Draft Environmental Impact Report

Slides:



Advertisements
Similar presentations
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Advertisements

Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Sacramento Local Agency Formation Commission (LAFCo) Draft Environmental Impact Report SMUD Amendment of the Sphere of Influence and SMUD Yolo Annexation.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Sacramento Local Agency Formation Commission Peter Brundage, Executive Officer; Donald J. Lockhart, Assistant Executive Officer; Diane Thorpe, Commission.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
David Rizk, DirectorKevin Colin Development Services DepartmentLamphier-Gregory, EIR Consultant South Hayward BART/Mission Blvd Form-Based Code Draft Supplemental.
Placer LAFCO Municipal Service Review North Tahoe/Martis Valley Area Northstar CSD and PCWA.
Presentation to the Placer LAFCO Commission September 10, 2014.
Sacramento Local Agency Formation Commission (LAFCo) Incorporation and Annexation Process A Comparison November 1, 2005.
Annexations as a Means to Preserve Open Space October 29, 2009.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Prepared by: Alex Fisch Planning Services Division.
LPEA BAYFIELD SUBSTATION LA PLATA COUNTY LOCATION & EXTENT REVIEW March 12, 2015.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Joint Public Hearing - Closed Redevelopment Agency & City Council Amended and Restated Redevelopment Plan for the North Stockton Redevelopment Project.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
PCE Program Debrief Jim Eggemeyer, Director, Office of Sustainability Shawn Marshall, LEAN Energy US March 24, 2016.
FIRE PROTECTION CONTRACTS Workshop on Senate Bill 239 (Hertzberg) July 21, 2016 Nevada LAFCo – Presented by P. Scott Browne, Counsel.
BUDGET PROCESS & REVENUE & EXPENSE INFORMATION For FISCAL YEAR 2011.
May 14, Planning Commission Planning Commission May 14, 2015.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Jefferson County SA Red Rocks Site Approval
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
Providence Saint John’s Health Center Phase II Project
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
City of Los Angeles Department of Public Works Bureau of Engineering
Contra Costa Watershed Forum May 11, 2016
Springbrook Estates Sewer Improvement Area Informational Meeting
Overview What is the CEQA environmental review process?
Planning and Development Commission
Fifth Standard Solar Project Complex
City of Los Angeles Department of Public Works Bureau of Engineering
Commonwealth of Virginia
Joint City Council/Planning Commission Workshop June 12, 2007
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
UPDATE ON PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION
Exit Capacity Substitution and Revision
Agriculture - Open Space Preservation Policy Workshop
General Plan Amendment & Zone Change Timeline
Brackish Water Desalination Project Draft EIR
Final Environmental Impact Report
Chicago to Council Bluffs-Omaha
Dakota County Board Of Commissioners August 6, 2019
Sacramento Local Agency Formation Commission
Land Use Planning Community Workshop
Camarillo Springs Project Draft EIR Scoping Meeting
Incorporation and Annexation Process A Comparison November 1, 2005
UPDATE ON PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION
UPDATE ON PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION
Presentation transcript:

Draft Environmental Impact Report SMUD Amendment of the Sphere of Influence and SMUD Yolo Annexation Public Comment Meetings Davis: January 18 Woodland: January 25 West Sacramento: January 26 Sacramento LAFCo: February 1

Sacramento Local Agency Formation Commission Contact Information Peter Brundage Executive Officer Sacramento Local Agency Formation Commission 1112 I Street, Suite 100 Sacramento, CA 95814 (916) 874-6458 <peter.brundage@saclafco.org>

Meeting Agenda Introductions Meeting Process LAFCo Presentation Public Comments Closing Remarks

Public Comment Period Begins: January 6, 2006 Ends: February 21, 2006 (45 days) Comments must be received by 5 pm, Tuesday, February, 21st Written Comments and/or E-mail comments should be sent to Sacramento LAFCo, Attn: Peter Brundage <peter.brundage@saclafco.org> Responses to all comments will be included in the Final EIR

LAFCo Presentation Outline Program Description Chronology of Events LAFCo Authority/Decisions Purpose of the LAFCo Draft EIR LAFCo Process Schedule/Public Comment Period Program Components

LAFCo Presentation Outline SMUD Actions Draft EIR Analysis and Conclusions Potentially Significant Environmental Impacts No Impact or Less Than Significant Environmental Impacts EIR Mitigation Measures Best Management Practices and Mitigation Facilitated Questions and Comments Session

Program Description Amendment of the Sphere of Influence for the Sacramento Municipal Utility District (SMUD) Annexation by SMUD of the Cities of West Sacramento, Davis, and Woodland and Portions of Unincorporated Areas of Yolo County (approximately 212 square miles)

