Facility for Research Instrumentation and Accelerator Development

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
RF Development for ESS at Uppsala University
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Superconducting Spoke Resonator Cavities and Cryomodules
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SCRF Activities at IPN Orsay Sébastien Bousson On behalf of the SCRF group Eurisol Net Meeting – CERN, 28 th June 2011.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Spoke Cryomodules (WP4) Guillaume OLRY (CNRS/IPN Orsay) WP4 Deputy Leader April 21, 2015.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
ESS cavities interfaces
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
TIARA PP TIARA Final Meeting 27 th November 2013 – Daresbury TIARA-PP WP 9 : TIHPAC TIARA-PP WP 9 : TIHPAC Test Infrastructure for High Power Accelerator.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Superconducting RF: Resonance Control Warren Schappert PIP-II Machine Advisory Committee 10 March 2015.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
Spoke Cryomodules Sébastien BOUSSON (IPNO), Christine DARVE (ESS) On behalf of the CNRS/IPNOrsay and ESS teams April, 2016.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Cost Optimization Models for SRF Linacs
CERN – Zanon discussions
Cryomodule test stand at ESS site
Test of the dressed spoke cavity
WP5 Elliptical cavities
T5.2: Harmonization - Material and Component Reference
Uppsala Commitment to ESS and FREIA Planning
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
WG-1 Session Cavity Performance Cryomodule Performance
Tuner system Zhenghui MI 2017/01/17
Access to radiofrequency testing facilities
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
ESS RF Development at Uppsala University
XFEL cavities and cryomodules measurements at AMTF
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
Resonance Control for Narrow-Bandwidth, SRF Applications
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
FRIB summary of performance degradation - VTA to cryomodule
First High Power Test of the ESS Double Spoke Cavity package
Cryomodules Challenges for PERLE
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
The spoke CM tests at FREIA
Prototype cavities development
ERL Director’s Review Main Linac
(vertical cryostat, Gersemi)
Uppsala University - The FREIA Laboratory
Presentation transcript:

Facility for Research Instrumentation and Accelerator Development Status of tests for ESS Tord Ekelof Trieste 3 October 2018 FREIA Laboratory Facility for Research Instrumentation and Accelerator Development

“HNOSS” Horizontal Cryostat HNOSS = Horizontal Nugget for Operation of Superconducting Systems Test of superconducting cavities/devices 3240 x ø1200mm inner volume up to two cavities simultaneously, each equipped with helium tank, Low or High power RF testing fundamental power coupler (top, bottom, side) (cold) tuning system Operation in the range 1.8 to 4.5K.

SRF Test Activities Hélène single spoke cavity (IPNO) antenna, low power self-excited loop (SEL) RF calibration procedures Germaine double spoke (IPNO) antenna and cold tuner, low power cryogenics: cooling, heat load LLRF, SEL Q0, gradient, microphonics Romea cavity package (IPNO) power coupler and tuner, nominal gradient Q0 and gradient, microphonics, fill time, Lorentz force detuning (LFD) tuner operation RF Station 352 MHz (2x) acceptance and functional test including RF distribution components soak test pulsed and CW operation on cavity RF Station 704 MHz acceptance & operation of modulator High-β elliptical cavity package (CEA) power coupler, tuner Q0 and gradient, micro- phonics, fill time, LFD LLRF/tuner operation ESS Cryomodules prototype, arrived August 2018