Space Coast TPO State Road (S.R.) 528 Update

Slides:



Advertisements
Similar presentations
Great Western Corridor Feasibility Study
Advertisements

From US 17 to SR 11 and SR 11 to Cone Road FPID No
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Titusville to Edgewater Bike Loop PD&E Study
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Wekiwa Springs Septic Tank Retrofit – Project Update Utilities Department March 10,
Lee County Government Division of Natural Resources TMDL/BMAP Update TMDL/BMAP Update November 30, 2010 Roland Ottolini, Director Lee County Division of.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
COMSTAC Launch Operations Support Working Group October 24, 2006 Jim Ball Spaceport Development Manager NASA Kennedy Space Center Spaceport Development.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
City of Satellite Beach. Satellite Beach Total area of 4.3 square miles Just over 10,000 residents 98% built out.
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Interlocal Agreement – Transportation Impact Fees City Council Meeting July 16, 2013.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Caroline County Pilot Watershed Implementation Plan (WIP) Katheleen Freeman, AICP, Director Caroline County Department of Planning & Codes Leslie Grunden,
Transportation Projects City Council Workshop May 14, 2013.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Harwich, Massachusetts Overview of Comprehensive Wastewater Management Plan (CWMP) East Harwich Planning Workshop June 4, 2014 East Harwich Planning Workshop.
Storm Water Management A report to City Council March 2006.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
POINCIANA PARKWAY TPO BOARD MEETING APRIL 12, 2012.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Duval County LID Design Manual
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Status & Right-of-Way Acquisition
Dave Clark and Michael Kasch
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Transmittal Ordinance
Draft Transportation Element September 6, 2017
Town of Melbourne Beach
Linking Transportation Infrastructure and Water Quality
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Florida Transportation Commission FY 2009
City of Forest Lake MS4 Program
S.R. 30 (U.S. 98) Tyndall Parkway
Anne Arundel County Maryland
September 25, 2018 District 5 SUN Trail Update
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
AIF Florida Water Forum
Heart of Florida Loop East Section
County Water Resources Programs in the Santa Margarita Basin
CP-TXT Water Supply Facilities Work Plan Amendment
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

Space Coast TPO State Road (S.R.) 528 Update Florida Department of TRANSPORTATION Space Coast TPO State Road (S.R.) 528 Update Jim Myers, P.E. Senior Drainage Engineer TLP Engineering Consultants, Inc. Florida Department of Transportation July 11, 2019

S.R. 528 Current Status PD&E Study Design Segments Construction From east of S.R. 524 (Industry Road) to Port Canaveral Interchange Widen from four to six lanes Completed 2006 Design Segments Design started 2016 R/W programmed 2024 Construction Not funded in 5 year work program Expenditures To Date >$15 million Florida Department of Transportation July 11, 2019

SR 528 Indian SR 528 Banana SR 520 Indian SR 520 Banana Removal of Causeways - Comparison of Project Construction Costs ($ in millions) Description FIT Run 2* FIT Run 3* FIT Run 4* Planned Funding (-4 project) Potential (-3 project) SR 528 Banana SR 528 Banana SR 520 Banana SR 528 Indian SR 528 Banana SR 520 Indian SR 520 Banana From December 2018 FIT Study: Percent reduction in tracer concentration compared to the existing configuration of Model Run 1. (Table 3) 0.0% 0.2% 3.3% 4.4% Banana River SR 528 (-4 project) (Bridge Increase to 4,500 ft) (“Assuming” funding for construction in FY 28) $216 $0 $263 Banana River SR 520 (Bridge only - 6,500 ft) (No Plans for Funding) $140 Indian River SR 528 (-3 Project) (Bridge Increase to 4,800 ft) (Not currently funded for construction) $259 $304 Indian River SR 520 (Bridge Only - 3,800 ft) $83 Total construction costs per Run (estimated) $522 $662 $790 Total Increase in construction compared to planned funding for -3 and -4 projects (est.) $47 $187 $315 Total Increase in construction compared to planned funding for -4 project (est.) $306 $446 $574 Any changes to the current FDOT project scopes would be additional costs such as PD&E study and analysis, design, other mitigation efforts, etc. These estimated costs above do not include these costs. Note: FDOT received an updated FIT Study Model on 6/24/2019 and is currently under review Florida Department of Transportation July 11, 2019

S.R. 528 – Impacts with Causeway Removals New Planning and PD&E Studies Required Planning Requirements - prior to PD&E Study Long Range Transportation Plan (LRTP) Amendment Typically takes 6 – 12 months Professional Services Procurement for PD&E Study Typically takes 1 year Florida Department of Transportation July 11, 2019

