EA Renovation Project – Project Team 29 – 28 June 2019 NEWS

Slides:



Advertisements
Similar presentations
L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
CBM Superconducting Dipole Magnet
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
TS, Length of YETS EYETS LIU & CONS Project
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Status of n_TOF Facility
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
ELENA Integration F. Butin / ELENA collaboration.
Project Management PTM721S
East Hall under construction
Chapter 3 Project Management. Chapter 3 Project Management.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
East Area Renovation Project Team meeting # 2 – EDMS News
Making Difficult Decisions in a Transparent Way –
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Review of the Machine Protection System in the PS complex
Francois and Lau EATM 17 July 2012
East Hall under construction
Naming convention and layout database for the East Area
Safety Documentation EHN1
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
LIU – EVM status and next steps
East Area Renovation Project team #7 News
EC Activities Status for the LIU
Lead bricks painting General procedure and its practical application
East Area Renovation Project team #6 Launch safety agreement
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
Status of the PANDA Magnet
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Target and Horn status report
Elena Wildner, CERN EUROnu meeting Paris June
East Area Cooling & Ventilation Status
Francesco Forti University and INFN, Pisa
East Hall under construction
East Hall under construction
Experimental Areas – LS2 planning
The Bunker Project Overview Zvonko Lazic
LIU-SPS review for BI (no BWS)
East Hall under construction
East Area Renovation Supply of control rooms b.157
East Hall under construction
Safety in the East Area Renovation Project
East Hall under construction
Open Points and More… Giulia / Michael / Sebastien / Maria.
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

EA Renovation Project – Project Team 29 – 28 June 2019 NEWS East Hall under construction - 1962 EA Renovation Project – Project Team 29 – 28 June 2019 NEWS S. Evrard – EN-EA, on behalf of the Project Team https://edms.cern.ch/document/2113548/0.1

Agenda Budget Technical and safety review on beam line shielding TDR Monday, October 28, 2019Monday, October 28, 2019 PT29

Material budget update (MTP 2019) Before MTP 2019: 21.767 kCHF ( + 887 kCHF M2P,  22.654 kCHF CtC) MTP: additional request 3,320 kCHF Granted : 2,669 kCHF OFEN incentives: requested 1,600 kCHF Granted: 796 kCHF (as not yet available, not included in M budget right now) After MTP 2019: 24.436 kCHF Reprofiling just completed and sent to all GL’s involved.

Budget situation on 25.06.19 Too much commitments for 2019 Could block future orders Adjustment in progress Monday, October 28, 2019Monday, October 28, 2019 PT29

Tech&Safety review #1 Explain the problem in details Current shielding design exceeds admissible ground loads Discuss et clarify issues Propose possible solutions Or at least identify a way to progress towards some solutions Monday, October 28, 2019Monday, October 28, 2019 PT29

Introduction : Maximum permissible load in b.157 (2)5.5 t/m2 (2)From Raul Fernandez (SMB-SE) calculations (1)30 t/m2 (1) From the construction drawings (1)1 t/m2 47m 113m E. Harrouch, 27-06-2019

Introduction : Shielding before and after LS2 PS B.157 Before LS2 PS B.157 After LS2 E. Harrouch, 27-06-2019

Integration Constraints Courtesy E. Iliopoulou , R. Froeschl 27/06/2019 RP EA Shielding Design – EDMS 2175579

Shielding Design Drivers Beam loss in PS Secondary beams Standard primary beam to T9 and T10 targets Accidental beam loss to CHARM Courtesy E. Iliopoulou , R. Froeschl 27/06/2019 RP EA Shielding Design – EDMS 2175579

Shielding Design Status Finished CLOUD beam Pipe feed-through Minor verifications Open points Roof shielding Ventilation Station platform Courtesy E. Iliopoulou , R. Froeschl 27/06/2019 RP EA Shielding Design – EDMS 2175579

Tech&Safety review #1: outcome Identify critical areas Optimize load distribution Relocate loading areas (avoid the technical gallery) Optimize mixed area shielding (include magnets in simulations) Consider local reinforcement (technical gallery) Consider load & destructive tests (assess concrete composition) Appeal to Geotechnics company Define acceptance procedure Assess seismic response Propose CERN-wide guidelines (create database) Monday, October 28, 2019Monday, October 28, 2019 PT29

TDR Full review by our Editorial Board Still some fine tuning Approval by groups during July Monday, October 28, 2019Monday, October 28, 2019 PT29

Meeting schedule in 2019 01/02/2019: Project Team #26 22/3/2019 : Project Team #27 10/5/2019 : Project Team #28 28/6/2019 : Project Team #29 26/7/2019 : TBC 23/8/2019 : TBC 27/9/2019 25/10/2019 22/11/2019 Monday, October 28, 2019 PT29

Thanks for your attention ! Monday, October 28, 2019Monday, October 28, 2019 PT29