Chronology of Events In February of 2003, the Cities of West Sacramento, Davis and Woodland (Cities) along with Yolo County approached the SMUD Board of Directors to request an annexation study to determine whether SMUD electrical service could offer lower costs, better customer service and reliability, and increased citizen participation in energy related decisions In July of 2003, the three Cities, Yolo County and the SMUD Board agreed to fund an independent feasibility study to determine if annexation was financially and technically feasible

Chronology of Events In January of 2005, RW Beck released its feasibility study. The report stated there would be benefits to annexation for both existing SMUD customers and new Yolo customers On April 5th, 2005, the Cities and Yolo County requested that SMUD move forward with annexation On August 1, 2005, SMUD submitted an application to Sacramento LAFCo to expand its Sphere of Influence and to annex the Cities and portions of Yolo County between and surrounding the Cities

Chronology of Events As requested by LAFCo and required by law, the California Public Utilities Commission (CPUC) reviewed the proposed annexation. In November 2005, the CPUC issued an advisory resolution that stated: “The proposal by the Sacramento Municipal Utility District (SMUD) to expand into Yolo County to serve Pacific Gas and Electric (PG&E) customers in Davis, West Sacramento, Woodland, and adjacent unincorporated areas, will not substantially impair PG&E’s ability to provide adequate service at reasonable rates within the remainder of its service territory”

LAFCo Authority/Decisions LAFCo must determine if SMUD should replace PG&E as the electric service provider in portions of Yolo County (Organizational change) LAFCo assesses whether or not SMUD has the expertise and resources to serve the proposed annexation area Reasonable Rates Adequate Service Levels LAFCo does not have land use authority to tell SMUD where to site its facilities LAFCo can approve the annexation with terms and conditions that are intended to protect the environment and enforce LAFCo policies

Purpose of the LAFCo Draft EIR The LAFCO Draft EIR is issued to provide Sacramento LAFCo and the public with information regarding potentially significant effects of the proposed annexation on the environment To obtain comments from the general public, and federal, state, and local agencies on the Draft EIR

LAFCo Tentative Process Schedule 2006 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Issue Draft EIR 1/6 Draft EIR Public Review Public Comment Meetings Davis Woodland West Sacramento Sacramento/LAFCo Issue Final EIR LAFCo Public Hearings on EIR & Annexation If Approved, LAFCo Notifies County Clerks Annexation Vote 1/6-2/21 1/18 1/25 1/26 2/1 11/7/2006

Program Components The Program Components are the required actions to complete the proposed SMUD SOI Amendment and Annexation. They include: Administrative Decisions (Program Components 1-3) Modification of Existing Facilities (Program Components 4-5 & 8) Installation of New Facilities (Program Components 6-7) Operation and Maintenance of the Electric System (Program Component 9)

Program Components Program Component No. 1 Amendment of SMUD’s Sphere Of Influence (SOI) and SMUD’s proposed annexation Program Component No. 2 SMUD’s acquisition of PG&E facilities needed to serve the new annexation area Program Component No. 3 Memoranda of understanding or operating agreements with local jurisdictions in the annexation area Use Exhibit H, Figure 1. Show key land marks. Point to: SMUD’s Elverta Substation, Highway 99, Sacramento International Airport, Sacramento River, PG&E’s existing 115kV line. Show transmission line study area. Explain the concept of the transmission line study area Describe the line will be constructed on steel poles and will have six wires for electricity and one cable for communications Reconstruction of SMUD’s existing transmission line form Power In Road to SMUD’s Hedge Substation Review line reconstruction Use Exhibit H, Figure 2, Page 1-3 Show key land marks, Elder Creek Rd, Power In Road, existing PG&E existing line running north/south on Power In Rd, existing SMUD line running east/west. The line will connect the Davis Substation to SMUD’s Hedge Substation Trace the route from Power Inn Rd east to Hedge Substation. Describe the existing line has six wires and one fiber optic cable for communications. The reconstructed line will add three more wires. SMUD/PG&E transmission line interconnections Review SMUD/PG&E transmission line interconnection. Use Exhibit H, Figure 3 Interconnection of existing SMUD and PG&E transmission lines near SMUD’s North City Substation Show key land marks, point to: Highway 160, American River, SMUD’s North City Substation. Describe the plan to reconfigure SMUD and PG&E transmission line to provide a North City Substation to transmission line and a Hurley Substation Proposed Willow Slough Substation Review Willow Slough Substation. Exhibit H, Figure 4 Show key land marks. Point to: Road 27, Road 102, existing transmission line on Road 102 Explain the concept of the substation study area

