Gary Fitzjarrell AIA, CHFM Brent Rutherford CEM, CHFM, CBCP

Slides:



Advertisements
Similar presentations
Center for Innovative School Facilities Brian Butler PE, LEED AP Associate Principal / Sr. Mechanical Engineer Long Range Facility Planning David Chesley.
Advertisements

Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
Managing Risk: Turning the Titanic Into the Love Boat Kevin Lyday, CISSP, PMP, CIPP/G, CEA, etc. Associate Director, Information Resources, Office of Public.
Continuous Value Enhancement Process
Capital Planning Update 1 Senate Fiscal Committee/COPE Presentation January 3, 2012.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
IT ASSET MANAGEMENT (From Booz-Allen & Hamilton).
Practical Ways for Towns to Save Money with Clean Energy Projects Doreen Hamilton April 30, 2014.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
LECTURE ESSENCE AND STRUCTURE OF BUSINESS PLAN. 1.The concept of business – plan 2.Contents (parts) of business plan.
Oklahoma City Community College Strategic Planning Approach Cuts Cost….Improves the Learning Environment Smart and Sustainable Campuses Conference Monday,
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Project Planning and Capital Budgeting
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
1 Comparison of energy systems: On methods, parameters and system boundaries Leif Gustavsson Mid-Sweden University September.
Industrial Engineering Roles In Industry
1 Availability Modeling of Cooling Water Pumps to Assess if a Replacement Option is Economically Feasible. Dr. Salman Mishari.
Development & Deployment of a Risk Based Compliance Turnaround Strategy John R. Pinion II Genentech, Inc. The FDA Regulatory and Compliance Symposium August.
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
The Essential Energy Savings Performance Contracting Program Design South Carolina ESC November 29, 2012 Presented by: Jim Ploger.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
hydroAMP asset management framework
Effective Energy Management. 1.Develop baseline 2.Identify and quantify savings opportunities 3.Measure and benchmark to sustain efforts.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
CH 2 – Heat Rej. + Evap. Cooling Towards sustainable buildings…
VP Quarterly Report on Strategies Q3– February 2, 2016 Robbie Peters, Vice President, Financial Services & Chief Financial Officer Vision: Healthy people,
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Project Management Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor of Industrial Engineering and Industrial Management Mercer.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Road Investment Decision Framework
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Asset Integrity & Reliability Management A Strategic Perspective Andreas de Vries Doha, 15 – 18 May 2016.
Bridging Business & Buildings:
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Asset Management in the Arab Region and its Role in Improved Performance and Utility Efficiency Lina Sheqem Cowater International.
ITIL: Service Transition
Danube Water Conference 2017, Vienna
APTA Sustainability Workshop 2016
Fort Stanwix National Monument Energy Audit Contract
Capital Planning & Risk Management
2017/18 SIP Request Process September 2016.
Guaranteed Energy Savings Performance Contracting
NC AWWA-WEA 97th Annual Conference
Career Pictures.
Compensation Committee 2017 Goals – Updated
Mobile workforce management solution
Landscape management and Operations accreditation Program
Enterprise Asset Management Proposal to Expand AiM :
APTA Sustainability Workshop 2016
Nlyte for Colocation Providers
GMHC Board of Directors November 14, 2016
Catalyst Pitchback Energy Efficiency as a Service
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Capital Improvements Planning
Sarbanes-Oxley Act (404) An IT Viewpoint
Stevenson 5 Capacity Planning.
Capital Improvement Plans
Implementing Value-Driven Asset Management in a Smaller City
Define Your IT Strategy
An IT Viewpoint Darin Kreimeyer, Senior Manager Newel Linford, Manager
Maintenance Opportunities
KEY INITIATIVE Financial Data and Analytics
Presentation transcript:

Gary Fitzjarrell AIA, CHFM Brent Rutherford CEM, CHFM, CBCP Using Data Analytics to Develop a Comprehensive, Reliable Capital Infrastructure Program Gary Fitzjarrell AIA, CHFM Brent Rutherford CEM, CHFM, CBCP

What are Data Analytics Align Strategies Internal Comparisons External Comparisons Establishing a Capital Plan Forecasting Future Needs Optimize Capital Investments Empower Sustainability Stewardship For Facilities Improve Effectiveness of O&M Identify Energy Opportunities

Facilities Benchmarking & Analysis Establishes a common vocabulary and uses a methodology that makes it easy to communicate the impact of your investments to your facilities and helps communicate your challenges, needs, and successes Establishes parameters to quantify, verify and qualify your capital and operations data to provide a strategic assessment of your facilities Provides life cycle projections to show a cash flow model and budgetary model of when infrastructure needs in your facilities are coming due over the next 5-10 years along with the future risk of system needs within your facilities

Who uses some form of Data Analytics, either internal or 3rd party? Are they proving to be beneficial?

