Wien filter 2 06/05/2019 Gabriel Palacios.

Slides:



Advertisements
Similar presentations
1/8 AND, OR and NOT b How many boys? b How many girls? b How many blue? b How many red?
Advertisements

- wire + wire D size battery Magnet wire coil magnets Paper clips Support board.
D. Lipka, MDI, DESY Hamburg, July 2012 Simulation of fields around spring and cathode for photogun D. Lipka, MDI, DESY Hamburg.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 20 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits and.
Field Emission Measurements with CERN DC-Spark System Tomoko MURANAKA Hebrew University / CERN.
Modifications Required on Model Before Meshing & Solving Slice up to define mesh in different areas –Transversely separate vane-tip region (about 16x16mm.
PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
Simulation of bow tie(two pair). With Gaussian plane wave excitation.
Simulation of Horn antenna. With Gaussian plane wave excitation.
RF fields simulations Alexej Grudiev, BE-RF 14/11/2013 Linac4 Ion Source Review, CERN.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
MKD stack upgrade MKD generator meeting Viliam Senaj 23/06/2015.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
W. Morse PEDM Review1 E/B PEDM R&D W. Morse 12/7/2009.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
CLIC Workshop – CERN, October / 17 DC breakdown experiments for CLIC CERN, TS-MME Antoine Descoeudres, Trond Ramsvik, Sergio Calatroni, Mauro Taborelli.
Simulation of trapped modes in LHC collimator A.Grudiev.
W. Morse PEDM Review1 Electric and Magnetic Fields W. Morse BNL.
Summary of the Electrical Feedthroughs. 2 SFT Channels for the 3x1x1 m 3 N. 6 cold + N. 6 warm on a D=222mm flange (each with 20x68pin connectors)
Trapped Modes in LHC Collimator (II) Liling Xiao Advanced Computations Department SLAC National Accelerator Laboratory.
EXAMPLE 1 Graph a system of two inequalities Graph the system of inequalities. y > –2x – 5 Inequality 1 y < x + 3 Inequality 2.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
M. Gilchriese Phone Meeting December 18, M. Gilchriese 2 PP1 Region Update “Bag” gas barrier Passive insulation? Region for external beam pipe supports?
HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.
Electrostatic FEA of the Ground Plane Features Bo Yu Sept. 14, 2015.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
RF Dipole HOM Electromagnetic Design
Bunching system for SPES project
Modelling of diagnostics for the ISIS ring
HO correctors update Massimo Sorbi and Marco Statera
Simulation of 200 MHz RF cavities. 11 cells preliminary results
33KV PLUG-IN TERMINATION AT GAYATHI D6624 PROJECT
TPC Support and Constraint TPC Support
Triple junction 'shed' optimization for the 200kv CEBAF gun upgrade
G. Palacios 02/25/18 E_y field as a function of anode vertical position for 200kV CEBAF gun upgrade G. Palacios 02/25/18.
Summary of the checking items of the Module-C design
Gabriel Palacios 03/15/17 Shed modifications Gabriel Palacios 03/15/17.
200 kV gun GPT simulations Tee, shroom and sphere catohdes
Simulation of Monopole modes trapped in LHC collimator
Simulation of trapped modes in LHC collimator
Gabriel Palacios 03/17/17 Danny’s Shed Gabriel Palacios 03/17/17.
I Alexander Nass for the JEDI collaboration
An Anticyclotron For Cooling Muons
Gabriel Palacios 08/12/ kV gun GPT simulations Tee, mushroom and sphere cathodes CEBAF beam parameters Gabriel Palacios
200 kV gun CST microwave studio simulations Shield modifications
Gabriel Palacios 08/13/ kV gun GPT simulations Tee, mushroom and sphere cathodes CEBAF beam parameters Gabriel Palacios
200 kV gun CST microwave studio simulations Shield modifications
Scaled Drawings 7.07 Execute Scaled Drawings
Gabriel Palacios 08/28/ kV gun GPT simulations sphere with long anode GTS beam parameters, Spacecharge ON Gabriel Palacios
Simulation of Monopole modes trapped in LHC collimator
A. Freyberg Aug 2016 ECT’16 =>
Gabriel Palacios 08/30/ kV guns CST + GPT Gabriel Palacios 08/30/18.
350kV and 500kV Yan 9/8.
Simulation of Emittance
Gabriel Palacios 09/04/18 Tests for Joe Gabriel Palacios 09/04/18.
Going round in circles… Going round in circles…
MECH 3550 : Simulation & Visualization
Bunker Wall Design Wall ESS
(vertical cryostat, Gersemi)
Now Buy Best External Door Hardware from Doorhardware
UITF: T-cathode electrode, BPM [kV]
Presentation transcript:

Wien filter 2 06/05/2019 Gabriel Palacios

Details Solidworks model CST simulations |E| Ey Ez Comparing 20 kV vs 40 kV feedthroughs

Solidworks model

Solidworks model This 40 kV feedthrough prevents us from having to change the pipe to the 1.5” OD that interferes with the coils. The Kovar recess measurements where “eyeballed”. The HV spring guide connector requires mods. 0.06” gap Between 1” OD and 0.75 OD insulator

Solidworks model The tip rounded could be removed to improve contact with feedthrough Kovar recess.

Solidworks model Modeled in Solidworks 40 KV Single Pin 21194-01-CF

Solidworks model Modeled in Solidworks Based on Electrical feedthrough CAD 32893-0020

CST simulations: electric field norm |E| 10 [MV/m] scale max

CST simulations: electric field norm |E| ~5 [MV/m] ~5.4 [MV/m] ~6.8 [MV/m] 10 [MV/m] scale max ~4.1 [MV/m]

CST simulations: electric field norm |E| 10 [MV/m] scale max 2.6 [MV/m] at cusp 2.5 [MV/m] at cusp

CST simulations: electric field norm |E| 5 [MV/m] scale max

CST simulations: electric field norm |E| 5 [MV/m] scale max

CST simulations: electric field norm |E| 5 [MV/m] scale max

CST simulations: electric field vertical Ey 3 [MV/m] scale max

CST simulations: electric field vertical Ey ~2.6 [MV/m] red region ~0.8 [MV/m] ~2.3 [MV/m] blue region 3 [MV/m] scale max

CST simulations: electric field vertical Ey 3 [MV/m] scale max ~2.7 [MV/m] at cusp 1.4 [MV/m] at red region -2 [MV/m] at blue region

CST simulations: electric field longitudinal Ez 5 [MV/m] scale max

CST simulations: electric field longitudinal Ez ~-3.1 [MV/m] 5 [MV/m] scale max ~-5.5 [MV/m]

CST simulations: electric field longitudinal Ez 5 [MV/m] scale max ~-1.7 [MV/m] at cusp ~-2.5 [MV/m] at cusp

CST simulations: electric field norm |E| ~5 [MV/m] ~10 [MV/m] red region ~5.4 [MV/m] ~5 [MV/m] ~6.8 [MV/m] ~4.3 [MV/m] ~4.1 [MV/m] ~5.2 [MV/m]

Fin