WELCOME TO TURBINE & ITS AUXILIARIES KNOWLEDGE GROUP PRESENTATION by madhukar srivastava, se (m), ktps, dvc.

Slides:



Advertisements
Similar presentations
ACTIVE LEARNING PROCESS
Advertisements

Mountings & Accessories
JET PROPULSION Part 5 Jet Engine Operation Oil Systems.
CHEMICAL CLEANING OF PRE-BOILER SYSTEM
Watertube Boiler.
Labyrinth seal into two halves
SURATGARH SUPER THERMAL POWER STATION
1B-1 Fire Engine Maintenance Unit 1B – Pump Inspections and Maintenance.
Sunday, May 17, 2015 Pressure Booster Service. Sunday, May 17, 2015 Booster Service Basics Control Panel Components Setting a pressure switch Setting.
PUMP CONDITION EVALUATION. BEARINGS PUMP SHAFT BEARING FRAME REAR COVER IMPELLER PUMP CASE.
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
2 July Turbine Condensate System
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
Pump Installation Vigyan Ashram, Pabal.
Feedwater Systems Reliability Users Group Annual Meeting January 20-23, 2014 Feedwater Pump Thrust Bearing Failure Presented By: Kurt J. Weis Rotating.
Hydronic Mechanical Controls
Reciprocating pump Pumps are used to increase the energy level of water by virtue of which it can be raised to a higher level. Reciprocating pumps are.
STEAM TURBINE POWER PLANT Muhammad Taha (EE106013) Faisal Iqbal Khan
GIDC DEGREE ENGINEERING COLLEGE BRANCH- CIVIL ENROLLMENT NO PATEL SHARADKUMAR KIRITBHAI SHARMA TANISHQ SHAH ASHIT.
Engine drills & Limitations.
1. - Condensate pump and feed pump trip! -Turbine trips! 2.
Parul Institute of Engineering & Technology Subject Code : Name Of Subject :Fluid Power Engineering Topic :Rotodynamic Pumps.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
A seminar on Practical Training taken at KOTA SUPER THERMAL POWER STATION.
Oil Pressure Testing.
LESSON 16 ENGINE OPERATION
BOILER MOUNTINGS & ACCESSORIES
MRO Dry Gas Seal Reliability Improvement
GUJARAT TECHNOLOGICAL UNIVERSITY (GTU) Mahatma Gandhi Institute Of Technical Education and Research Center, Navsari Affiliated with GTU Presentation on.
NN-CS596S Steam Microwave Oven. NN-CS596S Oven Specification.
Contents Click a Section Tab.
A.D PATEL INST OF TECH. NAME : SETA BHAUMIK D. ( ) TOPIC : CENTRIFUGAL PUMPS FACULTY : BHAUMIK SHETH.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
FLUID POWER CONTROL ME604C. FLUID POWER MODULE:02 ~ HYDRAULIC SYSTEM COMPONENTS.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.
18 MW TURBINE CONTROL PANEL
An Energy & Environment Conscious Sustainable Organization A Presentation on “Turbine Interlocks 2X50 MW”
IN THE NAME OF ALLAH, THE BENEFICENT, THE MERCIFUL
DEAERATOR-STAGE-II/TPS-II /NLC INDIA LTD
Lesson 7 Steam Power Plant.
MACHINE OPERATION.
VALVES IN PIPE LINES.
CYLINDER BLOCK GROUP FIG 101
Climate Control Systems Service
- Condensate pump and feed pump trip!
System One Pumps S1-101 Construction and Features
Steering Systems Topics covered in this presentation:
Troubleshooting Hydraulic Pumps
OBJECTIVES State the principles of vacuum and the vacuum booster theory. Discuss how a vacuum brake booster operates. Discuss the vacuum booster operation.
HIGH PERFORMANCE LEVEL CONTROL.
Fire fighting Robot.
Stop Check Valve Used in Ammonia Refrigeration System Manufactured by Maniks
Know the Problems Associated With your Pool Pump
LUBRICATION METHODS.
ITEMS TO CHECK ON Running Pumps
Fuel Supply System Service
Trouble Shooting Hydraulic System Failure
Camshafts, Lifters, Timing Belts, and Chains
- Condensate pump and feed pump trip!
What is a Turbine ? A Turbine is a device which converts the heat energy of steam into the kinetic energy & then to rotational energy. The Motive Power.
Diagnosing Engine Problems
AIR COMPRESOR Chapter-13.
WATER AND STEAM SYSTEM.
 PURPOSE OF LUB OIL SYSTEM In the 250 MW KWU turbines :  Single oil is used for  A] Lubrication Of All Bearings,  B] Control Oil For Governing System.
BOILER PROTECTION AND INTERLOCKS
Boiler Safety Valve Regulations
SEVERE OIL LEAKAGE THROUGH BEARING PADESTAL
Shrink-fit Turbine Coupling – a revolution and a revelation
660 MW SUPERCRITICAL TURBINE " GOVERNING & PROTECTION SYSTEM"
Presentation transcript:

