Flood Risk Management Plans schemas

Slides:



Advertisements
Similar presentations
June SLIDE 1 Copyright © 2011 International Swaps and Derivatives Association, Inc. FpML Spec HTML Documentation Improvements Proposal ® ISDA is.
Advertisements

Bob Sultan A further use of VID-learning March 2011.
CL2 Proposal #9: Mapping requirements to requisites.
ROI Tool interaction 1) Zoomify enterprise version.
Phase Difference = Phase Difference = 0.05.
LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Date: April 16, 2014.
And Together. Free your energies New XML schema and HTML report layout Daily Drilling Report Phase II.
1 Burns Beach near Brighton, Western Australia RPS has won a series of awards from the Urban Development Institute of Australia - including the Water Sensitive.
Sponsored by the National Science Foundation 1 March 15, 2011 GENI I&M Update: MD Objects and Descriptors Goals Architecture Overview –Process –Functional.
Learning Target: I can cite evidence from a text to explain the principals stressed in Washington’s Farewell Address.
PFRA reporting – Output from test phase FD Drafting Group, Meeting 16 February 2011 Mette Wolstrup.
Water Framework Directive WISE Items on which to report progress oFinalising schemas for 2005 reporting oDevelop WISE Web site for 2005 oDevelop.
Pål Rylandsholm 16 June 2009 DRAFT DDR Phase 2 Status EPIM RUF meeting June 16th 2009.
网上报账系统包括以下业务: 日常报销 差旅费报销 借款业务 1. 填写报销内容 2. 选择支付方式 (或冲销借款) 3. 提交预约单 4. 打印预约单并同分类粘 贴好的发票一起送至财务 处 预约报销步骤: 网上报账系统 薪酬发放管理系统 财务查询系统 1.
Free Read Friday 9/19. Agenda Read!!!!!! (30 minutes) Reading Log Work End Goal: Become more familiar with your taste in books and be able to apply class.
Stakeholders Meeting High-Level Update on the Forthcoming Consultations Incorporating ComFrame Text with Revised Insurance Core Principles (ICPs) La.
TGn Editor Report Jan 2009 Date: Authors:
Tools for reporting on MSFD Art 11 monitoring programmes
Larry Bugh ECAR Standard Drafting Team Chair January 2005
Larry Bugh ECAR Standard Drafting Team Chair January 2005
Flood Hazard and Risk Map
Assessment of 1st FRMPs and 2nd RBMPs
Updating of the Reporting Guidance for the Floods Directive: Context
How to Write an Annotated Bibliography
Methodology for the assessment of 1st FRMPs and 2nd RBMPs
Vignette Two Brainstorming Guide
Assessment of 1st FRMPs and 2nd RBMPs State-of-play
Violation Risk Factor (VRF) Tool Update March, 2010
Timing and delays.
Update on the status of RBMP reporting
3a. Status of the 2012 interim report on the implementation of POM
WISE map viewer for PFRA/ASPFR
Children’s Hospital Update
Public Health Statistics WG
WGF Sub-group on Reporting Progress report
Agenda 10/23/15 Text Effect Project: : 2 Text Effect tutorials. See next slide. See website links for tutorials. Work on your Semester Project: 2 Photoshop.
Daily Drilling Report Phase 2
2. Presentation of the reporting tools
Indicator common structure
A way to keep up with Complicated Character Relationships
Update on RBMP&FRMP adoption and reporting Assessment of RBMP&FRMP
Summary and Action Points
Summary and action points 1-2 March 2017 Brussels
Article 13 RBMP reporting testing 2009
Next Steps Advisory group debrief call Circulate meeting summary
2a. Status of WFD reporting
Timetable Phase Date Collect feedback from MS on options 1, 2 and 3 presented by the EC (reporting 1b WFD-related measures for MSFD). 21 February Separate.
Flood hazard maps and Flood risk maps (Guidance and Schema)
2b. Status of WFD reporting
Assessment of 1st FRMPs and 2nd RBMPs State-of-play
Health Risk Assessment
Summary of WISE electronic delivery
7. Management of reporting for 2012
9th meeting of the Floods Working Group
Workshop commissioning Installation Coordination at ESS
Update on the status of RBMP reporting
3C. Update of Summary of WISE electronic delivery
Common Understanding Way forward
Flood hazard maps and Flood risk maps – next steps
Legal and implementation issues update
Floods Directive : Transposition checklist update
Reporting of Preliminary Flood Risk Assesment
PFRA reporting – Output from 2. test phase
9th meeting of the Floods Working Group
Agenda 10/19/15 Symbolic Color Critique Photoshop Skills to Learn:
6th Grade Language Arts Mrs. Piner 16-17
Agenda 10/21/15 Photoshop Skills to Learn:
AIXM – Work in Progress AIXM CCB – Webex, 14 MAR 2014.
WISE Working Group D September 2009, Brussels Jon Maidens.
IE04 Weekly Progress Report 2018/10/17 Team: xxxx
Presentation transcript:

Flood Risk Management Plans schemas Agenda point 6a WGF, 17.10.2013 Mette Wolstrup Mette.Wolstrup@atkinsglobal.com

Status of FRMP First draft of FRMP schema presented at Floods Drafting Group in March 2013 Review of second draft in July/August 2013 Minor changes from IE, UK, IT:

Changes after review period SummaryCoordination changed to be optional with an indication in the annotation text that this is conditional, hence should be reported if an international UoM is reported The daughter fields under ResponsibleAuthorities are changed to optional but with an annotation text explaining that at least one should be reported The element StatusofImplementation changed to ProgressofImplementation SummaryFloodExtent and SummaryConsultation changed to include up to 100.000 characters SummaryCostBenefit made optional Changed order of values in FDCommon list 'PriorityCategories'

Next step FRMP updated and tools to be developed Test phase to be planned – volunteers?

Questions ? helpdeskWISEreporting@atkinsglobal.com