Update on IR7 Layout for a Crystal Collimation System with 8 Crystals

Slides:



Advertisements
Similar presentations
FLUKA studies: channeled ions on LHC IP7 L. Lari (CERN & IFIC (CSIC-UV)) D. Mirarchi (CERN & ICL) A. Lechner (CERN) ColUSM#32 December the 6 th,
Advertisements

Simulation priorities for 2015 R. Bruce for task 5.2.
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
Elastic Curves of Beams. Basic Equations for Beam Deflection.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
T-980 Crystal Collimation Recent Results T-980 Collaboration: FNAL, SLAC, BNL, CERN, PNPI, IHEP, INFN D. Still CM14 April 27, 2010.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
Off-momentum tail scraping for passive abort gap cleaning (MD 444) D. Mirarchi, R. Bruce, S. Redaelli On behalf of the LHC Collimation Team LHC Study Working.
H8-RD22 Experiment to test Crystal Collimation for the LHC Organized by: Walter Scandale Conducted at CERN Geneva, 27 September 2006 Participants included:
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
Background Simulations for the LHCb Beam Condition Monitor Overview: ● The LHCb Beam Condition Monitor (BCM) – Purpose, Design and Function – Implementation.
SPS UA9 data taking run with LHC-type Goniometer 31/07/2015 – Collimation Upgrade Specification Meeting #60 Roberto Rossi Daniele Mirarchi, Stefano Redaelli,
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
G4Beamline Simulated Electron Distribution within the HPRF Cavity 2/15/20121.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
LHC Crystal MD 22/09/2015 – LSWG #7 R. Rossi for the LHC Collimation team and the UA9 Collaboration.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
LHC off-momentum collimation simulation Hector Garcia Morales Royal Holloway University of London Roderik Bruce, Danielle Mirarchi, Belen Salvachua, Kyrre.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Beampipe design F.Raffaelli G.Calderini, M.Marchiori, M.Mazur, E.Paoloni Framework for Geant4 Interaction Region simulation.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Tracking simulations – where we are and what needs to be done R. Bruce on behalf of task 5.2.
Collimation Activities during EYETS
Floating MD week 28 summary
T980 STATUS AND CHANGES FOR
Bending crystals for magnetic and electric dipole moment measurements
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
Update of the SR studies for the FCCee Interaction Region
Review on collimator movement with stepping motors
The Interaction Region
Update on loss maps for input to energy deposition studies
Fast losses at collimators during 16L2 dumps
Results from crystal H on Beam 2
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
The 11T cryo-assembly: summary of design and integration aspects
Energy deposition studies in IR7 for HL-LHC
The PEP-II Interaction e+e- Factories Workshop
Hall C Down Stream Beam Pipe And Dump Interface Design
Beam collimation for SPPC
Update of the impedance of new LHC experimental beam pipes
Review on collimator movement with stepping motors
Compensation of Detector Solenoid with Large Crossing Angle
see file “pap_crab_cavity.pdf” for more details
Why do BLMs need to know the Quench Levels?
HL-LHC operations with LHCb at high luminosity
Optics flexibility in IR3/7
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
SR Background Update for JLEIC
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

Update on IR7 Layout for a Crystal Collimation System with 8 Crystals M. D’Andrea, D. Mirarchi, S. Redaelli 9 May 2019 M. D’Andrea

Motivation An ideal, complete crystal collimation system requires a total of 8 crystals: 4 per beam, 2 per plane, 1 for each side of the beam Present horizontal crystals are installed on the external side of the beam pipe, while vertical crystals are on top: the other side does not have enough room for the goniometer devices The ideal solution would be to have 2 crystals installed on to the same goniometer device: this however would require a complete redesign of the goniometer → perhaps possible in an optimised design without replacement chamber? Another option would be to have 2 crystals installed on separate goniometer devices: this would still require a redesign, although in principle less extreme The ideal longitudinal location of the crystals would be the same as the currently installed ones In case this is prevented by any constraints, nearby suitable alternative locations have been identified 9 May 2019 M. D’Andrea

Alternative crystal positions The positions on the currently installed horizontal crystals are different between the two beams due to constraints on the available slots The additional crystals can be installed on symmetrical positions on the other side of the beam pipe Crystal Slot B1H TCSM.D4L7.B1 B2H TCSM.A5R7.B2 Crystal Slot B1H TCSM.A5L7.B1 B2H TCSM.D4R7.B2 20 m upstream 20 m downstream TCSPM prototype would need to be removed The vertical crystals are installed on the same position on the two beams The additional crystals can be installed in the closest available slot Crystal Slot B1V TCPCV.A6L7.B1 B2V TCPCV.A6R7.B2 Crystal Slot B1V TCSM.A6L7.B1 B2V TCSM.A6R7.B2 8 m upstream 8 m upstream 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B1H injection 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B1H flat top 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B1V injection 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B1V flat top 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B2H injection 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B2H flat top 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B2V injection 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B2V flat top 9 May 2019 M. D’Andrea

Conclusions The integration of an 8-crystal collimation layout in IR7 was studied The additional crystals need to be installed on the internal/bottom side of the beam pipes, requiring a redesign of the goniometer devices The ideal longitudinal location of the additional crystals would be the same as the already installed ones, but suitable nearby alternative locations have been identified Question: do we need detailed tracking simulations? 9 May 2019 M. D’Andrea

Backup 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B1H injection Both crystals at the same location 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B1H flat top Both crystals at the same location 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B1V injection Both crystals at the same location 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B1V flat top Both crystals at the same location 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B2H injection Both crystals at the same location 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B2H flat top Both crystals at the same location 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B2V injection Both crystals at the same location 9 May 2019 M. D’Andrea

Trajectory of deflected halo: B2V flat top Both crystals at the same location 9 May 2019 M. D’Andrea