Top 6 Tips to Deliver a Successful MES Project

Slides:



Advertisements
Similar presentations
Immediate Communications Visual Management Automatic Data Collection Andons Real Time Performance Visibility Wireless Innovations for the Production Floor.
Advertisements

Anatomy of a Multimedia Project
VersaCall’s Performance Intelligence Software Shop Floor Reporting Software Real Time Status Visibility Management Summary Reports Trend & Analysis Reports.
Getting the Business Case Right A complete guide to create compelling presentations that align IT technology benefits to enterprise value initiatives.
- Overall Equipment Effectiveness -
An off the shelf system for Downtime and OEE Reporting.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Wonderware Performance Software 3.5 “Real-time Visibility into Equipment Performance” Alex Chia Solution Sales Manager.
Lean Factory Management (LFM). About Us… Lori McNeely Ultriva Customer Support Specialist 2 Ed Conrey Ultriva Application.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Chapter 15 Application of Computer Simulation and Modeling.
presented by Zümbül Bulut
The Implicit Mapping into Feature Space. In order to learn non-linear relations with a linear machine, we need to select a set of non- linear features.
Enterprise Mobility ‘Mobile First’ strategy for your Business
PBA Front-End Programming Development Organisation.
System Implementation
Lean MAST Tools for Integrating Lean Projects. Lean MAST Overview Lean MAST provides the roadmap for the transformation from a work order based production.
Wireless Innovations for the Production Floor Visual Management Software Virtual Panel III Software Visual Messaging Software Factory Floor Communication.
An Introduction to AlarmInsight
Bayu Priyambadha, S.Kom Teknik Informatika Universitas Brawijaya.
Residential Realty / QR Code Manager. Overview The purpose of these sales webinars are to: Utilize Mobile to Build New Clients Outline Targeted Industries.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
Copyright © 2007 OSIsoft, Inc. All rights reserved. Ekho - MES Applications that leverages AF 2.0 Yannick Galipeau Inexcon Technologies Patrick Ramsey.
Introduction to Making Multimedia
M4 - 1 BU ILDING STRONG SM Multi-Purpose Projects Module M4: Telling the Plan Formulation Story.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
T Iteration Demo Group name [PP|I1|I2] Iteration
PBA Front-End Programming Development Organisation.
T Project Review (Template for PI and I1 phases) Group name [PI|I1] Phase
Product Management Or.. The most important thing most startups forget to do.
Barely Sufficient Portfolio Management Todd Little & Kent McDonald So many decisions, more time than we thought.
T Iteration Demo Group name [PP|I1|I2] Iteration
It’s Not UX Without User Research Dorian Freeman 4/22/15.
Requirements Management with Use Cases Module 2: Introduction to RMUC Requirements Management with Use Cases Module 2: Introduction to RMUC.
Introduction to OEE (Overall Equipment Effectiveness)
Company LOGO Sage CRM – Marketing Sage CRM 7.3 provides a new integration with MailChimp for marketing campaigns. In this.
 Tata consultancy services Production Planning WORK CENTERS.
Workshop: Work Completion Process May 16, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Over the recent years, computer vision has started to play a significant role in the Human Computer Interaction (HCI). With efficient object tracking.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
LOGO AutoCarParking Capstone Project. LOGO Project Role HungPD Supervisor Huynb Project Manager, Developer Truongpx Developer Tuanhh Developer, tester.
What’s New for the MES Product Suite Tom Hechtman & Jason Coope.
Moderator Don Pearson Chief Strategy Officer Inductive Automation.
ITEC 275 Computer Networks – Switching, Routing, and WANs
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Red Line Customer Capacity Update
Manufacturing Productivity Solutions
3.2 Your strategic MES partner.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Welcome to Driver Manager Overview
Sara Snow & Kirk Yoshida
Strategy implementation
2012 Line Information System Coca-Cola Refreshment
The value of a project-oriented approach to IT and how we do it in IBM
SharePoint Online: Migration Planning to avoid Mistakes
4H Short Interval Control
Chapter 10 Development of Multimedia Project
Project Theory and Application
Gotcha! SharePoint Online Migration Mistakes to Avoid
Practical guide to build Modern Intranet sites with SharePoint Communication Sites Asish Padhy.
SSI Toolbox Status Workbook Overview
Microsoft Project Past, Present and Future
Phases of Designing a Website
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Workshop: High Level Reporting
Key Driver Diagram (KDD): _________________________
UML Design for an Automated Registration System
Reviewing Features in Word
Presentation transcript:

Top 6 Tips to Deliver a Successful MES Project Chris McLaughlin SCADA & MES Specialist / Vertech

SCADA & MES Specialist / Vertech Chris McLaughlin SCADA & MES Specialist / Vertech

What is a Successful Project? Integrator and End User definitions of a successful project are different Integrator Goals End User Goals Profitable Project On Budget Consistent Engineer Utilization On Time Complete all the scope objectives Deliver Value (repeat business) User Adoption Continuous Improvement “More boxes out the door or less cars in the parking lot” ROI

What can make a MES implementation fail? 3 Real-Life Examples Invest millions, then pull back to small feature set MES Invest millions, stop the implementation, rip and replace MES Great feature set, no adoption, no use

That you can use right when you go back to work My Goal 6 Specific Strategies That you can use right when you go back to work

Team Approach and Change Management 1 Team Approach, stakeholders, operator input, change management Project Lead Engineering and IT Executive Representative Someone who: Understands how the Process Works Understands how the Process Makes Money Understands how to Make the Process More Efficient Can Affect Change on an Equipment and Human Level Operators Team Leads Who owns the project once it is implemented? Material management Rates management Codes management Modifications and Additions

Team Approach and Change Management 1 Kotter’s 8 Steps For Leading Change Vertech.com/ICC Image by TRACC

Process Map 2 Processes

Process Map 2 LucidCharts.com

Features and Calculations 3 Line or Machine Products Availability Downtime Tracking Performance Quality Statuses, Events, Triggers Theory and Calculations Screens Details

Features and Calculations 3 Vertech.com/ICC

30%, 60% and 90% Reviews 4 Scheduled Review Workshops 30%: Main overview screen, 1 – 2 sub screens, wireframes of the rest Purpose: review look and feel, content understanding, major edits 60%: Majority of the screens in a semi-finished state, back-end developing Purpose: review content on the new screens and revisions, possibly a simulated demo, minor edits and content 90%: All screens in a mostly-finished state, back-end is nearing completion Purpose: review revisions from the 60%, simulated demo possibly with live content from the plant floor, very minor content comments

Actionable Information 5 Actionable Information: Providing information to the right person at the right time with context so that they can make a decision and act. 24.83 ft 7.00 ft 52A 105A

Actionable Information 5 OEE: 68% Status: Line Down Quality: 100% Availability: 85% Performance: 80% Rate: 327 pph OEE: 68% (warning color) Status: Line Down (current time, total time) Quality: 100% (neutral gray) Availability: 85% (neutral gray) Performance: 80% (warning color) Rate: 327 pph (target 400 pph, average 320 pph) Top 3 downtime reasons Top 3 performance reasons Total delay in minutes: A=36 min, P= 60 minutes Text operations manager if delay > or = 1 hour Email maintenance lead if availability < or = 70%

UX for OEE – Original Screen 6

UX for OEE – Squint Test 6

UX for OEE – Color 6

UX for OEE – Space 6 12.5% 2.5% 60% 10%

UX for OEE – Space 6

UX for OEE – Audience and Context 6

UX for OEE – Comparison 6

UX for OEE – Redesign 6