Wien filter 2 06/05/2019 Gabriel Palacios
Details Solidworks model CST simulations |E| Ey Ez Comparing 20 kV vs 40 kV feedthroughs
Solidworks model
Solidworks model This 40 kV feedthrough prevents us from having to change the pipe to the 1.5” OD that interferes with the coils. The Kovar recess measurements where “eyeballed”. The HV spring guide connector requires mods. 0.06” gap Between 1” OD and 0.75 OD insulator
Solidworks model The tip rounded could be removed to improve contact with feedthrough Kovar recess.
Solidworks model Modeled in Solidworks 40 KV Single Pin 21194-01-CF
Solidworks model Modeled in Solidworks Based on Electrical feedthrough CAD 32893-0020
CST simulations: electric field norm |E| 10 [MV/m] scale max
CST simulations: electric field norm |E| ~5 [MV/m] ~5.4 [MV/m] ~6.8 [MV/m] 10 [MV/m] scale max ~4.1 [MV/m]
CST simulations: electric field norm |E| 10 [MV/m] scale max 2.6 [MV/m] at cusp 2.5 [MV/m] at cusp
CST simulations: electric field norm |E| 5 [MV/m] scale max
CST simulations: electric field norm |E| 5 [MV/m] scale max
CST simulations: electric field norm |E| 5 [MV/m] scale max
CST simulations: electric field vertical Ey 3 [MV/m] scale max
CST simulations: electric field vertical Ey ~2.6 [MV/m] red region ~0.8 [MV/m] ~2.3 [MV/m] blue region 3 [MV/m] scale max
CST simulations: electric field vertical Ey 3 [MV/m] scale max ~2.7 [MV/m] at cusp 1.4 [MV/m] at red region -2 [MV/m] at blue region
CST simulations: electric field longitudinal Ez 5 [MV/m] scale max
CST simulations: electric field longitudinal Ez ~-3.1 [MV/m] 5 [MV/m] scale max ~-5.5 [MV/m]
CST simulations: electric field longitudinal Ez 5 [MV/m] scale max ~-1.7 [MV/m] at cusp ~-2.5 [MV/m] at cusp
CST simulations: electric field norm |E| ~5 [MV/m] ~10 [MV/m] red region ~5.4 [MV/m] ~5 [MV/m] ~6.8 [MV/m] ~4.3 [MV/m] ~4.1 [MV/m] ~5.2 [MV/m]
Fin