Program Components Program Component No. 4 and No. 5 SMUD will reconstruct and modify certain transmission line facilities in Sacramento County Program Component No. 6 SMUD will construct a new 15-18 mile transmission line from its Elverta Substation to Yolo County north of Woodland. No route has been selected or rights-of-way acquired at this time. A study area was analyzed in the Draft EIR

Program Components Program Component No. 7 SMUD will construct a new electric substation in Yolo County near Roads 102 and 27 between Woodland and Davis. (Willow Slough Substation 1-3 acres). No site has been selected at this time. A study area was analyzed in the Draft EIR

Program Components 4-7

Program Components Program Component No. 8 SMUD will upgrade existing distribution electric facilities in the annexation area at locations to be determined Program Component No. 9 After SMUD connects the electric system within the annexation area to its existing system, SMUD will operate and maintain the electric system in the annexation area

SMUD Actions If approved by LAFCo and the voters, SMUD will proceed to determine how it will serve the new area SMUD will begin the process, as described in the EIR, for siting the proposed transmission line and substation that are required to complete the annexation SMUD will engage in a cooperative effort with the general public, property owners, agencies, and local jurisdictions for the siting of the transmission line and substation

SMUD Actions SMUD will be responsible for performing the necessary California Environmental Quality Act (CEQA) analysis for determining the final transmission line and substation location The final locations of the transmission line and substation require approval from the cities and counties where the facilities will be located. SMUD can override disapproval with a “supermajority” vote

LAFCo Draft EIR Conclusions

Potentially Significant Environmental Impacts The LAFCo Draft EIR identified the following potentially significant environmental impacts: Aesthetics Air Quality Short-Term Construction Noise Cumulative Impacts Growth Inducement

No Impact or Less Than Significant Environmental Impacts The LAFCo Draft EIR identified the following areas to be no impact or less than significant impact on the environment before or after mitigation: Agricultural Resources Biological Resources Cultural Resources Hazards and Hazardous Materials Hydrology/Water Quality Land Use/Planning

No Impact or Less Than Significant Environmental Impacts (cont.) Continued: Population/Housing Public Services Recreation Transportation/Traffic Utilities/Service Systems/Energy Conservation Mineral Resources Geology and Soils

Aesthetics The proposed transmission line from SMUD’s Elverta Substation to Woodland will likely encroach on views from County Roads 16 and 117, which are designated scenic roads on the Yolo County side of the Sacramento River

Air Quality Particulate from diesel-fueled vehicles: Short-term use of construction equipment to install program components SMUD ongoing Operation and Maintenance Activities (Approximately 20 trips/400 miles per day)

Short-Term Construction Noise Short-term noise due due to construction equipment: Areas impacted will be primarily rural agricultural areas

Cumulative Impacts Because the Sacramento/Yolo regions are experiencing long-term sustained growth, the Program’s impacts when combined with this regional growth may be significant The Program’s contribution to this impact, when compared to the regional projects, is small

Cumulative Impacts Regional projects include: South Sutter County Specific Plan (Measure M) Sacramento International Airport Master Plan Natomas Joint Vision Sacramento and Yolo Counties General Plan Updates City of Sacramento General Plan Update

Growth Inducement The projected electric system reliability and lower rates may attract new industrial and commercial customers to the annexation area This growth will be managed by the local jurisdictions and their respective planning and permitting processes

EIR Mitigation Measures The Draft EIR identifies and incorporates Best Management Practices (BMPs) and traditional mitigation measures to avoid and/or minimize the effects of the program on the environment BMPs and mitigation measures generally relate to future electric facility construction if the annexation is approved and SMUD proceeds to serve portions of Yolo County

Best Management Practices and Mitigation The Draft EIR includes a Draft Mitigation Monitoring Plan. After the plan is finalized by LAFCo, SMUD will be required to provide LAFCo with reports that provide the status of each Best Management Practice and Mitigation requirement imposed by LAFCo

Best Management Practices and Mitigation Siting of Transmission Electric Facilities: Collaborative siting effort Sacramento County General Plan Guidance Biological and Cultural Resources: Avoidance (time of year, distance) Worker training Transmission line design measures to avoid bird electrocution and collision Wetland and grassland replacement/ revegetation

Best Management Practices and Mitigation Agricultural Resources: Contribution to agricultural preserve Noise: Limitation on construction “time of day” hours

Best Management Practices and Mitigation Public Services: SMUD/Contractor security, safety and health plan Air Quality: Dust control measures Staging of work Idling limitation

Facilitated Questions and Comments Session

Public Comment Period Begins: January 6, 2006 Ends: February 21, 2006 (45 days) Comments must be received by 5 pm, Tuesday, February, 21st Written Comments and/or E-mail comments should be sent to Sacramento LAFCo, Attn: Peter Brundage <peter.brundage@saclafco.org> Responses to all comments will be included in the Final EIR