WELCOME TO TURBINE & ITS AUXILIARIES KNOWLEDGE GROUP PRESENTATION by madhukar srivastava, se (m), ktps, dvc

MOTOR DRIVEN BOILER FEED PUMP TROUBLE TRIPPING OF MDBFP ON THRUST BEARING TEMPERATURE HIGH

TRIPPING OF MDBFP ON THRUST BEARING TEMPERATURE HIGH INTRODUCTION: There are three Boiler Feed Pumps (3x 50%) in 2 X 500MW KTPS, DVC for supplying feed water to Boiler drum through HP heaters & economiser. Normally Turbine driven BFP is in operation and MDBFP  usually runs during start up, shutdown or during unavailability of any of the TDBFP’s .

TRIPPING OF MDBFP ON THRUST BEARING TEMPERATURE HIGH Problem faced: On 01/02/2017, MDBFP of U# 1 was started for hydro test of boiler. After start-up, it was observed that main pump thrust bearing temperature was rising abnormally at higher rate with the increase in speed & thrust bearing vibration was also noticed to be high (around 7-8). The pump tripped at 4000 rpm on thrust bearing temp. high.

TRIPPING OF MDBFP ON THRUST BEARING TEMPERATURE HIGH Observation: flow of Oil stream from mechanical seal housing drain line had been noticed which stopped soon after opening of breather of Hydro coupling.

TRIPPING OF MDBFP ON THRUST BEARING TEMPERATURE HIGH Action taken: Boiler feed pump NDE side bearing cover was opened & clearance between working pad & thrust collar was checked and was found within design value (0.5mm). Thereafter thrust bearing pads was taken out for inspection in which rubbing marks (mostly at centre) was noticed. All pads were polished & blue matching was done. Thrust bearing pads alongwith their carrier were placed at its position & its clearance was checked which was found to be 0.55 mm.

Working side thrust pads with rub marks

Thrust pads blue matching before polishing

Trust pads after polishing

THRUST BEARING PADS BLUE MATCHING AFTER POLISHING

TRIPPING OF MDBFP ON THRUST BEARING TEMPERATURE HIGH Pump was again run after box-up for hydrotest of boiler without breather & this time around, rpm was increased gradually upto 4300. At 4300 rpm of BFP & discharge pressure of 163 kg/cm2, Thrust bearing temperature (73 max) & BFP vibration (5-6) was observed to be normal under hydro test condition.

TRIPPING OF MDBFP ON THRUST BEARING TEMPERATURE HIGH Conclusion:- Probably an oil film had got developed in the strainer of breather which was obstructing flow of vapour through it. It may have pressurised the hydro coupling chamber. This could have resulted in the blockage of flow through the thrust bearing momentarily. Advice: It is advisable that the breather should be checked and if no oil vapour observed near surrounding area ,strainer should be cleaned if necessary.

INTERCEPTOR VALVE TROUBLE/PROBLEM Interceptor valve#2 of Main Turbine of Unit#1 was getting closed after opening up to 90%.

Possible areas of concern Test valve IV Servomotor Interceptor valve Brainstorming to find the actual cause of trouble. a)Test valve : Through this valve trip oil supplies to the Servomotor for its opening. It was dismantled to check any abnormality. However no problem was observed.

b)Servomotor: On operating the servomotor individually in decoupled condition, it was observed that it was opened to its maximum stroke (215mm)with out getting closed. c)Interceptor valve: In decoupled condition, valve lift was checked with the help of chain pulley block and it was found 200mm, which clearly indicates some obstruction , restricting full opening of the valve.

ACTION TAKEN Interceptor valve was dismantled. b) Findings: The Locking plate (Part no-26 drawing no. 1-11320-27000) provided for locking of Threaded ring(Part no. 16) got detached and had fallen in the cavity in between spindle and valve body, which was obstructing the full opening of the valve.

C) Locking Plate was welded to its place.

. D) Opening of valve was checked with the help of chain pulley block, in dismantled condition and valve travel was measured approx 215mm, same as that of drawing value. E) After box-up valve opening with servomotor was checked, and observed that valve was opening smoothly to its maximum stroke (215mm) without getting closed.