Conversion Process Master It

Slides:



Advertisements
Similar presentations
Schedule of Cost of Goods Manufactured
Advertisements

Chapter 2 Job Order Cost Systems.
Chapter 3 - Overhead You will get this Never give up Never surrender!
Click to edit Master title style 1 Job Order Cost Systems 17.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Order Costing Chapter 4 2/14/05.
4 - 1 Job Order Costing Chapter Learning Objective 1 Describe the building-block concepts of costing systems.
ACC3200 Chapter 2: Job Order Costing Job Order Costing.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Managerial Accounting
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
WHAT IS THE PROFIT ON A JERSEY? Does C&C Sports make a profit if a baseball jersey sells for $14.80? What does it really cost C&C Sports to make a baseball.
4 - 1 Job Order Costing – Chapter 4 Describe the building-block concepts of costing systems. Learning Objective 1.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Management Accounting: A Business Partner Chapter 16.
Manufacturing Accounting Chapter Preparing a cost of goods manufacturing schedule. Learning Objective 1.
Accounting Systems for Manufacturing Businesses Chapter 10.
27-1. Job Order Cost Accounting Section 1: Cost Accounting Chapter 27 Section Objectives 1.Explain how a job order cost accounting system operates. McGraw-Hill©
Job-Order Costing Is used when different types of batches or products are produced special order printing, construction, law office.
Cost Accounting Systems
Lecture 6 COSTING SYSTEMS 1 Job Costing Reference : Course Text Chapter 2.
Is it a complex process for Washburn Guitars to accumulate the cost of each Maya Series guitar? 1.Yes 2.No.
Job-Order Costing for Manufacturing & Service Companies
Chapter 17 Job Order Costing
Introduction to Managerial Accounting and Job Order Cost Systems.
CHAPTER TWENTY-EIGHT JOB ORDER SYSTEM. MANUFACTURING BUSINESSES  Makes the items it sells  Accounting is more complicated  Multiple inventory accounts.
Normal Product Costing Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 31.
Accounting for Factory Overhead
Chapter 11 Product Costing in Service and Manufacturing Entities.
Factory Overhead: Planned, Actual, and Applied
Click to edit Master title style 1 Lesson Click to edit Master title style 2 Job Order Cost Systems 19.
Chapter Three Job-Order Costing. 3-2 Types of Product Costing Systems Process Costing Job-order Costing  A company produces many units of a single product.
C1 - 1 Learning Objectives Power Notes 1.Differences Between Managerial and Financial Accounting 2.The Management Accountant in the Organization 3.Manufacturing.
Prepared by Diane Tanner University of North Florida ACG Manufacturing Cost Flows 1-3.
Chapter Three Job-Order Costing. 3-2 Types of Product Costing Systems Process Costing Job-order Costing  A company produces many units of a single product.
JOB ORDER COSTING IS USED IN A MANUFACTURING ENVIRONMENT. THERE ARE UNIQUE CHALLENGES TO RECORD JOURNAL ENTRIES, MAINTAIN THE JOB ORDER COST SHEET AND.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
A control account is a summary account within a general ledger that accumulates the details of an account in a subsidiary ledger.
Copyright © 2015 McGraw-Hill Education. All rights reserved
Job-Order Costing: A Microsoft Excel-Based Approach
Chapter 17 Job Order Costing
Introduction to Cost Accounting and the Job Order Cost Cycle
Prepared by Debby Bloom-Hill CMA, CFM
Chapter 3 Costing Systems: Job Order Costing
summary account A control account is a
Job-Order Costing Chapter 3.
Job-Order Costing: Cost Flows and External Reporting
Systems Design: Job-Order costing
Copyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved.
Copyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved.
Job Order and Process Costing
Job Order Costing Job Order costing is used in a
Cost Accounting and Reporting Systems
Job Order Costing Chapter 2.
2 Job Order Costing Learning Objectives
Systems Design: Job-Order Costing
Recording and Evaluating Conversion Process Activities
Job Order Costing and Analysis
Cost Accounting-I Recording System.
17 Job Order Costing Financial and Managerial Accounting 13e
Chapter 2 Classifying Costs
Chapter 17 Job Order Costing
Product Costing Session Five MBA 502B Managerial Accounting
Job Costing, Overhead Calculation and Flow of Costs
Classification of Cost
Chapter 17 Job Order Costing Student Version
Manufacturing Cost Elements 1. Cost Concepts Cost refers the amount of expenses spent to generate product or services. Cost refers expenditure that may.
Product Costing – Assigning Product Costs
The Master Budget and Flexible Budgeting
1 CHAPTER M2 Classifying Costs © 2007 Pearson Custom Publishing.
Principles of Cost Accounting 15th edition
2 Job Order Costing Managerial Accounting 13e C H A P T E R Warren
Presentation transcript:

Conversion Process Master It When I started teaching this in 2006, one of the biggest challenges as I left my training, do I know this well enough to teach and can I make this interesting. During my MBA program I just finished Managerial Accounting and boy was it a snoozer to me. Six hours every Saturday morning!

Conversion Activities (Module 2 Recap) Schedule production Obtain raw materials Use labor and other manufacturing resources to make products Store finished goods until sold Here are the parts of the conversion process. Bring them to life the best you can for students. Very foreign topic to them.

Schedule Production Scheduling the use of machines and the arrival of materials is an important part of controlling and reducing costs. Not a simple problem!

Please take a look at this slide closely, does this look like a simple process to you?

Schedule Production A company with 800 production workers, each get paid $18 an hour, will lose $14,400 in labor costs alone for every hour that it has to stop production due to shortages of raw material.

The March 2011 Great Tohoku Earthquake and Tsunami Population centers closed due to leaking radiation Highways and railways closed Electricity shortages Ports were closed

The March 2011 Great Tohoku Earthquake and Tsunami Motor Vehicle has over 15,000 parts Lack of an essential component may halt the completion of vehicles or slowdown Japan is the 2nd largest vehicle producing nation behind China (Source: Congressional Research Service)

Schedule Production Machine Setups are adjustments made to machines to get them ready to manufacture the next type of product.

Fully flexible factories Common global components Schedule Production Fully flexible factories Common global components Standardized assembly procedures Collaborative supplier relationships GM and Ford took 24 hours to make one car, Honda and Toyota were at 19, GM and Ford had one plant per vehicle, Honda and Toyota had fully flexible factories.

GM and Ford took 24 hours to make one car, Honda and Toyota were at 19, GM and Ford had one plant per vehicle, Honda and Toyota had fully flexible factories. Oldsmobile Delta 88: 1988 bought with 92,000 miles, stolen at 163,000 miles

Production Floor Layout (Cell Locations) I am coming to your house, you are to put the following items out for the meal. You are going to put it on this hutch, what order will you put them in? Mathematical Models Used for Production Runs

Production Floor Layout (Cell Locations) I am coming to your house, you are to put the following items out for the meal. You are going to put it on this hutch, what order will you put them in? Mathematical Models Used for Production Runs

Obtain Direct Materials Direct Materials and other supplies used in the production process are acquired and stored.

Obtain Direct Materials

Use Labor and Other Manufacturing Resources to Make Products Direct Labor Direct Materials Manufacturing Overhead Rent on manufacturing facilities Insurance on the direct materials inventory Heat, light, and power used Engineering costs of designing products and scheduling the production process 70% or more of the costs of total production Indirect materials Indirect labor

Store Finished Goods Until Sold When manufacturing is complete, finished products move from the production floor to storage until a shipping order is received.

Chapter 3 Completed Understanding the conversion process

Chapter 9 Recording and Evaluating Conversion Process Activities Navs Corporate Tower The CEO The Associates Chapter 9 Recording and Evaluating Conversion Process Activities Sales -COGS Gross Margin -S & A Expenses INCOME STATEMENT Navs Manufacturing Facility

Chapter 9 Recording and Evaluating Conversion Process Activities BALANCE SHEET Inventory Navs Manufacturing Facility

Finished Goods Warehouse Inventory Focus Manufacturing Floor Materials Warehouse Finished Goods Warehouse There are three inventory accounts in the general ledger which reflects different aspects of the manufacturing process (control accounts).

Use Labor and Other Manufacturing Resources to Make Products Direct Materials get recorded in the Direct Materials Inventory Account Materials Warehouse Indirect Materials get recorded in the Supplies Account

Inventory Focus Manufacturing Floor When direct materials get requisitioned into the manufacturing process they move into Work-In-Process Inventory Account.

Finished Goods Warehouse Inventory Focus When Work-In-Process Inventory gets completed and stored in the finished goods warehouse it get recorded in Finished Goods Inventory. Finished Goods Warehouse

Work-In-Process Inventory Finished Goods Inventory Inventory Focus Manufacturing Floor Materials Warehouse Finished Goods Warehouse Direct Materials Inventory Work-In-Process Inventory Finished Goods Inventory

Inventory Focus Navs Manufacturing Facility Purchased $5,000 of direct materials on account Direct Materials Inventory $5,000 Accounts Payable $5,000 2) Requisitioned $2,000 of direct materials into production. Work-In-Process Inventory $2,000 Direct Materials Inventory $2,000 Completed jobs costing $1,500 Finished Goods $1,500 Work-In-Process Inventory $1,500

Navs Manufacturing Facility Direct Labor Focus Direct Labor is the cost of employees who actually work on the product. Manufacturing Floor Direct Labor costs are recorded to work-in-process

Indirect Labor Focus Indirect labor is the cost of employees who support manufacturing operations.

Manufacturing Overhead Manufacturing Overhead is a temporary account used to reflect the indirect manufacturing costs of the period. Rent on manufacturing facilities Insurance on the direct materials inventory Heat, light, and power used Engineering costs of designing products and scheduling the production process 70% or more of the costs of total production Indirect materials Indirect labor

Manufacturing Overhead Actual Applied The amount of overhead incurred during the accounting cycle. The amount of overhead allocated to the work-in-process during the accounting cycle.

Manufacturing Overhead When we apply MOH, we apply it to Work-In-Process Inventory. Use a predetermined rate to apply it to WIP using Activity Based Costing.

Selling Inventory This is why we are in business! COGS FG A/R Sales

Entries, Entries, Entries DMI Supplies AP Purchase direct and indirect materials on account Direct materials were issued into production Indirect materials were issued into production Applied overhead to production Paid the electricity bill Paid the direct labor Paid the indirect labor Completed jobs Sold inventory 2. WIP DMI 3. MOH Supplies 4. WIP MOH 5. MOH Cash 6. WIP Cash 7. MOH Cash 8. FG WIP 9. COGS FG

Problem One: Classifying Costs Navs Corporation makes pool tables. Each table consists of wood, felt, glue, screws, and metal.

Classifying Costs Direct materials cost Direct labor cost Manufacturing overhead cost Selling and administrative cost 1. Cost of wood.

Classifying Costs Direct materials cost Direct labor cost Manufacturing overhead cost Selling and administrative cost 2. Cost of Cost of shipping crates.

Classifying Costs Direct materials cost Direct labor cost Manufacturing overhead cost Selling and administrative cost 3. Cost of glue.

Classifying Costs Direct materials cost Direct labor cost Manufacturing overhead cost Selling and administrative cost 4. Depreciation on the factory equipment.

Classifying Costs Direct materials cost Direct labor cost Manufacturing overhead cost Selling and administrative cost 5. Office workers’ salaries.

Classifying Costs Direct materials cost Direct labor cost Manufacturing overhead cost Selling and administrative cost 6. Production supervisors’ salaries.

Classifying Costs Direct materials cost Direct labor cost Manufacturing overhead cost Selling and administrative cost 7. Rent on finished goods warehouse.

Classifying Costs Direct materials cost Direct labor cost Manufacturing overhead cost Selling and administrative cost 8. Rent on production facilities.

Classifying Costs Direct materials cost Direct labor cost Manufacturing overhead cost Selling and administrative cost 9. Wages of assembly workers.

Problem 2: Calculating Overhead Navs Corporation applies unit-related manufacturing overhead on the basis of machine hours. The following unit-related overhead data were accumulated by the accounting department: Estimated Actual Machine hours 500,000 400,000 Overhead costs $1,500,000 $1,300,000

Problem 2: Calculating Overhead Estimated Actual Machine hours 500,000 400,000 Overhead costs $1,500,000 $1,300,000 What is the predetermined rate? Estimated rate is always the estimate/estimate Always dollars divided by activity $1,500,000/500,000 = $3 per hour

Problem 2: Calculating Overhead Estimated Actual Machine hours 500,000 400,000 Overhead costs $1,500,000 $1,300,000 2. Journalize the applied manufacturing overhead. $3 x 400,000 = $1,200,000 WIP 1,200,000 MOH 1,200,000

Problem 2: Calculating Overhead Estimated Actual Machine hours 500,000 400,000 Overhead costs $1,500,000 $1,300,000 3. Was overhead over-or underapplied? Underapplied, $1,200,000 is less than $1,300,000

Problem 2: Calculating Overhead Estimated Actual Machine hours 500,000 400,000 Overhead costs $1,500,000 $1,300,000 4. What is the amount of over- or underapplied overhead? Underapplied $1,200,000 is less than $1,300,000, the amount is $100,000

Problem 2: Calculating Overhead Manufacturing Overhead 1,300,000 1,200,000 5. Close out MOH COGS 100,000 MOH 100,000

Problem 3: Conversion Entries 1. Direct material inventory 55,000 Supplies 45,000 Accounts payable 100,000 Answer: Purchased $55,000 of direct materials and $45,000 of indirect materials (supplies), both on account.

Problem 3: Conversion Entries 2. Work-in-process inventory 60,000 Direct materials inventory 60,000 Answer: Direct Materials of $60,000 were issued into production.

Problem 3: Conversion Entries 3. Manufacturing overhead 45,000 Manufacturing supplies 45,000 Answer: Indirect materials of $45,000 were issued into production.

Problem 3: Conversion Entries 4. Work-in-process inventory 17,000 Manufacturing overhead 14,000 Cash 31,000 Answer: Paid $31,000 in wages to employees: $17,000 was direct labor and $14,000 was indirect labor.

Problem 3: Conversion Entries 5. Manufacturing overhead 3,000 Cash 3,000 Answer: Paid the electricity bill for the factory when received, $3,000.

Problem 3: Conversion Entries 6. Work-in-process inventory 54,000 Manufacturing overhead 54,000 Answer: Manufacturing overhead of $54,000 was applied to production.

Problem 3: Conversion Entries 7. Work-in-process inventory 63,000 Manufacturing overhead 63,000 Answer: Manufacturing overhead of $63,000 was applied to production.

Problem 3: Conversion Entries 8. Finished goods 175,000 Work-in-process inventory 175,000 Answer: Completed jobs costing $175,000.

Cheesecake Factory Wal-Bots