Capital Infrastructure Program for your Healthcare Facility Funding of Equipment Replacements And Improvements to Increase the Reliability and Efficiency of Facility Infrastructure to Best Serve and Support our Patients, Visitors, Caregivers, and Communities.

How many of you have a documented capital infrastructure program? How many years into the future are you planning? A – 1–3 B – 3–5 C – 5–10 D – 10+

All equipment will eventually fail at some point in time, predicting and preparing for that replacement is key Key indicators – unforeseen equipment failures / high maintenance costs / high utility consumption Leveraging the replacement of capital infrastructure to include efficiency and improved energy performance becomes an added benefit and a selling point of a successful program Improved EUI & kBTU/sf – Energy savings/avoidance – Procurement methods

Background Increasing requests for “emergency “ contingency capital to replace failed equipment – run to fail to hold down expenses THR developed initial response plan in 2006 – assessments and capital for immediate need “Emergency” requests for contingency capital rose again – plan not working because entities were not budgeting for infrastructure capital The answer was a comprehensive system-wide program which included a set aside a budget to systematically replace capital infrastructure and provide energy savings projects – administered by internal 3rd party oversight Projects analyzed and prioritized system-wide including input from entities Update plans on 5-6 year cycle Measurement and validation

From the Beginning . . . Begin with the End in Mind Flexibility Using the Right Info to Build & Make the Case “Selling the Plan” - Getting Support / Buy-in Include Energy Savings Perspective - ROI

Implementation Start Slow, Build Momentum Understand Complexity, Manpower Required Include Individual Entity Support Put Steps in Place for Measurement Support of Other Capital Projects - Integration This Photo by Unknown Author is licensed under CC BY-SA-NC

Selling the Plan Examples of failures that have resulted in loss of service / business Avoid cost of “emergency” and routine replacements – from historical data Reliability of infrastructure under plan Comparison to others that have implemented plan Ability to improve efficiency & lower utility consumption This Photo by Unknown Author is licensed under CC BY-NC-ND

Assessments should also include estimated replacement costs Assessment / Need Immense value in having an in-depth, comprehensive assessment of your individual equipment and systems Assessment should include age, physical appearance and condition, accessibility, maintenance records, operational specifications, major components/parts list, and life expectancy under routine maintenance and normal utilization Assessments should also include estimated replacement costs

Assessment Development Establish a standardized equipment assessment criterion and format – include narrative and data Determine Scope Mechanical Plumbing Electrical Vertical Transportation Envelope Tube Systems Kitchen Equipment This Photo by Unknown Author is licensed under CC BY-SA

Assessment Development Assessment Team Selection Competency Experience Include Individual Knowledge 5 - 6 year cycle Prioritization Factors Imminent failure Regulatory issues Efficiency Life cycle Maintenance issues Capacity shortfall This Photo by Unknown Author is licensed under CC BY-SA

Leverage the Plan to Lower Utility Consumption When replacing equipment, evaluate the whole system not just the single device. If replacement of a chiller is needed, analysis of all connected equipment, ie. pumps, controls, or even the cooling towers. As part of assessing your capital plan, review major systems for functional efficiency. Does each system operate at optimum performance criteria? If not, can you plan equipment replacement or augmentation to improve efficiency? Plant Optimization and Boiler Evaluations Chiller Plant efficiency goals of 0.6 kW/ton Evaluate Steam System for losses and suitability (separate Critical Loads, if possible)

Measurement of the Improved Performance Equipment failure avoidance Unexpected equipment failure is unavoidable, however you can minimize it. The THR Infrastructure Capital Program has reduced emergency replacements by 50% Utility/Energy Cost Reduction Utility Bills will decrease due to more efficient operations THR has reduced utilities by over 5% while expanding facilities by over 12% in the past 6 years Improved Reliability While difficult to Quantify, systems are more reliable and therefore resources are more focused on patient comfort and satisfaction.

Wrapping it Up . . . Need for the Plan Sell the Plan #1 (Design Fees) Business Justification Loss of Use Excess Maintenance Costs Energy Performance Sell the Plan #1 (Design Fees) Define Scope / Timeline / Process Build Baseline This Photo by Unknown Author is licensed under CC BY

Wrapping it Up . . . Design and Formulate the Plan Scope / Team / Timeline Assessments Sell the Plan #2 (Project Budget) Business Justification Reliability Measurements This Photo by Unknown Author is licensed under CC BY This Photo by Unknown Author is licensed under CC BY-SA

Wrapping it Up . . . Implement the Plan Projects Performance Measurements Sell the Plan #3 (Renewal) Proven Business Justification Proven Reliability Improved Measurements This Photo by Unknown Author is licensed under CC BY-ND This Photo by Unknown Author is licensed under CC BY-SA

This Photo by Unknown Author is licensed under CC BY This Photo by Unknown Author is lensed under CC BY-NC