Open Points and More… Giulia / Michael / Sebastien / Maria.

Slides:



Advertisements
Similar presentations
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
Advertisements

LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
MKE4 Rearrangement -Updated Drawings -Visit to ECA4 -Visit to LSS4 -SPS Safety File -Safety during intervention MKE4 Rearrangement - TCM 25 August
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Electrial Safety LS2 days November 2016 AP
NEW EN-EL SPECIFIC DATA IN PLAN 08/02/2017
Linac4-PSB 160 MeV connection readiness review
Test beam check list Michael JECKEL EN-EA-EC.
East Area Renovation Project Team meeting # 2 – EDMS News
Cabling for LHCb Upgrade
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Identification of the unused cables
BE-ICS Activities during the LS2 Period (15 min)
LIU Wire Scanner Milestones June 2017
Naming convention and layout database for the East Area
TE-MPE LS1 review Vision from EN-EL(CF)
LIU – EVM status and next steps
LHC Experimental Vacuum Systems Status October ‘07
EC Activities Status for the LIU
East Area Renovation Project team #6 Launch safety agreement
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
YETS & LS2 Reminder G. Girardot 20 juin 2017.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Layout Drawings and Mechanical Assembly Drawings
n_TOF “Draft” plans for YETS and LS2
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Diffuser status October 2017
EN-HE L2 – PS – PSB – TT2 works during YETS
Status with crucial LSS5 kicker transmission line cables
BE-CO Activities for PSB
East Hall under construction
GIS Portal Racks Project
Experimental Areas – LS2 planning
ThomX – Commissioning Meeting – 25/01/2018
EA Deliverable Equipment for East Area Renovation
LIU-SPS review for BI (no BWS)
East Hall under construction
East Area Renovation Supply of control rooms b.157
East Hall under construction
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
EA Equipment for East Area Renovation
WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)
WP15 budget changes linked with Matching Section
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

Open Points and More… Giulia / Michael / Sebastien / Maria

DUMP Offres trop conséquentes : design à revoir (objectif -> réduction de la masse). 5 July 2019 EA Equipment Review

DUMP – New Design Idea Present design too expensive Full cast iron block with line passage T T09 T10 New proposition: cast iron block 400x400 mm + standard shielding T09 T10 400 x400 mm 5 July 2019 EA Equipment Review

Rail-mounted shielding for beam dump Proposition RP to close the beam line with a “guillotine“ shielding to protect personnel from radiation during interventions.  First preliminary design 5 July 2019 EA Equipment Review

Patch panels & Trunk Cable Zone Exp. Step 0 (Ensemble of Patch-Panel installation) – Action EAR: Clarification of needs of physicists in order to… Install a patch-panel which will accommodate the physicists’ requirements. Make an intelligent use of budget. Step 1 (Patch Panel procurement) – Action EN-EA-AS Mechanical plans already available (designed by Emile Grospelier) Procurement of Patch-Panel Step 2 (Cable Pulling) – Definition of request → Send it to Maria P. Provide the functional positions (tenant/aboutissant) in a Machine Layout (2D Plan) of East Area. Create the DIC indicating type, quantity and length of cables (EDMS 1210369 v.3) Patch-panel installation under which Project? PLAN? Ultimate deadline? Step 3 (Cable Pulling) – Interaction between EN-EA-AS and EN-EL-FC (for the cable pulling) Creation of ticket SNOW directed to Simao Machado (SL EN-EL-FC) Simao Machado assesses the feasibility of cable pulling by his team in function of their intervention planning Delegation of cable pulling (EN-EL or EN-EA) with contractor COMSA following the Codes Bordereaux Reception of quotation Step 4 (Connectivity) – Action EN-EA-AS Procurement of connectors Assembly of connectors billed by time spent Test billed by time spent SCEM 09.41.25.170.7 SCEM 09.41.25.100.1 5 July 2019 EA Equipment Review

Salle de contrôle pour zone test T9, T10,T11 Planning for installation Process Quotation from STIC: 150kCHF Task Name Baseline Duration Start Install new control rooms 3 wks Fri 10/07/20 Start specification September 2019 (4 month) Comments and validation (HSE etc.) (2 month) Materials/planning preparation of factory (3 month) Backup Access, authorization etc. (1 month) delivery and installation >200KCHF, DR 5 July 2019 EA Equipment Review

Open Points Second XSCI on T10 requested by BI Integration updated New XION requested by IRRAD on T08 ??? Discussion with R2E people needed BLM: 15 units requested (8 on target area and 7 on primary area) meeting needed with BI OP and EA Document needed from OP with POSITION, ORIENTATION and HEIGHT Contact: Solve Thorkildsen Slettebak BE-OP-PS ECR F61 line  comments integrated waiting for inputs on BLM, to be circulated and approved soon 5 July 2019 EA Equipment Review

Thank you!