JLEIC Accelerator R&D Meeting Reorganization Feb. 8, 2017
Working Groups/Collaborations Short Reports IR / non-linear studies (Vasiliy Morozov, Guohui Wei) Ion and electron Polarization (Vasiliy Morozov, Fanglei Lin) Ion injector complex / parameter development (Todd Satogata) Cooler design (Steve Benson) Cooler e-source (Riad Suleiman) Simulations/Instability (Yves Roblin, Rui Li) SRF / Fast kicker (Bob Rimmer) Crab cavity (Jean Delayen) Engineering (Tim Michalski) Super-ferric magnets (Peter McIntyre) Ion linac (Brahim Mustapha) MDI / Detector Backgrounds (Mike Sullivan/Rik Yoshida)
New R&D Meeting Plan Updates by two working groups/collaborations Each report up to 15 min, total 30 mins Up to two full-length technical presentations Each presentation 45 to 60 min total 1.5 to 2 hours whole meeting 2 to 2.5 hours 12 progress reports will take 6 weeks to complete. This is about right We will start about one month from now: