View/SVG_SPS.svg 10/11/2019 Antonio Grande EN-ACE

Open point Arc 1- Arc 1+ Arc 2- LSS2 Arc 2+ Arc 3- Arc 3+ Arc 4- BA 4+: Qjack campaign Week # 22 23 24 25 26 27 28 29 30 31 32 Paul asked for the possibility of advancing the works of BA4+ Qjack activities cannot be done while the cabling is performed Other points should be done before to be ahead of aC coating campaigns Jacks Arc 1- Arc 1+ aC & IR Arc 2- Cabling LSS2 Arc 2+ Arc 3- Arc 3+ Arc 4- Arc 4+ Arc 5- Arc 5+ 10/11/2019 Antonio Grande EN-ACE

Open point conclusion Arc 1- Arc 1+ Arc 2- LSS2 Arc 2+ Arc 3- Arc 3+ BA 4+: Qjack campaign Week # 22 23 24 25 26 27 28 29 30 31 32 In BA4+ there are other activities which will keep open the sectors even if Qjack activities are advanced BA4+ sectors are currently under vacuum (UHV/primary) It’s the same to advance the works in terms of closing the vacuum sectors Jacks Arc 1- Arc 1+ aC & IR Arc 2- Cabling LSS2 Arc 2+ Arc 3- Arc 3+ Arc 4- Arc 4+ Arc 5- Arc 5+ 10/11/2019 Antonio Grande EN-ACE

Follow up Qjacks’ campaign At 7th June: 11 of 14 positions were done The 3 other positions1 position in BA3- extracted (MBB30870) 1 was done yesterday at the end of BA2+ to allow the SSS removal for aCcoating (+ 1 position in BA3-) 2 finished while aCcoating removal activities have started (today) with aC-coating 10/11/2019 Antonio Grande EN-ACE

Vacuum sectors dashboard - Opening Opened/Scheduled Next 2 weeks 48/35 3 Week 24 10/11/2019 Antonio Grande EN-ACE

Vacuum sectors dashboard - Closing Closed/Scheduled Next 2 weeks 11/9 7 Week 24 10/11/2019 Antonio Grande EN-ACE

Forecast for the next 3 weeks – LSS1 SPS 24 25 26 27 Week # Dismantling of the dump 11th June (w24): transport of TIDVG 10/11/2019 Antonio Grande EN-ACE

Forecast for the next 3 weeks – LSS2 SPS 22 23 24 25 Dismantling of ZS Vacuum consolidation / maintenance 10/11/2019 Antonio Grande EN-ACE

Forecast for the next 3 weeks – Arcs SPS aC & IR Magnets 2+ 3- Arc 3+ will be definitely closed in next month If you have any other activity there, please inform us 10/11/2019 Antonio Grande EN-ACE

Forecast for the next 3 weeks – Arcs SPS Magnets Vacuum tasks Vacuum tasks 50% 50% 10/11/2019 Antonio Grande EN-ACE

Passage restriction status DRAFT BA4 Cabling Magnet campaign BA6 – LSS6 Sprinklers (…) RF restriction Restricted Possible punctual restrictions in passage No restriction foreseen 10/11/2019 Antonio Grande EN-ACE

All comments are more than welcome but please let me know by mail Thank you