FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.

Slides:



Advertisements
Similar presentations
Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
Advertisements

1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
Defect Analyzer for Rods Patrick Gartung. Installation Tried to install and compile on my desktop –Fermi Linux LTS 3.0 –Newer system QT library caused.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
Strasbourg status Ring 7 pilot run François Didierjean.
Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Bonding study of wrapping part of PA1/2
Status Report on Bonding at Catania
UCSB Hybrid Bonding & Testing
FNAL Production Experience
Hybrid & Module Testing Status
US Module Production Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Unexpected Failures of Modules on Rods
Vienna Module Production
Module Failures on RODs
FNAL Module Testing Status
On behalf of the US TOB testing group
Discoloration of Passitivation
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Hybrid Status/Deliveries
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
Passitivation Location
FNAL Hybrid Testing Status
Module Testing Status Week of 6/14-6/20.
Production Status 39 modules produced
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Status of 44 ARCS tested TOB modules, June 24, 2004
FNAL Hybrid Testing Status
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Is Increased Bias Current and CMN Correlated?
FNAL module testing summary
Wirebonding UCSB FNAL Machines
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting bonding parameters on a case by case basis for the RMT modules we were able to eliminate all of the sensor-to-PA bond repairs. Last fall we reported a 2% repair rate Pull test results for the RMT PA’s were still low (6-8 grams) even with the bond parameter tuning, but with the transition to Planar PA’s this is no longer an issue. See the enclosed histogram. Bonding time for the Planar modules is typically around 10 minutes. An additional 15 minutes is needed for the sensor-to-PA pull tests and rebonding. We are assuming that pull tests will not be done for the majority of modules during normal production. With the change in the way ST sensors are tested data is no longer entered into the DB in a standard way, and this is giving us difficulties in determining bad channel information for wire bond skips and may also lead to difficulties with the Bonding interface. Bonding meeting February 2004 Lenny Spiegel, FNAL

FNAL Bonding Average pull strengths from the every 50th wire sen-to-PA pull tests. Modules 702-708 have RMT PAs; modules 709-715 have Planar PA’s. Bonding meeting February 2004 Lenny Spiegel, FNAL