LCLS-II Operations in LERF

Slides:



Advertisements
Similar presentations
LLRF workshop 2013 Towards the next generation LLRF LBNL Gang Huang On behalf of LLRF Team LLRF workshop Oct. 1, 2013.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Chapter 13 Organizing Information System Resources MIS Department Centralization and Decentralization Outsourcing Computer Facilities and Services.
US Cavities Status and Plan Mark Champion 01 October 2009.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Fermilab Cryomodule QA/QC Model Jamie Blowers LCLS-II EDM/PLM Applications 31-Mar-2014.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Test Lab Cryogenic Requirements Kirk Davis Director’s Review of Cryogenic Capacity 26 May, 2010.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
LCLS-II Cryoplant Overview
Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.
LCLS-II Prototype Cryomodule FDR J. Blowers, C.M. Ginsburg, T. Peterson, R. Stanek, J. Theilacker (FNAL) 21 – 22 January 2015 Homework Responses.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Welcome to Michigan Welcome to MSU/FRIB Welcome to the Spring 2015 EPICS collaboration meeting Welcome! L.T.Hoff, Slide 1.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Installation Package - Electrical
Cryoplant Controls Installation
RF Systems and Controls for the LERF CM Tests
Cryogenic Plant Electrical and Controls
LCLS-II For LCLS-II Cryomodule Testing at JLab
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
2K Cold Box FDR Introduction
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
Plans towards CC in the LHC a US – centric perspective
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
LCLS-II Cryoplant Controls Readiness to Procure
ESS RF Development at Uppsala University
Upgraded Injector Test Facility
Introduction to Jefferson Lab
C75 Risk Assessment Geoff Krafft
E. Daly / K. Jordan / C. Hovater / T. Hiatt 03-AUG-2017
LERF Cryomodule Testing Facility – Accelerator Systems Deliverable
LERF Readiness Review Kevin Jordan
Scope, Requirements Deliverables & Schedule
LINAC OPS Budget Review
Baseline Change Request
LERF Readiness Review: Charge
Operator Training Requirements
Control Hardware & Status
RF System (HLRF, LLRF, Controls) EDR Plan Overview
LCLS Cryomodule Testing in the LERF- OSP
CryoPlant Commissioning
CTF Users’ Perspective
LCLS Injector Configuration
Tasks, Responsibilities Expectations and Needs
LTU/Undulator Installation Status
Onsite Training at JLab
Status & Schedule for ESS TS2
LCLS Control System Personnel Linac & BC2 Controls progress
LERF CM Supplemental Testing & Change Management
Presentation transcript:

LCLS-II Operations in LERF Alessandro Ratti, John Schmerge Transition to Operations Review: LCLS-II Cryomodule Commissioning in LERF November 12 - 13, 2018

Outline LERF Setup and LCLS-II’s contribution Roles and Responsibilities in setup Main Objective for LCLS-II Additional Benefits Operation Support (or not) A.Ratti, J. Schmerge, Transition to Operations Review: LSCL-II Cryomodule Commissioning in LERF

LCLS-II Setup at LERF LCLS-II provided most of the electronics and control systems SSAs LLRF controllers CryoModule controllers These are all production units needed back at SLAC before the end of construction and the beginning of commissioning JLAB contributed significant local support Networking and Local Controls All installation, cabling, RF power distribution, AC power…. All cryogenic system connections and interfaces Funding to ship the equipment back to SLAC was allocated to JLAB Relative roles and responsibilities described in a dedicated ICD - LCLSII-2.7-IC-1116-R0 A.Ratti, J. Schmerge, Transition to Operations Review: LSCL-II Cryomodule Commissioning in LERF

support cryomodule production testing and qualifications Main Goals for LCLS-II First and foremost support cryomodule production testing and qualifications expedite production and help maintain an aggressive schedule A.Ratti, J. Schmerge, Transition to Operations Review: LSCL-II Cryomodule Commissioning in LERF

Other benefits to LCLS-II and its personnel Testing and integration of all LCLS-II Electronics and Controls for two cryomodules Similar setup to L1 Gain experience, complete integration Learn CM testing with LCLS-II Hardware Integrate cavity measurements and testing infrastructure in place at CMT* facilities A.Ratti, J. Schmerge, Transition to Operations Review: LSCL-II Cryomodule Commissioning in LERF

Operating the LERF setup Funding from LCLS-II at SLAC does not include cavity/cryomodule testing and/or operations Troubleshooting and Support for running the systems in LERF will come from SLAC on an as needed basis as part of the development of each subsystem involved We are looking for funding to support training of SLAC staff in operating and testing SRF cavities and cryomodules A.Ratti, J. Schmerge, Transition to Operations Review: LSCL-II Cryomodule Commissioning in LERF

Questions A.Ratti, J. Schmerge, Transition to Operations Review: LSCL-II Cryomodule Commissioning in LERF