TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Stephan Haensel - 7th SiLC Meeting - CERN Combined test beam with LCTPC - an update on present status and schedule S. Haensel 1, T. Bergauer 1, M. Dragicevic.
Frank Hartmann IEKP TEC Meeting July 03 Ring 6 mechanical Qualification In a nutshell: rel. precision agreement (Aa-Ka): 3-5µm (  rot.) abs precision.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS TRACKER STATUS REPORT Dimitri PandoulasCMS Week
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Rod adaptors for module tests Module positioning studies
SIT AND FTD DESIGN FOR ILD
System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing.
Design and fabrication of Endcap prototype sensors (petalet)
Status Brussels GANTRY
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
Hamburg Bonding Report
Results from module testing
UCSB Testing Status Anthony Affolder
Recent TOB Developments
Vienna Module Production
CMS Perugia Modules Production Review
Module production in Italy
Operations/Failure Analysis
Bari production centre resp. M. de Palma
Module Production in Brussels
CMS Perugia Gantry Status Report
US Hybrid/Module/Rod Testing Model
L.Fiore Gantry Meeting during the CMS TK week
FNAL Hybrid Testing Status
Module Production in Brussels
US Module Testing Progress Report
Operations/Failure Analysis
TEC module quality overview
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
First prototype module released from the assembling platform
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik HEPHY - VIENNA TEC Ring 2 module prototypes First 4 prototypes with Dorazil hybrids (6 APV’s) ready to form Ring 2 of one TEC petal Ring 2 normal 30200020001588 30200020001589 Ring 2 stereo 30200020001590 30200020001591 Testing : I - V Curves, Tests with ARC System, 3 passive thermal cycles down to about -20 degrees. Results before and after this cycling are consistent J. Hrubec / Inst. für Hochenergiephysik CMS-week Sept. 2003

Ring 2 normal Ring 2 stereo J. Hrubec / Inst. für Hochenergiephysik TEC - Ring 2 modules Ring 2 normal Ring 2 stereo J. Hrubec / Inst. für Hochenergiephysik CMS-week Sept. 2003

J. Hrubec / Inst. für Hochenergiephysik Bonding platform J. Hrubec / Inst. für Hochenergiephysik CMS-week Sept. 2003

Test with ARC system Zoom: missing bonds on hybrid, look closer at channel 257 J. Hrubec / Inst. für Hochenergiephysik CMS-week Sept. 2003

Module 30200020001590 repair APV 2 channel 0 ff Pitch adapter channel 256 ff Residues between 257 and 259 removed after this photo J. Hrubec / Inst. für Hochenergiephysik CMS-week Sept. 2003

Dummy module Bonding tests for reduced support of the pitch adapter J. Hrubec / Inst. für Hochenergiephysik CMS-week Sept. 2003

J. Hrubec / Inst. für Hochenergiephysik Next steps 3 pairs of final hybrids already in Vienna No bonding problems expected with shorter spacers for the pitch adapter Need to adapt assembly plates and bonding platform to new frame design Final automatisation for insertion of data to the database Implement Aachen HV unit to the ARC test system J. Hrubec / Inst. für Hochenergiephysik CMS-week Sept. 2003