SAME 15 existing quadrupoles (QFS, QDS, QFL)

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Integration study of dipole corrector (for the MB Quad of CLIC Module) A.Samoshkin, M. Modena (CTC, 06-Apr-2010) 1.
Marion White Magnets & Supports April 16, 2007 Undulator Magnets and Supports Status.
M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A. Aloev, E. Solodko, P. Thonet, A. Vorozhtsov “CLIC magnets developments” “CLIC Project.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Procurement status of SR main magnets Attilio Milanese 23 Nov
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Collaboration with Normal Conducting Magnet section
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
Workshop on Field Quality March 2003D. Tommasini MAIN STEPS OF CERN WORKS STEPACTIVITIES/CHECKS CM ReceptionVisual insp. & unloading, electrical.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Sale of material salvaged from the LEP experiments 4 large experiments ALEPH DELPHI L3 OPAL The 4 detectors are situated in caverns (100 m under ground.
Linac4 MAC 29 th January 2008 Thomas Zickler AT/MCS/MNC/tz 1 Magnets for Linac4 Th. Zickler CERN Linac4 Machine Advisory Committee 28 th - 30 th January.
ELENA installation progress F. Butin / ELENA collaboration.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
New Magnet Design for FCC- ee Attilio Milanese, CERN 26 Oct presented by Frank Zimmermann.
East Hall under construction
High energy beam transport.
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
Status of pre-production at TESLA
11 T Dipole Integration & Plans M. Karppinen
Arithmetic and Geometric Means
CSP 25th November 2010 Technical agreement number 3: overview
6th BINP-FAIR-GSI Workshop,
HO Corrector Magnets: decapole test and future plans
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Transfer lines status 10/11/2016 O.Crespo-Lopez.
EFREMOV INSTITUTE SAINT PETERSBURG RUSSIA
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Arc magnet designs Attilio Milanese 13 Oct. 2016
ELENA electron cooler and SEM grids status
On behalf of the Accelerator Project Phase II Team
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
HO Corrector Magnets: decapole test and future plans
Procurement of Nb3Sn strand for coils assembled at CERN
10/month is the present production rate 2 FTE + sporadic contributions
Industrialization of previous projects
Page Headline Splitters.
ELENA Magnet Installation Planning
Grade one First term Second term Learning unit Learning unit
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
RPC Readiness for installation
Elettra Sincrotrone Trieste
LCLS Undulator System Status and Schedule
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
LCLS Undulator System Status and Schedule
HEBT Magnets beyond Batch2&3
Global Overview EA Deliverables for East Area Renovation
Aziz AMAMOU EACM – 21th May 2019
EA Magnets Supports for East Area Renovation
EN-EA Magnets Supports Overview (for East Area Renovation)
PS magnet status D Bodart 25/06/2019.
M. Modena, CLIC Stabilization Day # 10, 14 September 2010
SPS Planning meeting for LS2 #26 Vacuum sectors status
Presentation transcript:

East Area Renovation - Magnets: status June 2019- Roberto Lopez & Jaime Renedo Anglada 28 June 2019

SAME 15 existing quadrupoles (QFS, QDS, QFL) Magnet renovation shared with TT2 magnets Type Quantity Completed Scheduled QFS 8+1 - QFL 3+1 QDS 4+1 3+2 in Magn. Meas. 2019 SAME

Four new quadrupole designs Type Quantity Status Scheduled Q74 L 1+1 Yoke under construction at (CERN) Coils ongoing (ANTEC) 3rd quarter 2019 Q120 C 5+1 First magnet delivered to CERN this week For magnetic geometrical measurement ONLY Q100 L Q200 L 5 Visit to TESLA 28-29 May. 1st Q100 should be finished by middle of July and 1st Q200 by end of July. 1st quarter 2020 SAME

Two new bending designs Type Quantity Status Scheduled M100 L M200 L Assembly 2 6 8 Both M100 have been accepted 3 M200 have been accepted, 3 are ongoing 4 by CERN and 4 by Nortemecanica 4th quarter 2019 2nd quarter 2020 MCB 7+1 5 finished, 2 ongoing 3rd quarter 2019 SAME

12 dipole correctors: half to be built, half to be converted into laminated units Type Quantity Status Scheduled CR200 4+1 First magnet delivered to CERN. Electrical tests ok but not mechanical. Magnet will be sent back to CNE today 4th quarter 2019 MDX L 8+1 1st yoke delivered to CERN, as the CR200 it will be sent back. CERN coils ready

Magnetic measurements: status All magnetic measurement requests done and accepted Planning of the activities and assignation of the available resources has been done Ongoing activities Dynamic measurements of the QDS: estimation of the delay of the field with respect to the current MCB double powering test (dynamic response): converters are in place and the magnet transport request done

Dismantling

CR200

MDX L yoke

M100 L Actual massive New laminated