WP13 outsourcing: Hollow Electron Lens

Slides:



Advertisements
Similar presentations
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Advertisements

F. Savary on behalf of the WP11 team Input from V. Baglin, D. Ramos.
Gaussian TEL gun progress V. Kamerdzhiev, G. Kuznetsov, V. Shiltsev LARP Collaboration Meeting 10 Danfords on the Sound, Port Jefferson, NY, April 23-25,
Hollow Electron Lens Update
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Giovanni Ciavola, JRA-07 ISIBHI JRA-07 Ion Sources for Intense Beams of Heavy Ions (ISIBHI) EURONS PCC Meeting, Groningen, Holland, December 2006.
Lab. Director’s Meeting IHEP, Protvino, Russia, January 2008 D. Reistad, The Svedberg Laboratory, Uppsala University.
Developments of the FETS Ion Source Scott Lawrie.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
CEBAF Polarized Electron Guns Marcy L. Stutzman for the Jefferson Lab Polarized Source Group.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.
ELENA installation progress F. Butin / ELENA collaboration.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
Ion Run 2015: measurements in cells 11 for P1 and P5 P–Ion Run 2016: analysis of cell 8 for P1, P5, P2 and P8 Corinna Martinella EN-EA R2E-MCWG 04/07/2017.
Beam-Gas Curtain (BGC) profile monitor tests in the LHC
R&D program on e-lenses and BBLR-compensation
LIU – EVM status and next steps
AFC 2017 (and 2018) AFC timeline:
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
HL-LHC IT STRING and Series test of SC link
Beam diagnostics from GSI
11 T Dipole Integration & Plans M. Karppinen
AD Horn upgrade HV generators
Status of the CLIC DR wiggler design and production at BINP
Installation of an Instrument on a CERN machine
LEP cryostat Procurement strategy and plans
HEL – Safety aspects Christelle Gaignant
LIU – EVM status and next steps
Configuration Management and Layout Database ELENA Project
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
on behalf of the RF group
Advanced collimation design studies (TCT with wire, hollow e lens)
Looking back on 2014 and Perspectives for the MPE Group in 2015
HEL design, magnet system, e-beam generation and disposal
M. Alcaide Leon, Paolo Fessia
ELENA – Electron Cooler
Comparison between 1) HL-LHC BASELINE: Q5 at point 6 at 1
M. Alcaide Leon, Paolo Fessia
“Electron cooling device in the project NESR (FAIR)"
e-lens Readiness Review Introduction
TE-ABT Activities for LS2
M.Jonker CTC MPO-WG status
Hollow e- lens, Cryogenic aspects
Additional ancillaries for the operation of the Hollow Electron Lens
ELENA electron cooler and SEM grids status
MPE main activities planned for LS2
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Renovation of the 45-year old PS magnets
Adriana Rossi, Sergey Sadovich
Cryogenic Risk Assessment in LHC
Beam-Gas Jet profile monitor for the e-lens
Beam-Gas Curtain (BGC) profile monitor: Project Overview and Status
Rhodri Jones (CERN BEAM INSTRUMENTATION GROUP)
Update on beam screen with shielding and other vacuum issues
Polarized Source: Recent Activities
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Implementation of RP training ranks in SPS and NA_target
Project management Ray Veness.
ThomX – Commissioning Meeting – 25/01/2018
List of IPAC19 papers with reference to HL-LHC
Production Cryo HL-LHC BPMs
Radiation Working Group RADWG
AD Electron Cooler Consolidation Review
Outsourcing for the BGC
CERN-FAIR Steering Committee
Presentation transcript:

WP13 outsourcing: Hollow Electron Lens A. Rossi – presentation to the WP13 meeting on 27th May 2019

D. Perini, 8th HL-LHC Collaboration Meeting, CERN, 15-18 October 2018

Scandia-doped cathode Electron beam generated by hollow cathode Thermionic cathode electron emission T - activated cathode anode control electrode FNAL e-gun design with scaled electrode dimensions Courtesy of G. Stancari G. Gobbi, 8th HL-LHC Collaboration Meeting, CERN, 15-18 October 2018

Gun: (1 prototype built/tested at CERN)   Gun: (1 prototype built/tested at CERN) Production 4-6 months from beginning-mid 2021 Tests at BINP Tests at CERN test stand if deemed necessary BE-BI BINP Vacuum chambers and mechanical structure Production 6-8 months Vacuum tests at BINP Blackening at CERN TE-VSC Collector: (1 prototype built/tested at CERN) Production 6 months from mid-end 2021 Test at BINP BE-BI BINP Beam diagnostics BLM BPM (1 prototype built/tested at CERN) BGC 1 prototype to be tested at CERN 1 interaction chamber at BINP or CERN for tests BE-BI & ??? BE-BI + Russia BE-BI + BINP BE-BI + Uk Modulator: since PC are at CERN I would make it here Design can start in 2020, 1 – 2 y Production Tests at CERN test stand (with prototype gun and collector) BE-ABT Power Converters (for magnets and HV system) at CERN 2y from end of LS2 TE-EPC Magnetic system (winding, cryostat and support/feet): Production 1.5 – 2 y starting from end 2021 – beg. 2022 Tests at CERN (SM18 or BINP ?) TE-MCS Magnetic measurements at CERN TE-MCS + BINP@CERN Quench protection / energy extraction TE-MPE Final assembly at CERN CERN (TE-VSC, BE-BI, EN-SMM, ?) + BINP@CERN Interlock (HV system and interlock tested at E-Lens Test stand) TE- EPC/MCS Installation and commissioning in the tunnel CERN: EN-HE BE-BI:EA,ML,BL,BP + FSU EN-SMM TE-CRG TE-MCS ? BINP team @ CERN