S.R. 528 – Impacts with Causeway Removals New PD&E Study Purpose and Need Alternative Analysis Engineering and Environmental Analysis Includes No Build Alternative Public Engagement Plan Location and Design Concept Acceptance (LDCA) from FHWA Typically takes 4 years Florida Department of Transportation July 11, 2019

S.R. 528 – Impacts with Causeway Removals Project Summary Could delay project by 15 years Funding may not be available to advance Planning needs to be re-prioritized & programmed Additional environmental and permitting risks Additional mitigation anticipated to be required Florida Department of Transportation July 11, 2019

S.R. 528 Stormwater Evaluations PD&E Study Completed in 2006 From S.R. 524 (Industry Road) to Port Canaveral Interchange Widen from 4 to 6 Lanes Pond Siting Report (PSR) Recommended 3 offsite ponds END PROJECT BEGIN PROJECT Banana River Creek Sykes Banana River Drive Florida Department of Transportation July 11, 2019

S.R. 528 Stormwater Evaluations 2006 Pond Siting Report Total Right of Way Needed = 15.3 acres Total Wetland Impacts from Ponds = 13.1 acres Treatment Volume Required (Presumptive Criteria Only) No Nutrient (Total Nitrogen or Total Phosphorus) Criteria at that time Florida Department of Transportation July 11, 2019

S.R. 528 Stormwater Evaluations SR 528 Design Project (#407402-4) Pond Siting Report Update Completed in 2017 Pre/post nutrient loading reduction required (implemented as of 2009) Reduction in total nitrogen (TN) = 4.4 kg/yr Reduction in total phosphorus (TP) = 3.7 kg/yr Total Right of Way needed (4 Offsite Ponds) = 27.6 acres Total wetland impacts from proposed ponds = 26.6 acres Initiated Environmental-Look-Around (ELA) Process Florida Department of Transportation July 11, 2019

S.R. 528 ELA Process (Project #407402-4) ELA Process Involved: Engaged Regional Stakeholders Brevard County Natural Resources Brevard County Planning and Development Brevard County Mosquito Control Indian River Lagoon – National Estuary Program St. Johns River Water Management District Florida Department of Environmental Regulation City of Cape Canaveral City of Cocoa Canaveral Port Authority Palmetto HOA Explored Regional & Watershed Opportunities Evaluated Compensatory Treatment Opportunities Identified Non-Traditional Approach Opportunities While Minimizing Environmental Impacts Florida Department of Transportation July 11, 2019

S.R. 528 ELA Process (Project #407402-4) ELA Results: Stormwater Eliminated Offsite Ponds and Right of Way Acquisition Incorporated Dry Swales and Nutrient Separating Baffle Boxes at Outfalls Increased in TN = 6.5 kg/yr Reduction in TP = 0.5 kg/yr Florida Department of Transportation July 11, 2019

S.R. 528 ELA Process (Project #407402-4) ELA Results Cont’d: Stormwater Options to Reduce TN Incorporate Additional Nutrient Separating Baffle Boxes at Outfalls OR FDOT Participation in Septic to Sewer Conversion Project (Sykes Creek “M”) JPA is needed between FDOT and Brevard County Allows for advancing additional SOIRL projects TN increase of 6.5 kg/yr goes to a reduction of 706.4 kg/yr Florida Department of Transportation July 11, 2019

S.R. 528 ELA Process (Project #407402-4) ELA Results Cont’d: Environmental Eliminating Offsite Ponds results in minimal Wetland Impacts Mitigation of remaining project impacts could be accomplished through conservation, mitigation, and enhancement of Mosquito Impoundment Area FDOT investigating the Purchase of Approximately 129 acres of Private Land FDOT would then transfer ownership through SJRWMD to Brevard County Brevard County has been acquiring similar lands in other Impoundment Areas Florida Department of Transportation July 11, 2019

ELA Approach (Recommended) S.R. 528 Design Project (#407402-4) Stormwater Evaluation Summary Traditional Approach ELA Approach (Recommended) 4 Offsite Ponds – Water Quality Compensatory Treatment - Water Quality 27.59 Acres Right of Way Estimated Minimal Right of Way Required 26.59 Acres of Wetland Impacts Estimated Minimal Wetland Impacts Total Nitrogen Estimated Reduction = 4.4 kg/yr = 706.4 kg/yr (160x better than Traditional) Total Phosphorous Estimated Reduction = 3.7 kg/yr = 0.5 kg/yr Mosquito Impoundment Outparcel Purchase FDOT Participation in Funding of Sykes Creek “M” SOIRL Project Ultimately Improves Water Quality in Indian River Lagoon (IRL) Florida Department of Transportation July 11, 2019

Space Coast TPO State Road (S.R.) 528 Update THANK YOU! Florida Department of TRANSPORTATION Space Coast TPO State Road (S.R.) 528 Update THANK YOU! Florida Department of Transportation July 11, 2019