“ Construction of a Hospital Building” Submitted by: Zuhaib Alam 15PWIND0402 Submitted To: Prof.Rashid Nawaz Department of Industrial Engineering University.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Chapter 3 Project Management.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
Civil Engineering & Architecture 2.3 Residential Design.
Facility Management. The International Facility Management Association defines facility management as a profession that encompasses multiple disciplines.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
7 Set of Floor Plans Primary Considerations
USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use.
2001 Winter Presentation. Site Location Site View.
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Finishing the Building
Syllabus Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture - Week 1 2 nd Semester 2007/2008 UP Copyrights 2007 Introduction.
Syllabus Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture - Week 1 2 nd Semester 2008/2009 UP Copyrights 2008 Introduction.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
THE CRANBEL COURT CITIVIEW AREPO. We are pleased to announce the launch of our new and elegant product, the Cranbel Courts Apartment, Citiview, Arepo.
Operational Research (O.R.) case studies. What’s the problem?
MS PROJECT 2013 Project Planning, Scheduling, Monitoring and Control ASSOC. PROF. DR. İBRAHİM YİTMEN FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING.
IET 120 CONSTRUCTION PROJECT Name: Elizabeth McClain.
Turtle Creek Apartment Project Update Able Construction September 15, 1999.
E N T E R P R I S E S. A COMMON MANS DREAM COME LIVE WITH US AT HEIGHTS.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Estimating and Scheduling CEE 492
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
The New Echuca Hospital October 2011 Update
UNIT II Scheduling Procedures & Techniques FLOAT
Fun Facts: James M. Bennett High School
Major Steps In Building a SFR
EDENSVILLE ESTATE SIMAWA.
How Completed Interiors Are Achieved: Designing & Building
Fall 2017 Update: Physical properties and sinking fund
Capital Improvements Presentation
HOUSING & INTERIOR DESIGN
What is the best method for constructing schools in Palestine ?
Planning and Scheduling a SIMPLIFIED Construction Project
Pre-Contract Cost Control
Project Management McGraw Hill “Service Management” by Fitzsimmons.
Awarding Criterion for late tender: the lowest bid- why?
UNION GROVE ELEMENTARY REFERENDUM
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Carleton College Summer 2018 Science and Campus Construction Plan
Consulting Captains, LLC
1 Semester Project Design A Multi Story Office Building
INTRODUCTION WORK BREAKDOWN STRUCTURE
The Asset Management Journey for Building Assets
House Construction Budget Plan
GROUP MEMBERS:  Shakeel Ahmad Khalil 16-EC-35  Rehan Shakoor 16-CE-59  Usman Ali Munir 16-CE-103  Najib-ullah 16-CE-143  Faisal Ali 16-CE-163.
In-Class Scheduling Exercise
Exercise – A small building.
CMPE/SE 131 Software Engineering March 23 Class Meeting
Minuteman Vocational Technical Regional High School Progress
Wbs, CONTRACTORS & GIVING A BID
Presentation transcript:

“ Construction of a Hospital Building” Submitted by: Zuhaib Alam 15PWIND0402 Submitted To: Prof.Rashid Nawaz Department of Industrial Engineering University Of Engineering And Technology Peshawar

Contents Introduction Objective Requirement Specification WBS (Work breakdown structure) Organizing & Staffing Project Budgeting Network Diagram Critical Path Conclusion

Introduction This project is related with Hospital construction building in Charsadda (KPK) which has a population of million. The project consist of rooms,lifts,basement,ground floor and 1 st floor. Because the people are feeling difficulty when go to other Districts for hospitals so this will help the people a lot. The contract for delivering the building to be used as a Hospital.

Objective The main objective of this project is that to complete the project within the budget, time and cost. Another objective is to achieve profitability, credibility, competitive advantages and publicity. And Hospital building is ready by,March,2018.

Not within scope Medical equipment installation is not part of this project. Wood works does not included furniture. No floor carpeting will be done. Only wiring for Networking will be done, Equipment will not be installed.

Requirement Specifications Product Requirement: Hospital Building Rooms Electrical Requirement Doors Lift Uncovered Area 99% Copper 1MW Main Breaker Capacity Three Phase Main Door Auto Remaining Door Wooden Lift 8m 2 Three Lift Farthest Apart Access to All floors Through Lift At least 1/5 th of the land uncovered Car parking 200m2 Garden 100m2

Basement Kitchen 20m2 Laundry 40m2 Ground Floor Medical Store 20m2 Emergency Ward 25m2 Surgical Ward 20m2 Laboratory 20m2 First Floor Waiting Area 100m2 Patient Ward 100m2

Project Requirements Project Initiation no later than August, 2017 Project completion by March, 2018 Cost must not exceed 35 Million No Child labor to be used

Work Breakdown Structure(WBS) Hospital Building Site Preparation Architecture design Electrical Works Plumbing Works HVAC Interior/ Exterior Decorator Call Out for Design Select & Finalize Design Wiring Appliance Installation Circuit Breaker Installation Piping Sanitary Fittings Ducting Equipment Fitting Glass Works Paint Decorate Exterior

Organization & Staffing Project Owner Project ManagerResource Owner Negotiation manager Financial manager Construction manager Logistic Manager Budgeting Team Architecture Design Team Electrical Works Team HVAC & Plumbing Sub Project Wood Works Networking Decoration Works Lift Installation

Project Budgeting PHASESPERCENTAGE(%)COST(PKR) Excavation3600,000 Structural Concrete71,400,000 Framing153,000,000 Material Cost102,000,000 Roofing3600,000 Windows & Glass Work4800,000 Plumbing & Drainage51,000,000 Electrical51,000,000 HVAC51,000,000 Masonry61,200,000 Tile Installers & Finishers 2400,000 Lift Design3600,000

Continued PHASESPERCENTAGE (%)COST Light Design36000,000 Paint/Strain71,400,000 Laundry81,600,000 Appliances4800,000 Catering Kitchen Equip2400,000 Parking & Garden Design61,200,000 Final Grade2400,000 Total100 25,400,000

Assignments ActivityNotationDuration(Days) AExcavation8 BFoundation10 CFrame90 DElectrical30 EPlumbing35 FRoof40 GMasonry50 HInterior30 IExterior15 JLandscape5

Network Diagram A B C F E D GHIJ ES EF LS LF

Critical Path ActivityDurationEarliest Start Earliest Finish Latest Start Latest Finish SlackCritical Path A808880Y B Y C Y D N E N F Y G Y H Y I Y J Y

Continued Critical Path and its Duration: A - B - C- F – G – H – I - J = = is critical path duration decrease or increase in this value change the project,if decrease from this value then the project will be delay.

Conclusion: It is concluded from this presentation that the project is completed within the budget, time and cost. The budget for the project was 30 million and the project was completed within the budget i.e. 25 million so we save money and also before from the dateline. The project also provide facility to the people.

“Thank you”