East Hall under construction

Slides:



Advertisements
Similar presentations
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Advertisements

For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
The Next Generation of a Gamma Irradiation Facility GIF++
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Teleconference ACS – FREIA 31th May 2017
Linac4-PSB 160 MeV connection readiness review
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
East Area Renovation Project Team meeting # 2 – EDMS News
Status, Schedule and EVM for the test facility project
Roadmap for triplet cryostats
Identification of the unused cables
Francois and Lau EATM 17 July 2012
East Hall under construction
Cryostat procurement, status and plan, QA/QC
LIU – EVM status and next steps
Configuration Management and Layout Database ELENA Project
Teleconference ACS – FREIA 10th May 2017
EC Activities Status for the LIU
YETS & LS2 Reminder G. Girardot 20 juin 2017.
4th FRC meeting, Antti Onnela, CERN-PH-DT
n_TOF “Draft” plans for YETS and LS2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Renovation of the 45-year old PS magnets
WPs concerned by L4 connection:
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
EN-HE L2 – PS – PSB – TT2 works during YETS
East Hall under construction
UK RFD Pre-Series cryomodule
East Hall under construction
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Impedance working group update
ELENA Magnet Installation Planning
Experimental Areas – LS2 planning
Prototype cryomodule development
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
Global Overview EA Deliverables for East Area Renovation
EA Deliverable Equipment for East Area Renovation
Aziz AMAMOU EACM – 21th May 2019
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
East Hall under construction
Overview of the TARGET Monolith Rough Vacuum
East Hall under construction
East Area Renovation Supply of control rooms b.157
East Hall under construction
Open Points and More… Giulia / Michael / Sebastien / Maria.
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
EA Equipment for East Area Renovation
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

East Hall under construction - 1962 EA Renovation project – Technical Review EN-EA Feedback from the first review East Hall under construction - 1962 S. EVRARD / EN-EA, 05-07-2019

SERVICES Shielding: Primary area: Bard and Sebastien to provide the tech. spec. within 1 month. Mixed area: Erwan to provide the tech. spec. within 1 month. Primary dump: offer received from PK, more expensive than framework contract, 6 months for delivery. 2 W blocks to be added. Shielding 352/157: re-use of existing shielding + some small bricks. Further look by integration team. Issue: logistics for concrete block storage in order to avoid unnecessary handling operations (Aboubakr, Erwan) Sealing solution for primary area roof to be investigated. Still not clear how to do this. A sample of material has been tested during this year -> to analyze. Also to prospect with Aymeric’s contractors if they could propose solutions. Erwan is in charge.

SERVICES B251 false-floor: DR launched (180 kCHF) via DO and external company (not via framework contract). EA will dismantle the existing false- floor structure (and cables trays for re-use) and SMB will reinstall the new one in September. Reinstallation on the critical path. Particular attention to pay on it. Also still pending a clarification/discussion of EL installation (estimated to 250kchf)-> impact of the design of the metallic structure.

SERVICES Gas service: Cabling service: Dismantling services: Prefabrication can start: panels,… Issue: ATEX plan must be compliant to current design Cabling service: Patch panels: 20 kCHF per pair. See NA standard, and make an NA REX (retour sur experience) with users (Nikos). Start patch panel manufacture asap before cabling period end of 2020. Dismantling services: Primary area will be cleaned by Nuvia, offer update according to quantities, not to hourly rates (Aboubakr in charge via Aymeric)

Vacuum Use of all the remaining stock of beam pipe, which will cover mainly the primary beam lines. New orders needed for 15x6 m long DN159 and 14 pumps (Serbia in-kind to be investigated) and associated electrical cabinets (12 units, Philippe involved). Hippodrome chambers: Victor in charge to make them built at the CERN central workshop. Giulia, Damien and Emile to provide Victor with drawings of the 13 hippodrome chambers. Controls by TE-VSC: all is OK, pump power supply cables to be checked (in DICs) + design (local connection cabinets or not  Michael to decide through integration meetings).

Magnet supports 3D models almost completed. 2D drawings could be prepared by our design office or MME as an alternative. Complete file to be prepared by Damien and Giulia for Victor to organize the manufacture in the EA workshop. Approval of the design by MSC: Control 1 via D. Gerard to get MSC approval prior to manufacture. The beam yellow support on F61 could be send to b.109 for cut. Inventory of universal support to be organized to see if we need to produce others or not.

Other Beam line equipment XCET 4 bodies and support to be recuperated. Aymeric in charge of the overall technical specification. Beam window (withstanding 15 bars) to be optimized (carbon type to be considered): Serge and Miguel to help with the design of this window. Urgent issue on the critical path as the first XCET will be installed in just one year time (May 2020). Collimator 4 blocks spare available but needing refurbishment. No real experience with this type of collimator: Action: start dismantling one asap (Victor with FSU and benefitting from experience acquired by Emile) 2 blocks: one XCSH to be manufactured from scratch via the central workshop. Start doing asap the 2D drawings for the TCX (action EA design office). XCON and XSCI New scintillator XSCI requested by BI or T10 depending on the space available (should be confirmed by Integration team, Damien). XSCI can be prepared as from now. Aboubakr for design and tech. spec. for XCON and Victor and workshop for refurbishment. Wire and Ionization Chambers No change foreseen. Gas supply for XWCM, to be checked with David if included in his WP. (Michael) New XION requested for Irrad/CHARM: possible but to be funded by R2E. (discuss with Ruben and Salvatore). XBPF: order launched for 3 new tanks (4 XBPF in total but one existing tank ), universal support to be prepared. Open questions: BLM: 15 units requested (8 for replacing 2 telescopes around the targets and 7 for primary beam lines: meeting to be organized with BI, OP and EA (action Michael))

List of actions (1) Who What Deadline Comment Sebastien Organize CSR3 End 19 Should integrate MTP decisions Bard Tech Spec for concrete beams for primary area May 19   Erwan Tech Spec for concrete/steel beams for mixed area Michael Tech Spec for primary dump Done, EDMS1884719 Organize meeting for BLM Johannes Second XION in IRRAD June 19 Discussion with Salvatore and Ruben Check with David for gas supply XWCM Damien Confirm possible second XION on T08 Aboubakr Technical spec XCON Emile Start dismantling 4 block collimator Prepare production of 2 block collimator outside Design office 2D drawings of TCX

List of actions (2) Who What Deadline Comment Aymeric Choice of window of XCET June 19 Tell Serge and Miguel to propose a design Fabrication of chambers XCET October 19   Giulia/Damien Complete file with list of magnet support and parts to be produced Send to Victor to have a quotation Aboubakr Technical spec control rooms Jan 2020 Giulia/Damien/Emile Finalize complete list of vacuum components for Victor Victor/Emile Start procurement vacuum pumps and valves Giulia Prepare priority file for equipment and supports Next review

Objectives of this review Define precisely our make or buy plan for EN-EA deliverables What should be delivered ? Who is responsible for the component/service ? When is it required ? Where will it be installed ? How will it be produced (@ CERN, external company) ? How much will it cost ? Establish a baseline for next reviews (every 2-3 months) Define synergies with EA Equipment master plan Get manufacture started asap