Introduction WG2 Martina Martinello, Oliver Kugeler TTC Meeting 2019.

Slides:



Advertisements
Similar presentations
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
Advertisements

Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Lutz Lilje DESY -MPY- Summary of the Superconducting RF WG DESY -MPY Overview on talks given List European Assets.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Annual Meeting CERN - November 2005 Bernard V ISENTIN.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
WG2 discussion Conveners: G. Ciovati, D. Kostin, Y. Yamamoto.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Vertical Electro-Polishing activities at CEA Saclay
Status of the M-ECCTD F. Peauger - P. Bosland
CERN – Zanon discussions
Field Emission Minimization for LCLS-II
ILC10 Beijing Global Design Effort
SRF summary accelerator WG
WP5 Elliptical cavities
Juliette Plouin, Enrico Cenni, Olivier Napoly (CEA)
at STFC Daresbury laboratory
ILC-SCRF Test Facilities considerations
Summary of WG2: Design and Fabrication of Cavities and Cryomodules
WG-1 Session Cavity Performance Cryomodule Performance
TTC - JLab - Bob Laxdal - TRIUMF
Definition of work flow for string DESY Example on critical operation
ILC Cavity & Cryomodule Overview
A. Yamamoto, S. Michizono, and B. List
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
BriXS – MariX WG 8,9 LASA December 13, 2017.
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
TTC High Q0 Working Group Summary of developments since last TTC meeting C. Reece.
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
LCLS-II CM Ambient Magnetic Field Management
Future Thin Film Deposition Efforts at FNAL
HIE-LINAC status report
LCLS-II High Q0 Cavities: Lessons Learned
Cavity Treatment for High Q0 in Realistic Magnetic Fields
Cryomodules Challenges for PERLE
Report of TTC-TB meeting at INFN-Milano
TTC meeting at Milano, 2011' Feb. .28
Surface resistance studies as a function of the mean free path
Peng SHA, On behalf of CEPC SRF group
Welcome & Introduction
SRF Science and Technology
Magnetic Field Sensors and Measurements in Cryomodules
Report of TTC-TB meeting at TRIUMF, UBC
Cool Down Studies of LCLS-II Cryomodules
Presentation transcript:

Introduction WG2 Martina Martinello, Oliver Kugeler TTC Meeting 2019

WG#2: Cold test diagnostics and novel processing methods Introduction to WG2 WG#2: Cold test diagnostics and novel processing methods This working group is asked to consider two main topics. The first topic is to discuss the various cold test diagnostics both installed in vertical and horizontal test facilities but also in working cryomodules. A second topic is to discuss new ideas in the field of cavity processing. Topics to include: Magnetic field measurement and mapping Temperature measurement and mapping 2nd sound quench identification Field emission radiation monitors Coupler protection In-module diagnostics Green surface polishing Vertical EP Plasma processing (TEM mode cavities, CMs) Use of robotic engineering and assembly Martina Martinello, Oliver Kugeler | TTC Meeting 2019, Vancouver

Introduction to WG2 Field emission diagnostic Coupler protection Session 1 (Tuesday Feb 5th, 11-12.30am) Field emission study on cERL main linac cryomodule (Kensei Umemori, KEK) Field emission studies for ESS prototype cryomodules and vertical test diagnostic (Enrico Cenni, CEA Saclay) Plans for beam-loss and field-emission detection in LCLS-2 (Alan Fisher , SLAC) Overview on coupler protection (Tom Powers, Jlab) Session 2 (Tuesday Feb 5th, 2-3.30pm) Robotic High Pressure Rinsing of Complex Geometry SRF Cavities (Joe Whaley, MSU) The use of robotics in cavity preparation and assembly procedures (Stephane Berry, CEA Saclay) Plasma cleaning development for LCLS-II cavities (Bianca Giaccone, Fermilab) T-mapping, B-measurements and vertical diagnostics at Cornell (Ryan Porter, Cornell University) INFN-LASA experience on vertical cold test diagnostics (Carlo Pagani, INFN-LASA) Field emission diagnostic Coupler protection Robotic engineering and assembly Plasma cleaning Vertical test diagnostic Martina Martinello, Oliver Kugeler | TTC Meeting 2019, Vancouver

Introduction to WG2 Vertical test diagnostic In-module diagnostic Session 3 (Tuesday Feb 5th, 4-5.30pm) Combined magnetometric and thermometric characterization of a TESLA type cavity cooled down in an external magnetic field (Oliver Kugeler, HZB) Transition Edge Sensors for Thermal Mapping as a diagnostics tool on bulk Niobium SRF Cavities (Giovanna Vandoni, CERN) Magnetic field sensors and measurements in cryomodules (Genfa Wu, Fermilab) Three Axis Helmholtz coil Configuration for Flux Trapping Studies at TRIUMF (Andrew Cote, UBC/TRIUMF) Magnetic Field Diagnostics at the DESY Vertical Test stands (Marc Wenskat, DESY) Session 4 (Tuesday Feb 5th, 11.30am-1pm) HF-free bipolar EP - progress unraveling the mechanism and optimizing for multi-cell cavities (Charlie Reece for Hui Tian, Jlab) Cavity etching via rf Ar/Cl plasma (Jeremy Peshl, ODU / Jlab) Green processing of cavities via vibro-tumbling (Cristian Pira, INFN Legnaro) Vertical EP and green EP progress at Cornell (James Maniscalco, Cornell University) EP Developments at TRIUMF (James Keir, TRIUMF) Vertical test diagnostic In-module diagnostic Green surface polishing Vertical EP Martina Martinello, Oliver Kugeler | TTC Meeting 2019, Vancouver