Phase II Collimator, Alternative Jaw Simulations

Slides:



Advertisements
Similar presentations
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Advertisements

Phase Difference = Phase Difference = 0.05.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Engineering Department ENEN 16/08/2013 LR - BBC Pre-Study 1 STATUS of BBC DESIGN and ENGINEERING : PRELIMINARY RESULTS G. MAITREJEAN, L. GENTINI.
LARP Rotatable Collimators for LHC Phase II Collimation 26 October 2006 LARP Collaboration Meeting – Port Jefferson, NY Tom Markiewicz/SLAC Representing.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
Beam LARP Rotatable Collimator Mechanical Engineering Discussion 03 October 2008 Phase II CERN ME Video Mtg. Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC.
LARP Rotatable Collimators for LHC Phase II Collimation 26 October 2006 LARP Collaboration Meeting – Port Jefferson, NY Tom Markiewicz/SLAC Representing.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
Status of Phase II Energy Loss Studies 1. FLUKA with “simple” CERN-provided input file modeling ~40m around primary collimators used for all SLAC studies.
The SLAC Phase II Collimator Program 15 June 2005 CERN Team Visit Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
A. Bertarelli, A. DallocchioLHC Collimation Phase II – Conceptual Review 02/04/2009 Phase II Collimators at CERN: design status and proposals LHC Collimation.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
LARP Rotatable Collimators for LHC Phase II Collimation 18 April 2007 LARP Collaboration Meeting – Fermilab Tom Markiewicz/SLAC Representing Gene Anzalone,
1 LARP Collimator Engineering E. Doyle 2/3/05. 2 Review: SS Thermal Simulation 150mm OD 25mm wall Simply supported Heat: 1hr beam life, FLUKA results,
A. Bertarelli, A. DallocchioEuCARD/ColMat Kick-off Meeting 17/06/2009 EuCARD/ColMat Kick-off Meeting EuCARD/ColMat Kick-off Meeting 17 th June, 2009 A.Bertarelli,
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle1/20 Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation.
Phase II Collimators for LHC Upgrade at SLAC - Material Issues E. Doyle 03 Sept /25 Workshop on Materials for Collimators CERN 2007/09/03 Phase.
Engineering Department ENEN Consequences and Possible Cause of Elevated Collimator Temperatures Collimation Working Group L. Mettler, F. Carra,
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Recent Energy Deposition Simulations TCSM-A6L7 L. Keller LARP Video Mtg. 02 Oct
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
accident deformation – doyle 1/12 Phase II Collimator - Accident Deformation Simulation December 11, 2006.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
BNL Irradiation Studies and the LHC Collimators
Preliminary ANSYS Studies for Tungsten Collimators
on behalf of the Phase II Collimation Design team
LARP Collimation – Engineering & Analysis
LARP Contributions to LHC Phase II Collimation
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
LARP Phase II Secondary Collimator RC1
Problem: A kicker failure can deposit 9 x 1011 protons on any metallic
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Halo scraping and loss rates at collimators
EuCARD 1st Annual Meeting
2th EuCard Col/Mat WP Meeting
Status of energy deposition studies in IR3
Recommendations of 12/16/05 review committee & SLAC response
LARP Collimation – Engineering & Analysis
¼ meshed models for Omega3P calculations
LARP Phase II Secondary Collimator RC1
SEM monitors tests PSI February MeV protons
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
accident deformation – doyle (rev1) 1/8
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
LARP Phase II Secondary Collimator RC-1
Post-Irradiation Results of the LHC Collimator Carbon-Carbon
US LHC Accelerator Research Program
Topic 6 and 7 Designing with Forces and Stable structures
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
RC1 Prototype Conceptual Design Review 15 December, 2005
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
US LHC Accelerator Research Program
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
accident deformation – doyle 1/8
Injection design of CEPC
Presentation transcript:

Phase II Collimator, Alternative Jaw Simulations E. Doyle January 30, 2007 2007-01-30 jaw simulations – doyle rev 1/30/07 1/5

2007-01-30 jaw simulations – doyle rev 1/30/07 2/5 Alternative Jaws Baseline: Glidcop + Mo shaft Glidcop with Glidcop shaft In case of fabrication problems with Mo Glidcop with Cu shaft If shaft/mandrel can be made one piece .5 m long Glidcop with Mo shaft Lighter, stiffer, more stable, etc 2007-01-30 jaw simulations – doyle rev 1/30/07 2/5

2007-01-30 jaw simulations – doyle rev 1/30/07 3/5 Gravity Loading baseline 2007-01-30 jaw simulations – doyle rev 1/30/07 3/5

Steady State – 1 hr beam lifetime 2007-01-30 jaw simulations – doyle rev 1/30/07 4/5

Transient – 12 min beam lifetime, 10 sec duration 2007-01-30 jaw simulations – doyle rev 1/30/07 5/5