Crab Crossing Named #1 common technical risk (p. 6 of the report)

Slides:



Advertisements
Similar presentations
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Full-Acceptance Detector Integration at MEIC Vasiliy Morozov for MEIC Study Group Electron Ion Collider Users Meeting, Stony Brook University June 27,
IR Optics and Nonlinear Beam Dynamics Fanglei Lin for MEIC study group at JLab 2 nd Mini-workshop on MEIC IR Design, November 2, 2012.
Considerations on Interaction Region design for Muon Collider Muon Collider Design Workshop JLab, December 8-12, 2008 Guimei Wang, Muons,Inc., /ODU/JLab.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Nonlinear Dynamic Study of FCC-ee Pavel Piminov, Budker Institute of Nuclear Physics, Novosibirsk, Russia.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Full-Acceptance & 2 nd Detector Region Designs V.S. Morozov on behalf of the JLEIC detector study group JLEIC Collaboration Meeting, JLab March 29-31,
MDI and head-on collision option for electron-positron Higgs factories
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
LHeC interaction region
Beam-beam effects in eRHIC and MeRHIC
JLEIC Forward Ion Detection Region
Design Fabrication and Processing Group H. Padamsee
Accelerator R&D for the Super-B Factory
Large Booster and Collider Ring
First Look at Nonlinear Dynamics in the Electron Collider Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
The design of interaction region
Specifications for the JLEIC IR Magnets
Comparison of the final focus design
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
Update on JLEIC Interaction Region Design
Design of Interaction Region
EIC Accelerator Collaboration Meeting
Accelerator and Interaction Region
Overall Considerations, Main Challenges and Goals
Sawtooth effect in CEPC PDR/APDR
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Update on MEIC Nonlinear Dynamics Work
MEIC New Baseline: Luminosity Performance and Upgrade Path
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Status and plans for crab crossing studies at JLEIC
JLEIC Main Parameters with Strong Electron Cooling
Update on JLEIC Electron Ring Design
Compensation of Detector Solenoids
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
JLEIC Collider Rings’ Geometry Options (II)
Progress Update on the Electron Polarization Study in the JLEIC
Integration of Detector Solenoid into the JLEIC ion collider ring
IR/MDI requirements for the EIC
More on MEIC Beam Synchronization
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Upgrade on Compensation of Detector Solenoid effects
HE-JLEIC: Do We Have a Baseline?
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Overview Slides for JLEIC Presenters
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Crab Crossing Named #1 common technical risk (p. 6 of the report) “all EIC project proposals take this concept for granted” Discussion: “For the JLEIC collider design, there are presently two locations in the rings where crab cavities could be located leading to two sets of crab specifications. Both vertical and horizontal crab cavities are used to correct for detector solenoid rotation effects. The JLEIC crab specifications will likely solidify in the coming year. There is presently dispersion at the location of the crab cavities in JLEIC. The committee was concerned about potential beam dynamic issues that may arise from dispersion; these issues should be studied.” “More extensive simulations of hadron beams with strong crab cavities, long bunches, and beam-beam collisions need to be done.” “These simulations should include phase jitter tolerances, voltage variations, beam rotations due to the detector solenoid, transverse beam offsets in the cavities, dispersion, IR upstream-downstream cancelation, and third harmonic cavities.”

Crab Crossing Risks: “the cavities do not achieve the required performance, including peak voltage and degradation with time” Recommendations “Continue crab cavity design, simulation, and prototype development efforts” “Foster collaborative design efforts…” “More tightly integrate crab cavity activities into the broader design effort, specifically ring dynamics studies and detailed IR design.” “…study an alternative option … without the use of crab cavities…”

Interaction Regions Discussion: “The machine-detector-interface should be given more attention in all designs. This includes the choice of β*, space allocation for luminosity monitors, polarimeters, the effects of the detector solenoid (and the possible need for and integration of compensating and shielding solenoids) together with solenoid fringe fields in presence of a relative large crossing angle that could have effects on polarization, synchrotron-radiation background, vertical emittance, and so on. Synchrotron radiation background in the detector could be important…” (p. 2) Risks: JLEIC “…large aperture, high gradient superferric quadrupoles together with superferric dipoles of high fields… present significant risk.” “The detector design and IR design integration must… accommodate the planned high collision frequencies and high angular divergence.” “Chromaticity Correction Block… performance must be evaluated.” The crab crossing… will be challenging”

Interaction Regions Recommendations All designs JLEIC “Perform a detailed machine-detector-interface design optimization including the choice of β*, space allocation for luminosity monitors and polarimeters, effect of detector solenoid together with solenoid fringe fields in presence of a crossing angle, synchrotron-radiation background in the detector including possibly reflected photons.” “Validate the crab crossing of both hadron and electron beams…” “Develop back-up solutions for crab cavities…” JLEIC “Perform a detailed detector conceptual design and IR design integration including the detector response time and background consideration pertaining to the high collision frequencies and high angular divergence” “Develop IR large aperture, high gradient quadrupoles and IR high field dipoles that correspond to 100 GeV.” com energy. “Consider alternative, better-established magnet technology…” “Perform detailed beam dynamics verification including dynamic aperture analysis of the Chromaticity Correction Block (CCB) scheme.” “Develop backup chromaticity compensation schemes like the Achromatic Telescopic Squeezing (ATS).” “Optimize collider parameters (tune shift).” Validate the crab crossing… study an alternative option…”